HomeMy WebLinkAbout2004 CON Marcotte & Hearnes - Change Order #10 Fire Station #34CHANGE ORDER
C/O Number: 10
TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: October 25, 2004
11696 Sorrento Valley Rd. Ste 200 Project: National City FireStation34
San Diego, CA 92121 Contract No.:
1029
A Change Order is hereby recommended for the following work in the amount identified in this document:
DESCRIPTION OF CHANGE:
1. Modify framing at Doc Room 155 and modify ceiling framing to eliminate on step down and
adjust ceiling heights per RFI 117, 117.001, 117.002, 117.003 and ASI-23 X-55A and X-56 [M+H
COR 34] $ 862
REASON FOR CHANGE:
1. These modifications to the framing and ceiling heights were required to reduce the conflicts with
the glue lam beam that was on site.
COST RECONCILIATION:
Costs were reviewed by the architect and CM and negotiated to the satisfaction of the City.
Construction Contract Accounting Summary:
The original Contract Amount
$6,974,585
Net change by previously authorized Change Orders
$55,353
The Contract Amount prior to this Change Orders
$7,029,938
With this Change Order request the Contract cost is
increased
by
$862
New Contract Amount
$7,030,800
Change in Contract Time:
0 days
Contract Completion Date:
Recommended for Approval by:
CON
UCTION MANAGER / R&S
A^CHITI CT / Jeff Katz Architecture
Approved by:
CONTRACTOR/ Ma cotte and ,tiarne
OWNER/ City Ol tional City
Distribution:
lders
Ulf Azt
UCity Of National City (original w/all documentation)
MH Builders (copy w/all documentation)
Rudolph and Sletten, Inc. (copy w/ all documentation)
Jeff Katz Architecture (copy w/all documentation)
DATE
DATE
YORAra
re
°o
RUDOLPH AND SLETTEN
OENERAI. AND ENGINEERING CONTRACTORS
October 25, 2004
City of National City
1243 National City Blvd.
National City, CA 91950
Attn: Stephen Kirkpatrick
Reference: National City Fire Department Headquarters — Station #34
R&S Job No. 2848-0
Subject:Recommendation to referenced CORs submitted by M+H Builders
Steve:
This letter is to transmit our review comments on the following change order submitted by M—H Builders:
1. COR 034 09/9/04 — Modify framing at Doc Room 155 and modify ceiling framing to eliminate on step
down and adjust ceiling heights per RFI 117, 117.001, 117.002, 117.003 and ASI-23 X-55A and X-56 -
approved as submitted.
We recommend the attached change orders be approved for the submitted amount of 5 862.
Please notify me if any additional information is required to process this change order.
I may be reached by phone at 619-474-6944, or by email at roman mcnaughtonnn rscont.com.
Sincerely,
Rudolph and Sletten, Inc.
Roman McNaughton
Project Engineer
c: Jeff Katz — JKA/COR 10 file
RUDOLPH AND SLETTEN, INC.
10955 VISTA SORRENTO PARKWAY, SUITE 100
SAN DIEGO, CALIFORNIA 92130
TEL. 858.259.6262 FAX. 858.259.8282
MARCOTTE
HEARNE
BUILDERS, INC.
Thursday, September 09, 2004
Mr. Howard Mills
Rudolph & Sletten
10955 Vista Sorrento Pkwy Ste. 100
San Diego, CA 92130
RE: National City Fire Station 34
Marcotte + Hearne Job No. 04-003
Via Fax: 8582598282
Subj: Marcotte + Hearne Builders Inc. Change Order Request No. 034,
Dear Sir:
The Contract adjustment required as a result of: Relocated GLB at Room 155 on Rake
Request For Information: 117 - Ceiling Height at Room 155
Added work to relocated GLB on rake and all attachments associated with this and all related
beams at this area.
