HomeMy WebLinkAbout2004 CON Marcotte & Hearnes - Change Order #9 Fire Station #34CHANGE OR TO (Contractor): Marcotte + Hearne Builders C/O Number: is! O Initiation Date: 11696 Sorrento Valley Rd. Ste 200 Project: San Diego, CA 92121 Contract No.: 9 October 11, 2004 National City FireStation34 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. Added 2'-6" stem wall shown on detail 9/S4.2 to a 6" curb shown on 1/S4.1 at gridline 3 between D & F and gridline D between 3 & 4 per RFI 65 [M+H COR 21] $ 2,929 2. Additional demolition of existing driveway at 1506 C Avenue per RFI 102 [M+H COR 30] $ 439 REASON FOR CHANGE: 1. The additional 2'-6" stem wall was needed because the sidewalk at this location is to be 2' higher (see sheet C4) than finished floor. 2. The existing driveway at 1506 C Avenue required additional demolition due to the fact that the driveway was 6" higher than the flow line for the gutter at the Cul de sac and did not meet the correct slope. COST RECONCILIATION: Costs were reviewed by the architect and CM and negotiated to the satisfaction of the City. Construction Contract Accounting Summary: The original Contract Amount $6,974,585 Net change by previously authorized Change Orders $51,985 The Contract Amount prior to this Change Orders S7,026,570 With this Change Order request the Contract cost is increased by $3,368 New Contract Amount S7,029,938 Change in Contract Time: 0 days Contract Completion Date: Recommen ed for Approval by: CO STCTION MANAGER / R&S PR Approved b r CONTRACTOR/ OWNER/ City Of a r onal City Distribution: CHITECT / Jeff Katz Architecture e Builders /D/Lri/oi ity Of National City (original w/all documentation) MH Builders (copy w/ all documentation) Rudolph and Sletten, Inc. (copy w/all documentation) Jeff Katz Architecture (copy w/all documentation) DATE DATE DATE DATE ORATFO Ig sg RUDOLPH'ND SLETTEN GENERAL AND ENGINEERING CONTRACTORS October 1 I, 2004 City of National City 1243 National City Blvd. National City, CA 91950 Attn: Stephen Kirkpatrick Reference: National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 Subject:Recommendation to referenced CORs submitted by M+H Builders Steve: This letter is to transmit our review comments on the following change order submitted by M—H Builders: 1. COR 021 08/10/04 — Added 2'-6" stem wall shown on detail 9/S4.2 to a 6" curb shown on 1/S4.1 at gridline 3 between D & F and gridline D between 3 & 4 per RFI 65 a. Additional back up required for material and labor hours for the form work and concrete b. The additional back up was review by Rudolph and Sletten with M+H Builders and revised to match what was required - approved with revised addition back up. 2. COR 030 9/27/04 - Additional demolition of existing driveway at 1506 C Avenue per RFI 102 - approved as submitted. We recommend the attached change orders be approved for the submitted amount of $ 3.368. Please notify me if any additional information is required to process this change order. i may be reached by phone at 619-474-6944, or by email at roman rncnaughton@rscont.com. Sincerely, Rudolph and Sletten, Inc. Roman McNaughton Project Engineer c: Jeff Katz — JKA/COR 9 file RUDOLPH AND KITTEN, INC: 10935 VISTA SORIIRNTO PARKWAY, SUI'IT 100 SAN DIUGO, CALIFORNIA 92130 TEL. 858.259.6262 FAX. 858.259.8282 MARCOTTE HEARNE BUILDERS, INC. Tuesday, September 07. 2004 Mr. Howard Mills Rudolph & Sletten 10955 Vista Sorrento Pkwy Ste. 100 San Diego. CA 92130 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04-003 Via Fax: 8582598282 Subj: Marcotte + Hearne Builders Inc. Change Order Request No 021 001 Dear Sir: The Contract adjustment required as a result of Extend 6" curb to 3'-0" Stem ':'iall RFI 065 RFI 65 - Cost associated with extending 6" curb shown on detail 1/S4 1 to 2' s:em wall shown on detail 9/S4.2 at gridline 3 between D & F and Gridline D between 3 & 4 Change Order Request No. 021.001 is $ ark The incorporation of this revision into the contractual