Change Order Request No. 034 is $862.00
The incorporation of this revision into the contractual scope of work will requ
included in our current schedule. The job schedule will be adjusted accordingly to show the effect
of this revision on the final project completion date. The terms (cost and schedule impact) of this
change order request are subject to review and a re -quote if not accepted within 14 days of its
issuance.
We HAVE NOT preceded with this revised work. Please issue an authorization and/or
change order.
If you have any questions or comments pertaining to this matter, please contact the undersigned.
Respectfully, Quotation Accepted By:
ders Representing:
Effect Engineer Date:
CC: Stephen Kirkpatrick, Nation City, 619-336-4397
Jeff Katz Architecture, 619-474-6926
M+HB office — 858-793-4101
Project File
11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121
Tel. 858-793-4101 Fax: 858-793-4102
JOB NO. 04-003
COR NO. 034
MARCOTTE & HEARNE BUILDERS
CHANGE ORDER REQUEST BREAKDOWN
National City Fire Station #34
Added work to relocated GLB on rake and all attachments associated with this Change
SUBCONTRACT NO.
DESCRIPTION
SUBCONTRACTOR
QUOTE
Relocate GLB on Rake
Rock Coast
$813
SUBTOTAL
5% OH + P
1% Bond Premium
$813
$41
S854
$9
Change Order Total $862
09-Sea-04 04:58am From -Rocky Coast Framers, Inc.
Rocky Coast Framers, inc.
1863 Commercial St., Escondido, CA 92029
(760)489-7770 Fax (760)489-7771
Licensed General Contractor # B-74506
•
OyN. ER'S Marcotte & Hearne Builders, Inc.
STREET 11696 Sorrento Valley Rd, #200
CITY San Diego
cc‘
No. 07
7-235 P.002/003 F-844
CHANGE ORDER
FOR
CONTRACT CHANGES
Pc0# OL/o
PHONEDATE
858-793-4101 9/09/04
JOB NAME
National Ci. Fire Station #34
STREET
EXISTING CONTRACT NO. JOB !t DATE OF EXISTING CONTRACT CITY
04-003 200407 3/26/04
El ADDED
DESCRIPTION OF ® CONTRACT ITEMS RE : Added Work
DELETED
333 E. 16th Street
National City
Added work to relocate GLB on rake and all attachments associated with this and all related horns at this area.
Labor 12 man hours @ 549.61 = 5595.32
Materials = $24.52
Equipment (Gradall) = 580.00
Bond @ 1%= 56.99
Subtotal = $706.83
Profit @ 15% = 5106.02
Total = $812.85
TOTAL PRICE OF CHANGE : 5813.00 _
YOU ARE HEREBY AUTHORIZED TO MAKE THE FOLLOWING CHANGE IN YOUR WORK ON THE ABOVE
CAPTIONED PROJECT, IT BEING UNDERSTOOD THAT THIS CHANGE IS TO BE EXECUTED UNDER THE TERlv1`
OF AND CONDITIONS EMBODIED IN OUR CONTRACT.
ACCEPTED BY:
TITLE
FOR
DATE
El TIME EXTENSION 1Day
O'RJGLNAL CONTRACT S
THIS CHANGE ORDER S
REVISED CONTRACT AMOUNTS 5
Request for Information 117.002
MRCVS l at.
HEARRIE
BUILDERS, INC.
Detailed, RFIs without Routing Information Gr scced by IIFI Number
National City rate Station 34
333 16thh Street
National City, CA 91950
Project# 04-003 Ma,, Ln+Hearne Builder-, Inc.
Tel: 619-474-5922 F2~ 619-474-5926
RF1 K 117.002 Cate Created: 9/212004
Answer Company Answered By Author Company Authored By
Jeff Katz Architecture Jeff Katz Rocky Coast Framers Inc. Eric Sprankles
7290 Navajo Rd. Ste. 10a 1863 Commercial Street
San Diego, CA 92119 Escondido, CA 92029
Co -Respondent Author RFI Number
Subyect
GLB at Room 155
Cost impact
Not Sure
Discipline
Architectural
Category
Amount Sched impact Days Dwg Impact
Not Sure Not Sure
Cost Impact Comments Sctted Impact Comments Dwg Impact Comments
Cc: Company Name Conti.--1- dame Copley Notes
Question _ate Required: St2/2.004
Ref: Attached A51-23
1. ASt-23 dated 912/ 4 sows notch at top to accept hardware. We are proposirg rot to noidi ttna 18" giulam at this
location but to use shims.
2e. Bottom of 15• beam 's at 9'-8 1/4". We propose tc attached joist at mechanical well to 15' beam using joist
hangers.
3. Manufacture wi8 not warrantee this beam as shown beta' cut at top ' "ds 4'. Letter fr_^ manufacture Is
forthcoming.
4. RFI 117 asked if the 18` E1ep at the mechanical well shown on the structural d.awings is requ re . Our understanding
is that the 18" step is not required.
Please conmm that our interpretation s correct Please ooniirrn t .... we are to proceed with these c:.ais�es.
Suggest on
Answer
Response
Date Artswcn, j:
1. Correct. Use shims in lieu of notching.
2a. We take no exception to use of joist hangers to attach joist to GLB.
3. We take no exception to cutting top of GLB by 4" as shown. Note: Beam forces at this
end are well within allowable limits.
4. We take no exception to eliminating the 18" step.
By: Donald R. Orie, S.E. 3838 Dated: 09-03-04
Sep 02 04 05:1Sp Jason Sanders
a
h
Jeff Katz
Architecture
ri
h
is
61S-474-S92S
1- 8.
tL
ca
.41
p. 2
L
c-
s
C
z J
.—j
7290 Narajo RC, Suite 108 - San Diego, CA 92119
O(Fcn (619) 696-9177 - Facsimile (619) 696?176
www.jeAkatterd+decturemm
Natioinai City
Fire Deportment Headquarters
Station 34
333 E. 16th Street
National City. CA 91950
Suo$emtntcI k:structions
PROJECT NO.: 0'.1"01
GATE. 09/02/O4.
TITLE, GLULAM
SCALE:
AS 1-23
) SeEEI F.O.
X-55A
HP Officejet 6100 Series 6110
Personal Printer/Fax/Copier/Scanner
Log for
Jason Sanders
619-474-6926
Sep 28 2004 1:28pm
Last Transaction
Date Time Type Identification Duration Pages Result
Sep 28 1:27pm Fax Sent 6989178 1:03 5 OK
PROPOSAL REQUEST
Distribution:
x Steve Kirkpatrick
x Howard Mills
x Wayne Powderly
x Jason Sanders
x David Porter
PROJ ECT:
National City Fire Department Headquarters, Station 34
National City, California
OWNER:
City of National City
1243 National City Boulevard
National City, CA 91950
TO:
Marcotte + Hearne Builders, Inc.
11696 Sorrento Valley Road, Suite 200
San Diego, Ca. 92121
PROPOSAL REQUEST NO,
00B
DATE: August 28, 2004
ARCHITECT'S PROJECT NO:
011101
CONTRACT FOR:
General Construction
CONTRACT DATED:
February 17, 2004
Please submit an itemized quotation for changes in the Contract Sum and/or Time incidental to proposed
modifications to the Contract Documents described herein. Proposal shall be submitted in accordance with
Article 26 of the General Conditions. Cost proposal shall be submitted Architect and Construction Manager
no later than September 10, 2004.
THIS IS NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK
DESCRIBED HEREIN.
Description: Modify framing at DOC Room 155 per a Cached drawing. Modify ceiling framing to
eliminate on step down and adjust ceiling heights as indicated..