scope of work wife require = working day not included in our current schedule. The job schedule will be adjusted according!; 73 show the effect of this revision on the final project completion date. The terms (cost and schedi'e impact) of this change order request are subject to review and e re -quote if not accepted withi_ 14 days of its issuance. We HAVE preceded with this revised work. Please issue an authorizaticr a-d/or change order. if you have any questions or comments pertaining to this matter, please contact :he undersigned. :espectfuliy, Quotation Accepted By: i' ` , ;asod Sandl&rs Representing: Project Engineer Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 Jeff Katz Architecture. 619-474-6926 M+HB office — 858-793-4101 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel. 858-793-4101 Fax: 858-793-4102 JOB NO. 04-003 COR NO. 021.1 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 Extend 6" Curb to 3'-0" Stem Wall SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE Additional Formwork and concrete to extend curb to stem wall Rebar Bighorn Construction Minshew 52, $280 SUBTOTAL OH+P $3,301 rev 17o Bond Premium $3 f.1 Change Order Total $3,3341 l 7+' lets) $3,144 ; c�2 $157 13? 31 04 10:422a lahorn construe an camp. 7605°i7514 p. 762 Poinsettia Ave. San Afarcos, CA 92069. 8-31-04 BIGHORN cnsmnciion c©, Lie. # 597866 To: Marcotte & Hearne Builders Attn: Wayne Powda rly/Ji' )n Sanders Re: National City Fire Stathn Subject: R.F.Q.i 024 Total: $2863.67 Wayne, 6" Curb along 3 Line bbiween D & P Line between 3 & $ changed from 6' x 6" a 6" Cast in Place Wall as mush as 3'1' tall due to exterior finish surface co;:ditio Approximate length is 36 L.F. Concrete Lumber Rental Items Concrete Pump use Labor Sincerely, Drew Olwell 3 cv at 87.60 81.30—tax 10 a`k.et'/,' MDO at 54.55 2 x 4 400 1..I . at 45 L.F. Jallm Brackets 150 ea. at .40 Turn Bugles 10 at 2.75 26 hrs. at 65.00 Fora, Pour, Strip, Clean $262.80 2. o,1 545,50 180,00 60.00 27.50 100.00 1690.00. 2865.80 15% 429.87 3295.67 6" Curb Credit 36 L.F. (&12 L.F.) 432.00 Total 2863.67 (760) 727-88; FAX (760) 727-b3,3 urh to y 2 158. 324 1 2,1--5Z -1-0,AL Ed Wd£9:T© 1702E I£ '""t1 Z0T V£6L : 'ON Xdld DNI sear:I ns aNeib H 311 L73cibW : 'r:�' Change Order BIGHORN CONSTRUCTION 762 POINSETTIA AVE. San Marcos CA, 92069 Phone: (760) 727-8837 Fax: (760) 591-7514 Lic. = 597866 Date of work _ r ormed: '.3 - -- General Contractor: Pro?ect Name: C f L; Change order -:umber: Original cent -act date: Change (add or delete) tine following work to the original contract: 1_'lSaterial Description Volume 1 Quantit (Lea c1" 1,J o_ r _ Labor Description Title Hours Total We agree to furnish labor & materials complete in Accordance with the above specifications. General- �� - i t c Date:, Contrac �.. Above additional wor'.: to be performed under ti_ same conditions as specified in the original conic act unless otherwise stipulated. Sub - Contractor: %// Lv(,vz raj Date: "- Note: This change order becomes part of the original contract Change Order BIGHORN CONSTRUCTION 762 POINSETTIA AVE. San Marcos CA, 92069 Phone: (760) 727-8S37 Fax: (760) 591-7514 Lic.:4 597866 Date of wok: cerfarmed: S q-• General Cee_actor: Pro ec: Name: //C r ! ) Change order : =nber: Original conc_a_: date: I Change (add or delete) the following work to the original contract: Material Description 'Volume Quantit> • 2 Labor Description 1 Title Hours Total /=l,Jl'r • L �l :e agree to furnish labor a: materials complete in Accordance with the above specifications. General- ( z., Contractor. Above additional work to be performed under the same conditions as specified in the original contrue unless otherwise stipulate; Sub - Contractor: Date: Note: This change order becomes part of the original contract Change Order BIGHORN CONSTRUCTION 762 POINSE 1 l IA AVE. San Marcos CA, 92069 Phone: (760) 727-8337 Fay.: (760) 591-7514 Lic. r 597866 Date of work : rfo:nied: Gene C=actor: rc eet Name:. ,/ t - F r� Change crder:umher: Ori=final cot -act date: Change (add or delete.) the following work to the original contract. fvlaterial Description % /� /.I GD(/ (NU C T i2 ! olu ue Quantit} (t+ C, ='� C:-Ki G-���� i� T���r�r Labor Description Title Hours ! Tot., We agree to furnish tabor & materials complete in Accordance with the above specifications. General Contractor:_ — lti Above additional work to be performed under th _- same conditions as specified in the original contra c: unless otherwise stipulated.. Sub Date:, v / Contractor: / �( . Date: . - Note: This change order becomes part of the original contract Change Order BIGHORN CONSTRUCTION 762 POIN'SE 1 1 IA AVE. San Marcos CA, 92069 Phone: (760) 727-8837 Fax: (760) 591-7514 Lic. # 597866 Date o�R'Jr'�i '�'"- tOrnled: C� - General Cen:rac-tor: Project Name: A/` ,!_ Change order timer: Original con:act date: Change (add or delete) the follov.ing work to the original contract: Material Description v, (c) rnv./,.L fr� Volume Quantit_: v' ^'CC.v Jig Labor Description Title Hours Total We agree to furnish labor & materials complete in Accordance with the above specifications. Above additional work to be performed under the - same conditions as specified in the original contr ;c unless otherwise' stipulated. General- Sub- r Contractors_ j -- mate: ` % Contractor: )u Date: e` I/ Note: This change order becomes pars of the original contract National City Fire Station #34 Nl arcore + Hearne Builders Inc. Subcontractor Change Order m&k Down A Subcontractor: ,/N& n aly sis Description: k F 2� COR# Mr : Gm, Item Gerd item item »etas igE Unit Cos: cT %y a<% = 20 ,55 z3Z© Equipment: msaen Item Rem Item 3 \\\ »»: Class 2oe .Class Type Ga:Type Class Type c - ±:cp HOURS (incl. et a& HS ya w\ Totalg' s.'«= 2 2&. C me»»Genara % e,Pz««o:. s:BTOTA c >osa< a a7 za-&6 Ii.-5. ::y y ? y 3a g� woe: wy:\C, w:s:«:« va9 S ec \&• Total y:oe— w Change 2:s &= 2 ' rl • tp, 5zt - '• ; ; ••;:''. • ----; • • ; • ' " : I P • ; 7E • • .f : ;2; !!•;' Request Info Ta: 065.001 PizARCorrE HEARNE uIL_ E , INC. Dete i -J. RFIs with:t--..etted by RFI ri. rube. National City Fire Station 34 333 1;3:S..et National City.00 o o : rc ect. 04-003 Hearne Builder:. RFI =: 095.001 0nswer Con'.pa-y .. t;_ =r. Katz ri 1, , c..,�. c 7290 aqua c Rd. Ste. 106 San Di . 9211:. Co -Respondent S•.:bjen Costlmpa:• Not •Sere Cost I:ttpeet Coi Co: - Answei The:lrneasion es.",eci has:., d revision nre..,ving in.dlce eJ Author Comp=-., 1 1696 Sor, e. : San Die:o. r-. Author RFI Number Discipline pact Corr:ments S. Copie ... r le n' .i re einlncl weii b oans,: o sne- Date Created: 7/15'2; .0uthore.d By . _eson Sanders ..omments Date Requne..d: 7/1512- 'ate Answered: 7/22125e-, the field, The attach dusted accora ngly. Jeff Katz Architecture 7290 Navajo Rd. Suite 106 - San Dieoo, CA 92119 Office (619)698-9177 - Facsimile (619)698-9178 vAvw.jeffitatzarchiteclure.corn \ -7 tionci City Fire De::::rtment Headc_c-ters Station 34 333 E. 16th Stree: Natiz,ncil City, CA 91 • .c,xoaArx.t., RUDOLPH AND SLETTEN ri r;cvxa. r, »xa Y,sgr,tve.N.H7=.'tl CONCPM.acxttxs REQUEST FOR REVISION Date: August 27, 2004 Number of Pages Faxed Company: Marcotte & Hearne, Inc Fax No.: 858.793.4102 Attention: Wayne Powderly Direct No. 858.794.4101 Reference: National City Fire Station #34 R & S Project No. 2848 Subject: M+H COR NO. 21 — EXTENDING 6" CURB TO 2'-6" Wayne, We are in receipt of M+H Change Order Request #21 extending 6" curb to 3'-0 stem wall located at gridline 3 between D & F lines and gridline D between 3 &4 lines. Please provide a detailed break down for the additional lumber, rental items, curb credit and the daily tickets from Bighorn. The concrete quantity needs to be revised because the length of wall is only 36LF not 41 LF. Please call me at (619) 474.6944 if you have any questions. RUDOLPH AND SLETTEN, INC. Roman McNaughton Project Engineer C: jobfile M+H correspondence/Steve Kirkpatrick — N.C./Jeff Katz — JKA/Howard Mills — R&S Aug 11 04 09:09a Jason Sanders 619-474-692G p.5 MARCOTTE HEARNE BUILDERS, INC. Tuesday, August 10, 2004 Mr. Howard Mills Rudolph & Sletten 10955 Vista Sorrento Pkwy Ste. 100 San Diego, CA 92130 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04-003 Via Fax: 8582598282 Subj: Marcotte + Heame Builders Inc. Change Order Request No. 021, Dear Sir: The Contract adjustment required as a result of: Extend 6" curb to 3'-0" Stem Wall RFI 065 RFI 65 - Cost associated with extending 6" curb shown on detail 1/S4.1 to 2'-6" stem wall shown on detail 9/S4.2 at gridline 3 between D & F and Gridline D between 3 & 4. Change Order Request No. 021 is $2,994 The incorporation of this revision into the contractural scope of work will require 0 working day not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE NOT proceeded with this revised work. Please issue an authorization and/or change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Respec = ly, Quotation Accepted By: anders roject Engineer Representing: Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 Jeff Katz Architecture, 619-474-6926 M+HB office - 858-793-4101 Project File 6265 Greenwich Dr., Suite 250, San Diego, CA 92122 Tel. 858-643-9171 Fax: 858-643-9172 08/11/2004 WED 09:13 [TX/RX NO 9209] Z005 Hug 11 04 09:09a Jason Sanders 61S-474-6926 P.6 JOB NO. 04-003 COR NO. 021 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station #34 Extend 6" Curb to 3'-0" Stem Wall SUBCONTRACT NO. DESCRIPTION SUBCONTRACTOR QUOTE Additional Formwork and concrete to extend curb to stem wall Bighom Construction $2,543 Rebar Minshew $280 SUBTOTAL 5%OH+P 1% Bond Premium $2,823 $141 $2,964 $30 Change Order Total $2,994 08/11/2004 WED 09:13 [TX/RX NO 9209] U 006 Aug 11 04 09:09a Jason Sanders Aug 03 04 12:54p lghorn construcion comp. 619-474-6926 p.7 7605917514 p.2 BIGHORN corrauction co. cop M ic. # 597866 762 Poinsettia Ave. (0 San Marcos, CA 92069 76) 727-8837 FAX (760) 727-8330 3-3-04 To: Marcotte & Hearne Builders Attn: Wayne Powderly Re: National City Fire Station Subject: RFQ #024 Total: $2543.00 Wayne, 6" Curb along 3 Line between D & F and D Line between 3 & 4 changed from 6" x 6" Curb to a 6" Cast in Place Wall as much as 3'1" tall due to exterior finish surface conditions. Approximate length is 41LF. Concrete 3 cy x 83 249.00 Lumber 550.00 Misc. Rental Items (Jahn Brackets, etc) 150.00 f Labor 26 hrs @ $65 1690.00 Form,Po ur, Strip/Clean `'Sincerely, c; 0 Drew Olwell 2639.00 15% 396.00 $3035.00 Curb Credit 492.00 $2543.00 08/11/2004 WED 09:13 [TX/RX NO 9209] [7j007 Aug 11 04 09:09a Jason Sanders 08/10/2004 07:30 6195614758 G19-474-6926 MINSHEW BROS STEEL P. PAGE 04/05 National City Fire Station #34 Marcotte + Hearne Builders Inc. Subcontractor Change Order Break Down A Subcontractor: Nj inj y Lc/ el? Description: Aga) ##-- COa# ialysis s5R 7 E c_ Materials: Description Item 1 1PE'a.4 Item 2 Item 3 Item 4 Item 5 Unit Cost QTY (incl. Tax) Total 2�01.6.6 is Equipment: . Description Item 1 Item 2 Item 3 Rem 4 Item 5 Labor: Class Type .Class Type Class Type Class Type SUBTOTAL "A" /,./ oo QTY - Unit Cost' HOURS (incl. Tax) Total Igor., 1c/uRKE . SUBTOTAL "B" ' Prev. Wage. HRS Base Rate Total ,36.44 SUBTOTAL "C" 8£ .44- Commercial General Liability and Property Damage Insurance 1.87 Worker's Compensation Insurance 00 -440 Social Security and Unemployment Taxes • • 11 .4-5 . SUBTOTAL "D" 330$ SUBTOTAL A+B+C+D. Subcontractor Mark Up 15% 3-6•4. Tot<I Subcontrcator Change Order $ 164 e a 08/11/2004 WED 09:13 [TX/RX NO 9209] Z 008 Aug 11 04 O9:O9a e 05 .-'.a C:1 : C2c Jason Sanders Dui 1de-5 619-474-G926 1-: 1 7 o 1 t. p.9 zS I X 4d4 , 5tt ALA R!,S '::71_ 1: i 1 j%. 65.1 08/11/2004 WED 09:13 [TX/RX NO 9209] [U009 Rug 11 04 09:10a Jason Sanders 61S-474-6926 p.10 MARCOrrE f HEARNE BUILDERS, INC. Request for Information 065.001 Detailed, RFIs without Routing Information Grouped by RFI Number National City Fire Station 34 333 16th Street National City, CA 91950 Project # 04-003 Marcotte + Hearne Builders, Inc. Tel: 619-474-6922 Fax: 619-474-6925 RFI #: 065.001 Answer Company Jeff Katz Architecture 7290 Navajo Rd. Ste. 106 San Diego, CA 92119 Answered By Jeff Katz Date Created: 7/15/2004 Author Company Authored By Marcotte + Hearne Builders. Inc. Jason Sanders 11696 Sorrento Valley Rd. Ste. 200 San Diego, CA 92121 Co -Respondent Author RFI Number Subject Footing Detail 9/S4.2 Discipline Architectural Cateaory Cost Impact Amount Sched Impact Days Dwg Impact Not Sure Not Sure Not Sure Cost Impact Comments Cc: Company Name Sched Impact Comments Dwg Impact Comments Contact Name Copies Notes Question Date Required: 7/15/2004 Response to RFI 65 C stated " the length and transition is to be determined by contractor in the geld" Marcotte + Hearne can not verify without dimensions. Please provide dimension for 2'-6" stem wall on sheet 9/S4.2 at location shown on attached sheet (see attached SK-2) Suggestion Answer Date Answered: 7/22/2004 The dimension asked for has to do with the location of the retaining wall, which must be verified in the field. The attached revision drawing indicates calculated dimension to the retaining wall. Curb transition should be adjusted accordingly. 08/11/2004 WED 09:13 [TX/RX NO 9209] [ J010 _Aug 11 04 09:10a Jason Sanders 619-474-6926 p.11 0-1 T Jeff Katz Architecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.jeffkatzarchitecture.com National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 Architect Scpplenental Instruct ie'a PROJECT NG_ 0I1101 AS (-13 DATe, 1/22/0'4 SHEET NO. TITLE: Retolning mall location X-43 SCALE: VS' 08/11/2004 WED 09:13 [TX/RX NO 9209] a011 Rug 05 04 01:02p Marcotte&Hearne Builders 1-619-474-6926 p.7 p .j i : Apr/•,✓AZ- C/ry �� Ira✓ RFl Number D(as Date Submitted To Jork?L Subject 1 a7/.✓4 9.%4/1 Cost Impact NoA/0 Information Requested $512- Request for Information Form Submitted By FMAkeed a 'ssevcnonl Discipline A+ea//rec11/41. Schedule Impact /Voi4%6' Copies To Co -Author Drawing Impact AhNf Date Required kkF.' - A • 1)62. 0.. rooTI04 DETAIL. IS IaoT t"b.LI.ED 0uT FoR._.. LocA.-TEO eiJ Ge tatty 3 $TW p 4 F Si4ouLD GoT Be 91 S4.2 . ?LEA.sG A.DujsE, 6. _ .Fce-n G IXT-A-tip- t ) 54- I i S CAD exa. Foe_ FooTI FI Lcc.ATED pT Gt-tou4E. b 8 4 LA 344. Sidetoo)Y- .. �r TRIS Locarior.] (See c4) is . Z- nr` 14/6//6s ?NA//__. ThrE P/A//Sly FZt o - . 5'M viP 1ooTldl4 f7574 /L R,srf.2_ BE' VSEa ,42T 7W/S L 41/o•J? Yc6As6 ,for/SE. C. pl ASE p,zo91 ZD/m s/o o'1 hwt c✓N m E RTr4cE� S Ey-, Sge(S ArtACME P 5 K • 2-) ,espo+✓se: 07/08/04 Response Date Answered: Answered By: Question A: We take No Exception to the use of Detail 9/S4.2 for the wall located on Gridline 3 Between Grids D & F Question B: We take No Exception to the use of Detail 9/S4.2 at Gridline D between gridlines 3 & 4 instead of Detail 1/S4.1. Question C: See Sheet A2.9, "Curb Plan" for length of 2'-6" Stem Wall. The length and transition is to be determined by the Contractor in the Field. Response By: Jeff Katz, AIA 0 re - 0 POSTS 52--0- 14; 16'-0- FOOTING SCHEDULE IAac 1 WIDTH x LEKTFI DCIPIESS —PE➢60RC G RE)JARAS _ F-1 4'-6" x 4'-6" 16' (6) /5 EA. rim , 2/54.1 6. 5/54.1 f-2 4'-0" x 4'-0' 15' (5) /5 EA. WAY i( B/54.1 F-3 _ 3_-0_ x Y3=0._- iE—__({) 15_CA W�YI 8-i_ F-4 2'-0" x Y-0" le (2) /5 E. WAY f 6/54.7. SYP. SLAB UAW.: s CONC. SIAs-ON-DUDE R65F,/t4415' 0.C. Fa. NA., cadrERED DI Sins OVER 2' Of CLEW SAii) OVER :0 1@ VAPOR B4WWER OVER 2- Of CLEAN Suo �6 CE?PFSSFD SLAB 55F) J- 3 -6 6 HOTE5:4/- 9' BFLDW F.F.E N 24.-9- 1. FOR CWIENSONS ROI SHMAN, SE /4iE TOR_. F$oN FLOOR REFERCWCE WADI EtE1'AI4! - O•-0 , 110.N. 3. SE 1:F.1£RAL HOSES AND tYRCAL XTAA S OW SNEEFS 51.1. 5L2, 5t3. 51.4. 515 ANO 51.6 IE6AVWODO "jRE97l9-41"7 v >` I 5. BF(. IIMUS W/ FOOTINGS SNN1 6E F151 HECK. 6. ALL EXIEROR W .t$ 2.105 0 15' 0.4, FOR OTHER SSW Nm SPACING SEE t DRAWINGS. 7. FCft OCK-IWADDIC WALL SCE . la 110I00W11HOMS 57WE BE 113) N PIKE TO Fapilwirot tSPECroA. 9 (OR OPO*35 54 SNWI PANELS SEE 9Z69-$.Li-6I9 t APPARATUS AREA: L" CONC. UM-ON-CROWE REN r/ 15 7 IS" O.C. u WAY, CENTRE, IN 54A0 OwER6-OFCLASS 2 1 ,CORECAIE BASE 6•-0" 3 1n- 1_.-5 t/2- 15•-5 I/Z" F.D. s-1 1/r) I11.. AI /Pr. Asmc RAN DO Mem WP.J. I la W12x50 W12x50 . 9" INDICATES WJL 3ULL WC*CRff5 6Idt3OF... 1611.r/ 5' HOD CURB MOKJOES SM-CR7R•t WALL •- -='�'= NOICA1ES SW1.000, WALL r/ 6" MOH CURB 'kW Gdxuuts suzni., 1Y51FAt1—_—_—___ fDSr CPsur 5i-i s2" . _OR WP.1�E� 6 F4 INDICATES ROW FIR F-1 AliOBOES OPRESICD SUE SEES s4aPiins auJeawtassoaieu dZDr10-..03 S rvr 0-1 111161111 !T'!P. POR O r 40 ©.y rTPM •A• MALL GAR pltlLY.ffi7 & TINYLS.`OMWNLK TO RCTIAIN Q0 a • 16TH STREET 2F/#O65 • ® OLAW 11R OMI.MRATOR - Rtr110?I[1 Rtte'ONG © $0.05 WTI OTIOJCIllA4L DW G1 TICTflNb OR LPL e ® C T'PRC1 U 0P 0.1L.064 - AU GVA1f. ® GAM oT7RArtOR11TRAD 0 .ram OR t l NET • IMeImNCM GIN. ON'IA10 ® POL.LMP GUST • I1EM,494414G IL 0004401161 • PAN CI CNL pPUWrtl. � r1Mp.Cbl. O rymoMT GCNCr1tI PRAPT1Yl PIT • Obe G1TAL ✓ IO• nneM 4TeRLTG7104 WALL • 1Me omit* ® St"WALL WIN TOR • WI PATML OLAu c6..... .'•.'N1 S.'•.• d•P1eCLt116 WR11 OWNr 01 G•I• .e1 OPT A.1rAl����' 3j 6`LyWAGg Ar1MA•OP'W W N R1TMIIMW G LL • AIL MALI Chl YGe .10001011p001 PAD rag. IAG W f RR rl1•11101ANICAL PRN)04010 ® M0•l�sLpp.4)012iA LOWING tumirtri - � 6LlCi1�� 0 VO Raguram _ RlR1b1d01 0).Ow OOkTPeTM WKlL.'LOP. `tY STOW WrAIZR RLTMR LIMIT • GfeGIVG4=81 CIVIL ® cum N_MI M0 eC'aO.�Ccrk�M1nTM[ 1RAX W _I_ • Re}eRGMGe CITL PRAWIN6IL ci GMG MNCI- M1rtlf • *OR PIIAJ. ® CO1GR119.TAIR O GAS reran LOCMT a1 - WTePtWCe P'SJk11N 9 4' W01 P WT10 b0Pret00. TT. ® 4' MICK CCNCR{TI WOLMYYY. h P. ✓ ACOIS.1WAM NORTH m rec O 0 0 a d 0 3 1 0O 2 A or l 7 A 40 ACCILN*1 cam aft • ryoas tRy�NAII. M. 0 l 7Marrigigia PR�1g/ R Oa1t1 a W.ILI rORVAPa ewµO3"re""11•R ® morrow, Ants rr.e.LANC 9 AFGD1G1AL AMR GR • IfILryOCCtATTTO CUT MCC-pR1}YMRMNQ WICI.a ® R0r4i) I Cr+L ORAWIN6 "1" "A' o �y.T�1!AinBa a T - pN<C1vll �{ r� b.Ga•v. W..urMR At 1 -.• oe. TIT. tI L J cn PTItr�re��(,�����Kx .�rG19091,0=NORT wawa 1• TYiM• q.R 0. ALL RITAWItl IND NM NALL))1 ANM-ORAA1111 COAtN1 Pam 10 ie Ay•��P�• 1 i•AJ11 OPP ^'Z bu KLLYTANG. A WLONG• .Sep 28 04 11:29a Jason Sanders 619-474-6926 p,1 Monday, September 27, 2004 Mr. Howard Mills Rudolph & Sletten 10955 Vista Sorrento Pkwy Ste. 100 San Diego, CA 92130 MARCOTTE HEARNE BUILDERS, INC. Via Fax: 8582598282 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04-003 Subj: Marcotte + Hearne Builders Inc. Change Order Request No. 030, Dear Sir: The Contract adjustment required as a result of: Saw Cut Driveway @ Cul De Sac Request For Information: 102 - Neighbor's Driveway @ Cul De Sac Demo Concrete at neighbors residence located at 1506 "C" Avenue. Change Order Request No. 030 is $439 The incorporation of this revision into the contractual scope of work will require 0 working day not included in our curent schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE preceded with this revised work. Please issue an authorization and/or change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Respectfully Quotation Accepted By: and �rsl Representing: Engineer Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 Jeff Katz Architecture, 619-474-6926 M=HB ogee - 858-793-4101 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel. 858-793-4101 Fax: 858-793-4102 09/28/2004 TUE 11:31 [TX/RX NO 5187] U 001 Sep 2B 04 11:29a Jason Sanders B19-474-6926 p.2 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN JOB NO. 04-003 National City Fire Station #34 COR NO. 030 Remove Concrete at 1506 "C" Avenue SUBCONTRACT NO. DESCRIPTION Saw Cut and Remove Concrete SUBCONTRACTOR Paul Hanson QUOTE $414 SUBTOTAL 5%OH+P 1% Bond Premium Change Order Total $4391 $414 $21 $435 $4 09/28/2004 TUE 11:31 [TX/R.Y NO 5187] IJ 002 Sep,28 04 11:29a Jason Sanders 619-474-6926 p.3 09-27-04 10:13AM FROM- 619-442-9696 T-747 13.002/002 F-614 SUBCONTRACTOR POTENTIAL CHANGE ORDER REQUEST DAT _: 5/6/2004 CHANGE IN WORK NOTIFICATION NUMBER: PCO 10025-001 CONTRACT NUMBER: PHI Job i1 937-04 l.N1A&• JO accrues -rev Er: Ma cO to+HcineBuilders. 11696 Sorrento Valley Rd. Suite 200 San Diego. CA'i2[21 Attu; Wayne PowO Ki r PROJECT NAME: National City Fire St9don F3a LABOR: (Attach takeoff sheet if needed) LABOR HOURS f-t •cSIFICATON x1.0 s1.5 Laborer Foreman 1 REF NUM 1 2 z2D Remove Concrete at 1506'C- Avenue HOURLY DIFF. RATE $ 75.00 LABOR COST $75_C.0 3 4 5 $0.(.0 5010 $ $O.C:O 6 $0.C:0 $0.10 7 8 MATERIALS: REF 1 2 3 4 (Attach t e.c 1 sheet) MATERW . DESCRIPTION OTT UNITS UNIT COST $ $010 50_(:0 TOTAL LABOI MATERIAL. COS r $0.C:0 $O.fO 50.10 5010 5 6 7 8 9 10 11 $ $ $ $0.(.0 $0.00 $01;0 $0.(10 $ $O.CO $0.10 $0(0 12 13 50_C:0 50.C:0 $751Line 1 OTHER COSTS: REF 1 2 3 4 5 6 7 Saw Cut (Attach iterrized intom:ation) DESCRtPT1ON Backhoe 3/4Yard TOTAL MATERIA (7.75% of tine 2) SALES TOTAL LABOR, MATERIAL, AND SALES TAX MARK-UP ON LABOR AND MATERIA L CITY UNITS UNIT COST OTHER COST 3 0.5 Hr Hr $ 90_00 $ 30.00 5 5 - $ $ 270_01 $ 15.0 ) $ $ $ SO Line 2 $0 Liner 3 $75 511 $ Line 4 Line 5 SUBCONTRACTS: (Moon sueconoaaorsponosa0 S0ecoNrRACrOR NAME 1 DESCRIPTION TOTAL OTHER COSTS: MARK-Ulfi (Sum of Lines 4, 5. 6,7) SUBTOTAI .: SUBCONTRACT COSH' $ 3 $ SUBMI1 1 CU BY: Theodore A. Brown SUBCONTRACT COSTS: $O.GLIne 9 seer TOTAL SUBCONTRACT COST::: 5285 $4275 $414 (Total or Linea 9 10) (rare) or Lines a anti 11) GRAND TOTAI MARK-UP: $0.00 Line 10 Line 6 Line 7 Line 6 $O 'Line 1 t $4141 Line 12 TOTAL CHANGE REQUESTED BY SUBCONTRACTOA': DATE 5/6/2004 $414 09/28/2004 TUE 11:31 [TX/RX NO 5187] U 003 MARCOTrE HEARNE BUILDERS, INC. Request for Information 102 Detailed, RFIs without Routing Information Grouped by RFI Number National City Fire Station 34 333 16th Street National City, CA 91950 Project # 04-003 Marcotte + Hearne Builders, Inc. Tel: 619-474-6922 Fax: 619-474-6926 RFI #: 102 Answer Company Jeff Katz Architecture 7290 Navajo Rd. Ste. 106 San Diego, CA 92119 Answered By Jeff Katz Date Created: 7/30/2004 Author Company Authored By Marcotte + Hearne Builders, Inc. Jason Sanders 11696 Sorrento Valley Rd. Ste. 200 San Diego, CA 92121 Co -Respondent Subject Neighbor's Driveway @ Cul De Sac Cost Impact Yes Discipline Architectural Amount Sched Impact Yes Cost Impact Comments There will be additional cost associated with this change. We intend to proceed on a T&M basis unless directed otherwise. Cc: Company Name Question REF: Attached Sheet Author RFI Number Category Days Dwg Impact Not Sure Sched Impact Comments Dwg Impact Comments We need to complete this work on Monday August 2, 2004 to make our concrete pour on Tuesday August 3, 2004. Contact Name Copies Notes Date Required: 7/30/2004 Existing neighbor driveway is 6" higher than the flow line for the gutter at the cul de sac. We propose to demo a portion of the driveway to obtain the correct slope. Is this acceptable? Please advise. Suggestion Answer Date Answered: 08/03/04 New work plan shows extending concrete down drive. Provide additional demo as necessary to accomodate. Response By: Jeff Katz, AIA N C 619-474-6926 Jason Sanders th HP Officejet 6100 Series 6110 Personal Printer/Fax/Copier/Scanner Log for Jason Sanders 619-474-6926 Aug 03 2004 3:48prn Last Transaction Date Time Type Identification Aug 3 3:45prn Fax Sent 1-76-0-591-7514 Duration Pages Result 2:31 OK ref -& ,-Cr/ 7 'r//- PROPOSAL Distribution: x Steve Kirkpatrick x Howard Miiis x Wayne Powderiy x Jason Sanders x Frans T'homassen Cress •f— REQUEST COr r+ -r— PROJ ECT: National City Fire Department Headquarters, Staton 34 National City, California OWNER: City of National City 1243 iNatonal Cidj Boulevard National City, CA 91950 TO: Marcotte + Hearne Builders, Inc. 11696 Sorrento Valley Road, Suite 200 San Diego, Ca. 92121 PROPOSAL REQUEST NO. CO3 DATE: A.prii 22, 212;04 ARCHITECT'S PROJECT NO: 011101 CONTRACT FOR: General Construction CONTRACT DATED: February 17, 2004 Please submit an itemized quotation for chances in the Contract Sum and/or Time inccen:al to proposed modifications to the Contact Documents described herein. Proposal shall be submirec in accordance with Article 26 of the General Conditions. Cost proposal shall be submitted Architect and Consn.ction Manager no laser than A;oril 30, 2004. THIS IS NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 1. Description: Modify the northern termination of C Avenue in accordance with the attached revisions drawings X-03, X-04 and X-05. Work includes demolition of ciJrb, cuter, sidewalk, driveway apron, fencing and paving, as well as construction of new curb and gate , as well as replacing sidewalk and driveway apron, and installation cf new fencing. Be advised that the demo work must be scheduled to allow continued access to tn.e driveway on the :vest side of C Avenue, to the greatest extent possible. Contractor shall coordinate with resident on timinc of demo and reconstruction. Reference Documents: ASI-03, Drav;ing X-03, dated 04/22/04 A.SI-03, DravMg X-04, dated 04/22/04 ASI-03, Dravdng X-05, dated 04/22/04 ARCHITECT: Jeff Katz Architecture 7290 Navajo Road, Suite 106 San Diego, CA. 92119 CONSTRUCTION MANAGER: Rudolph & Sletten 10955 Vista Sorrento Parkway, Suite 100 San Diego, CA 92130 EX'TEND EX5T.F•F_NCI*. TO DEFLECTION WALL Ai\LD G.ITTER ,N.t_FENCE CIVIL DR4L11/‹16' . DRIVEWAY rc77.7=ERENCE. CIVIL DR:-'11.1N65 I 5ID7U.JALK NCE CIVIL DRS 767 —o— 77)T r 1 Jeff Katz Architecture 7290 Navajo Rd, Stale 106 - San Diego, CA 92119 Office (619) 693-9177 - Facsimile (619) 6-96-' 9173 %rim jeffrcaardlitectire.corn National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 &pktInatruc-tic2-5 F1.7ECT IDAT-E, 4/22/04 TrTLE, Rt.-vision 'C' Ave r-b20 - r 2=0. X-05 RELOCATE 5' TYPE & 1 8"/ STORM DRAIN. AS PER. • • APPROVED PROJECT 1588 DY1..j3_7.9 4 LILL__ .RIM '1E 4 /r ASPHALT. 15' CRUSHED, . AGGREGATE BASE 1 CONCRETE: DRIVEW .PER 0- 1 4 SIDEWALK PER C; 7 COUR DINATE LIST FCROSS .GUTTER PER G-- 13 • 102.) \ • • 1 : • / 23.3o GI • • 5: 2'8' ‘173 z-644NT loo N29.70 _.;1 105) --, RADIUS ..PAT 24.78 TC 2 z172-8 G __1TILLAN_ ) pi' ,71-___ _NS213.11-111\IC E,ASTINQ_ 4668.73 ANGLL PT. CURB 100 4954.82 101 4971.94 464 7.00 MID PT. CUR6 1 02 49 67:55 4620.65 C(g2. INLET 103 4960.51 4 618.06 C()R. INLET 104 4933.1 / .4613.89 MID PT. DRIVEWAY 105 4925.2,6 4618.11 PCC CURB 136 4909.49 4 624.00 END CURB 107 494 2 . 2 • . . • . ^G:-.2 CURD GUTTER (53 CURB DATA, RADIUS 3(1_Q(.7 29.50' Dt I I NG 1 H _ _ 212' 3 4 3 fir- 1 9 2" 59'06" 99.36' ;r REMOVE CURB, GUTTER, SIDEWALK, & AC. r"0 -nrr 9,. r ri REMOVE 4"4 TREE Jeff Katz `4rchitecture 7290 Navajo Rd, Suite 106 - San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www.jefficatzarchitecture.com SAWCUT, 2' (TYP) SAWCUTIi DEMO PLAN National City Fire Deportment Headquarters Station 34 333 E. 16th Street National City, CA 91950 sly PROJECT NO.: 011101 DATE: 4/22/04 TITLE: Revision © "C" Ave :zigiannnin SA' Architect Supplemental Instructions ASI-03 SCALE: 1:20 SHEET NO. X-03 CROSS GUTTER PER .G=13 - \\ SD 1 RELOCATE 5' TYPE '6' INLET & 1 8"- STORM DRAIN _AS PER - - :SO : APPROVED -PROJECT 1588 - • 7 4- - 23.47- RIM -19.89 1E- • 4 1 /2" ASPHALT ON 15" CRUSHED AGGREGATE _BASE 1-2' CONCRETE DRIVE.WAY--PER G714 SIDEWALK PER C-7 . - 22.6 CT .TC ------------- •:-33 GT -- - ---- -CURB - GUTTER.---= - - RADIUS . .1 --24.78 T ..::-.......:::..::..: 24.28 GT ...q 1 - - I.. : --- : .. . ,-,1 ; \\ t:-.1------- : -- -(25.39 TC --- _1 3 1 \' 11 SHE PLAN CUPB DATA ;:re) RADIUS 1 DELTH LENGTH 1 30.00' I 32' 34-'36” 17 06 2 29.50 1 19259'06" 99.36' 1 Jeff Katz Architecture 7290 Navajo Rd, Suite 106 - San Dieso, CA 92119 Office (619)698-9177 - Facsimilo (61S) 698-917a vAvw.jeffka=rchitecalre.wm Notional City Fire Deportnit Headquarters Static/1 34 333 E. 16th Street National City, CA 91950 flbct Sup. ..ornrnotol loardezkrn PSWECT 011101 DAT- 4/22 /el: TITLE Revision 0• Ave AS1-03 X-04 • 1:20