Reference Documents: AS1-23, Drawings X-55 and X-56, dated 08/27/04
ARCHITECT:
Jeff Katz Architecture
7290 Navajo Road, Suite 106
San Diego, CA. 92119
CONSTRUCTION MANAGER:
Rudolph & Sletten
10955 Vista Sorrento Parkway, Suite 100
San Diego, CA 92130
ribl;:'Zornf;
RE:g.):uest for ;i-IT,)rroion I I 7.001
RHs •.:.•,r;thov:t ;:),„;
Ha? sw,: :34 kb:e1".oi.:,,:•: 4' HeWP.e
SZ:?:1Sth5•73treet.
CP iona:i CAN,
,,,,, . ... ..... ... .. .............. ....... ..
117,:101
Ant...m,ver e.:3eraparri
"1.29;3 R.ci. Ste.
San
Co-Basponderst:
SW*ot
Notch (-3i..3e .8e8m
Cio'; -i:•i;e:raperty Narc:e.
ieff Katz
Attwunt Sche-d
Certi:abl„
Biabii;eiibta•
.........
..64.•itiw,e- Com psey
Rocky Coaat
B-13 Commer.,,,i,A Street
CA )2tY2'
;At ........... Number
rte:teCnIztvb
At:it.berod
Bp'etexi&e
03.testiot Date Reo,iaght3,:b
c.in--;;Mng AS-:2;?,:tatr.r.lBj25 anbi res.eietisd drawing de,t.e41 812.6. •I't-;-efe t;') b:a. Z3ei,::t
01 the which k:voi.ki: epprm< f.3 al the arterior appreximaritaiy
pitch porti<. <br:r.f. 41- iOlig tile poiw... This. 8iSi) ;KFz.:::;h wnere:
steps do. It 3 .. ei5e nA'A., to be ef.i.t(,-;hed or.: the botic:.:';:t3 dm to p,.)e:?•ihte deierni:nation,
tg..ger.tton .
Artswex
See revision drawing ASI-23, X-55 (revised) and X-56 for addiitonal information)
Net?ijc"..tt
it is 'acceptable to notch the Gluarn beam at the end es indicated in ASi-23. Note. the i:',tnOiN
and she.ar forces at thE,I. and of the beam are well beov,( acce0able limits.
By: Donaid S.E. 36,7:2 /•
Dated: (.3B-7-04
7290 Navajo Rd, Suite 106 - San Diego, CA 92119
Office (619) 698-9177 - Facsimile (619) 698-9178
www.jeffkatzarchitecture.com
Notional City
Fire Department Headquarters
Station 34
333 E. 16th Street
National City, CA 91950
PROJECT NO
DATE! 08/27/04
Achitect Supplemental ins:-uc:oes
0.1101 ASI-23
TITLE: GL✓LAM DETAIL
SCALE
1/4" = 1'-0°
ShEEI NO
X-55
RECESSED PROJECTOR
SCREEN. SEE
4,2
1 @i
Jeff Katz
Architecture
u
9-0
5 -m°
G
E 0 z
154
a -6'
VARIES
VARIES
VARIE
0 0 C 11'-0' 0
G-
150
14'-10°
SS
ll
))
151 1
OZ
0
zm,
0
7290 Navajo Rd, Suite 106 - San Diego, CA 92119
Office (619) 698-9177 - Facsimile (619) 698-9178
www.jeffkaUarchitecture.com
National City
Fire Department Hecdqucrters
Station 34
333 E. 16th Street
National City, CA 91950
Architect Supplemental Instrcc::one
PROJECT NO.: lllml
DATE: 00/21/04
TITLE: REFLECTED
CE1LING, PLAN
AS I -23
SCALE: 1/!'
& 4EET NO.
X-56
Mogncar.
i',,?OuRmE
J.1.?.1.iIa
I
6.LI3 Raarci 15:5
for information 117.003
Da1•:*:
Authomd !;.$•
ilettetbriiir
a.:a
pk,..qme
A iieh9th of 2,-2' for the, the oriole& 26to add a GIB CCO as shotivri. -
Per the original RR sketch X-55A we are fequestimi. ts.li.f.:3xi1/4, (1) on each side of the
deep GLB.
Dated: