HomeMy WebLinkAbout2004 CON Marcotte & Hearnes - Change Order #11 Fire Station #34CHANGE ORDER IGI Ler: 11 TO (Contractor): Marcotte + Hearne Builders C/O Initiation Date: 11696 Sorrento Valley Rd. Ste 200 Project: November 2, 2004 National City FireStation34 San Diego, CA 92121 Contract No.: 1029 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. Relocation of the existing UV Reactor/Pump Assembly as shown on the ASI-29 drawing X-68 and added sump pump with pit in the UV Vault per RFI 105 [M+H COR 46] $56,465 2. Extended General Conditions are contingent on the balance of the work to be substantially complete by Feb. 22, 2005 per the submitted Schedule dated Oct. 25, 2004 .$12,214 Total amount of this change is not to exceed $68,679 REASON FOR CHANGE: 1. The relocation of the existing UV Reactor/Pump Assemble was a change that was requested by the City because of the UV Reactor aluminum lids conflicted with the placement of the Fire engine's outriggers. COST RECONCILIATION: Costs were reviewed by the architect and CM and negotiated to the satisfaction of the City. Construction Contract Accounting Summary: The original Contract Amount $6,974,585 Net change by previously authorized Change Orders $56,215 The Contract Amount prior to this Change Orders $7,030,800 With this Change Order request the Contract cost is increased by $68,679 New Contract Amount $7,099,479 Change in Contract Time: 7 days Contract Completion Date: March 1, 2005 Recornrned for Approval by: CO ION MANAGER / R&S PROJECT ARCHITE / Jeff Katz rchitecture Approved by: CONTRACTOR/ rcotte and Hearne Bu OWNER/ City Of National City Y- o y DATE DATE DATE Distribution: City Of National City (original w/all documentation) MH Builders (copy w/ all documentation) Rudolph and Sletten, Inc. (copy w/all documentation) Jeff Katz Architecture (copy w/all documentation) DATE OOgp O RA? yfi � RUDOLPH ADSLETTEN GENERAL AND E.NOINEtRiNG CONTRACTORS October 29, 2004 Via fax 858.793.4102, US Mail & e- mail M+H Builders, Inc. 11696 Sorrento Valley Road, Suite 200 San Diego, CA 92121 Attn: Wayne Powderly Reference: Subject: Dear Wayne: National City Fire Department Headquarters — Station #34 R&S Job No. 2848-0 Proposal Request No.10/M+H C.O.R. No. 011 — Relocation of UV Reactor/Pump Assembly — Authorization to Proceed We are in receipt of M+H change order request for the work associated with the relocation of the existing UV Reactor/Pump Assembly. The City has reviewed the cost associated with this change and has agreed to Authorize M+H to proceed with this work immediately. The time extension request for the seven days and extended General Condition costs are contingent upon M+H completing the balance of the Project by February 22, 2005 as noted on your Baseline Schedule. I may be reached by phone at 858-864-2744, fax at 858-259-8282, or by email at lose garcia(rsconst.com with any comments or questions you may have. Sincerely, Rudolph and Sletten, Inc. Jose L. Garcia Sr. Project Manager C: Steve Kirkpatrick — National City/Jeff Katz — JKA/Bill Hearne—M+H//M+H job File RUDOLPH AND SLETTRN, INC. 10955 VISTA SORRENTO PARKWAY, SUITE 100 SAN DIEGO, CALIFORNIA 92130 TEL. 858.259.6262 FAX. 858.259.8282 pot 27 04 03:30p Jason Sanders Date 10/2'7104 Number of pages including cover sheet '10 Attn: ,Jose Garcia Come: R&S National City Fire Station Re: COR #46 Phone Fax Phone 858-259-8282 MARCOTTE + HI ARNiE9 BUILDERS 1169Ei Sorn:nta Valley Rd. SUITE 20C1 SAN I)IEG O, CA. $12121 From: .Jason Sanders Phone 131II-4744922 Fax Phone 1619-474.-6926 REMARKS: Urgent For approval Reply ASAP Please comment COR #46 I am resending COR 46. Clnly'7 pages went through during the last Fax session. Thanks, Jason Cc: Stephen Kirkpatrick Jeff Katz MHB Office 10/27/2004 iVEli 15:35 [TX/RX NO 5903] Qt]001 Oct 27 04 03:30p Jason Sanders 619-474-6926 p•2 MARCOTTE HEARNE BUILDERS, INC. Wednesday, October 27, 2004 Mr. Jose Garcia Rudolph & Sietten 10955 Vista Sorrento Pkwy Ste. 100 San Diego, CA 92130 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04-003 Via Fax: 8582598282 Subj: Marcotte + Hearne Builders Inc. Change Order Request No. 046, Dear Sir. The Contract adjustment required as a result of: Relocate Existing UV Reactor/Pump Assembly Proposal Request #10 Relocate the existing UV Reactor/Pump Assembly as shown on the attached ASI-29. Add sump pump and sump pump pit per COR# 028. This change will extend the contract completion date by 7 days based upon an approval date of 11/01/04. Add $1,698 per workday for extended conditions if notice to proceed is issued after 11/01/04. Change Order Request No. 046 is $68,679 The incorporation of this revision into the contractual scope of work will require 7 working day not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE NOT preceded with this revised work. Please issue an authorization and/or change order. If you have any questions or comments pertaining to this matter, please contact the undersigned. Respectfully n'1i�rs Engineer Quotation Accepted By: Representing: Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 JeffKatz Architecture, 619-474-6926 M+HB office -- 858-793-4101 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel. 858-793-4101 Fax: 858-793-4102 10/27/2004 WED 15:35 ITX/RX NO 5903] I1002 MARcons HEARNE BUILDERS, INC. Potential Change Orders Detailed (with Cost Info), Grouped by Each Number National City Fire Station 34 333 16th Street National Cdy, CA 91950 Project # 04.003 Marcotte + Hearne Builders, Inc. Tel: 619-474-6922 Fax: 619-474-8926 PCO #: 055.001 10/20/2004 Relocation of UV Reactor/Pump Assembly Category Reason Reference COR Number PCCO Number Change Order Proposal Request 10 dated 10/19/04 046 Notes Task Name Revenue Code Relocate the existing UV Reactor/Pump Assembly as shown on the attached ASI-29. Add sump pump and sump pump pit per COR# 028. This change will extend the contract completion date by 7 days. Summary: Pending Estimate Proposed Approved Applied Requested Days: 7 Budget: 36,591 00,601 0 66Seri En Aenrovpri nays- 0 Cost 68,891 68,891 0 68.891 0 1 N itemized omens: -a ... do General Description Quoie Due �ruofs rie d Artvuaun crsurnaied-rvpvsed Approved iappiied Ni 001-PAUHAN- - 10/23/2004 10/21/2004 Budget: 41,833 41,833 0 41,833 co RRIoc to t e ex!stIng a N reactor!pump oseembiy as shown on the .14.ri1.0.1 Cunt_ 41 Rag 41 833 0 41 833 11J ASI-29 002 - M+HB - 10/8/2004 10/7/2004 Budget: 656 656 0 656 Remove 80 yards of spoils from jobsite. Trucking Time 8 hrs © $82/hr. Cost; 656 656 0 656 003 - SADELE - Relocate electrical for UV Vault. 10/2312004 10/22/2004 Budget: 6,410 6,410 0 6,410 Cost: 6,410 6,410 0 6,410 Potential Change Orders Detailed (with Cost Info), Grouped by Each Number 004-M+HB- 10/27/2004 10/27/2004 Budget 11,878 11,878 0 11,878 Extended General Conditions 7 days Q $1,696.80 per day. Cost 11,878 11,878 0 11,878 005-ADKENG- Cost to re -stake UV Tank 10/27/2004 Budget: 700 700 0 700 Cost: 700 700 0 700 006 - PAUHAN - 10/27/2004 10/27/2004 Budget: 2,582 2,582 0 2,582 Add 1" sump In UV Vault includes sump pump pit as outlined In COR# 028 Cost: 2,582 2,582 0 2,582 007 - SADELE - 10/27/2004 10/27/2004 Budget: 702 702 0 702 Electrical Conduit for Sump Pump as outlined In COR# 028 Cost: 702 702 0 702 008 - CATPRO - 10/27/2004 Budget: 200 200 0 200 Relocation of UV tank schedule analysis - 2 hours © $100 per hour Cost: 200 200 0 200 Level 001 • - Budget: 3,248 3,248 0 3,248 5.00% Overhead & Profit Cost: 3,248 3,248 0 3,248 Level 002 - - Budget 682 682 0 682 1.00% Bond Premium Cost: 682 682 0 682 10/27/2004 WED 15:35 ETX/RX NO 5903] 0 rt N v 0 0 cil v N N 0 3 co Cu 3 0- m 1 un 9269- Li'-6T9 Oct 27 04 03:31p Jason Sanders S1S-474-69.29 PROPOSAL REQUEST Distribution: x Steve Kirkpatrick x Jose Garcia x Wayne Powderly x Jason Sanders x David Porter PROJECT: National City Fire Department Headquarters, Station 34 National City, California OWNER: City of National City 1243 National City Boulevard National City, CA 91950 TO: Marcotte + Hearne Builders, Inc. 11696 Sorrento Valley Road, Suite 200 San Diego, Ca. 92121 pE'.(4 - £S / PROPOSAL REQUEST NO. 010 DATE: October 19, 2004 ARCHITECT'S PRCJECT NO: 0'1101 CONTRACT FOR: General Construction CONTRACT DATED: February 17, 2004 Please submit an itemized quotation for changes in the.Contract Sum and/or Time incidental to proposed modifications to the Contract Documents described herein. Proposal sha:0 be :;ubmitted in accordance with Article 26 of the General Conditions. Cost proposal shall be submitted Architect aid Construction Manager no later than October 26, 2004. THIS IS -NEITHER A CHANGE ORDER NOR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED HEREIN. 1. Description: Provide a cost proposal to relocate the existing UV vault as indicated. Reference Documents: ASI-29, Drawings X-68, dated 10/19/04 ARCHITECT: Jeff Katz Architecture 7290 Navajo Road, Suite 106 San Diego, CA. 92119 CONSTRUCTION MANAGER: Rudolph 8; Sletten 10955 Vista Sorrento Parkway, Suite 100 San Diego, CA 921:30 10/27/2004 WED 15:35 [TX/RX NO 5903] IJ009 Oct 27 04 03:31p Jason Sanders 619-474-6926 p. 10 l8"x CB — 21.48 IE -SOLID COVER, ANAL 3" PVC FROM, UV / r :FEACT1 'TO , (,�,. AASII�- �' .01 61 SD 'rVA COORDINATE LIST UV REACTOR SEA= x24" CB i •R / -7' 'is.4,' 02211 14100:. 24"x24" CB 009 .0 > :: :22 6 IFf .s„s.. �. -t- .. _ -�.... a .♦AM • 1.00c - ® 0.79% SO — CONNECT NEW 6" SEWER PE TO EXISTING 6" SEWER PIF 40 AC tr I 2024. 4981.04 4787.89 CB 2051 4965.97 4785.70 COR. PUMP STATION ' 2052 4966.94 4799.59 COR. PUMP STATION 2059 4964.11 4802.80 W/ TEE J 7290 Navajo Rd. Suite 106 -San Diego, CA 92119 Office (619) 698-9177 - Facsimile (619) 698-9178 www. jeftka tza rchltecture. com National City Fire Department Headquarters Station 34 333 E. 16th Street National City, CA 91950 Archtect Supplementai Instructions PROJECT NO.: 011101 DATE: 10/19/04 11TIE VAULT RELOCATION ASI-29 SHEET N0. X-68 SCALE: 1 "=20'-0" 10/27/2004 WED 15:35 [TX/RX NO 5903] 010 Oct 27 04 03:30p Jason Sanders 6;13-4 7A-S912S p • S Pco- ass. / National City Fire Station #34 Marcotte + Hearne Builders - Direct General Conditions Costs General Conditions _ Description Cost Project Manager ($75/hr x 16 hrs/week) $ 1,200 Project Engineer ($50/hr x 40 hrs/week) $ 2,000 Field Supervision ($65/hr x 40 hrs) $ 2,600 Scheduling Consultant $ 400 Project Assnt/Accountant ($40/hr x 12 hrs/week) $ 480 Automobile allowance w/ Fuel & Maintenance $ 195 Cell Phones $ 110 Jobsite Phones + DSL $ 85 Jobsite Trailers $ 130 Jobsite Copy Machine $ 75 Jobsite Fax Machine $ 10 Jobsite Office Supplies $ 65 Misc. Equipment, Small Tools & Safety $ 220 Temp Power $ 350 Jobsite Fencing $ 434 Office Supplier & Postal Service $ 10 Chemical Toilets $ 120 Weekly. Total $ GC Costs / Day 8,484 $1,697 10/27/2004 WED 15:35 [TX/RX NO 5903] 2005 Oct 27 04 03:30p Jason Sanders 619-474-6926 p.6 jilrmm SMILER ELECTRIC. INC. 19:f `.a P4Clsacbsifip D=. lace- lr S7 t:wjori. t." National City Fire Department Headquarters, Station 34 SADLER JOB # 266 DESCRIPTION OF CHANGE IN WORK: 30 tt Relocate Electrical for UV Vault ITEM DESCRIPTION PROPOSAL REQUEST NO. RFQ # 056.1 10/22/2004 MATL MATL LABOR LABOR QTY. UNIT $ EXTEN UNIT HRS HRS EXT demo concrete encasement/expose conduit 3 100.00 $300.00 6.00 18.00 concrete 2000# min 2 90.00 $180.00 2.00 4.00 shortload charge 1 300.00 $300.00 2 1/2 PVC sch 40 conduit 20 0.85 $17.00 0.10 2.00 chair spacer for 2 1/2 PVC 4 1.00 $4.00 0.50 2.00 2 1/2 PVC adapter 1 3.50 $3.50 0.25 0.25 2 1/2 rigid conduit 10 10.50 $105.00 0.30 3.00 2 1/2 rigid 90 elbow 1 27,00 $27.00 1.00 1.00 2 1/2 bond bushing 1 22.00 $22.00 0,75 0.76 2 1/2 iocknut 3 5.00 $15.00 0.25 0.75 2 1/2 plastic bushing 1 3.00 $3.00 0.20 0.20 1 6/8 strut, Vft 10 1.60 $16.00 0,05 0.50 24"h x 24"w x 8"deep pull box screw cover N3R 1 320.00 $320.00 4.00 4.00 1 PVC sch 40 conduit 20 0.25 $5.00 0.07 1.40 #10 THWN wire 20 0.085 $1.70 0.010 0.20 #8 THWN wire 4D 0.195 $7.80 0.015 0.60 #4 THWN wire 30 0.495 $14.85 0.015 0.45 #2 THWN wire 3D 0.745 $22.35 0.020 0.60 250 MCM THWN wire 90 2.580 $232.20 0.040 3.60 3rd Tier Subcontractors) backhoe, excavate 4 95.00 $380.00 1.00 backhoe, compact 6 95.00 $670.00 1.00 core concrete 3.6" dia x 8" deep 1 80.00 $80.00 1.00 Totals 4.00 6.00 1.00 Subtotals all items Sales Tex 7.75% Material Labor hours $1.596.40 54.30 $123.72 Labor Rate: Including Insurance, $52.00 54.30 $2,823.60 Taxes & Fringes Sadler Electric Work Subtotal $4.543.72 3rd Tier Subcontractor Quote(s) $1 030.00 Proposal Subtotal before Markups $5,573.72 Markup 15.00% $836.06 Proposal Total $6,410.00 10/27/2004 WED 15:35 ITX/RX NO 5903] Z 006 Oct 27 04 03:30p Jason Sanders OCT-21-2004 13:26 FROM-PAUL HANSEN EGUIPIENT 13!.`.-.6.74-fa92a +6194470681 T-'486 P.002/003 F-196 • SUBCONTRACTOR POTENTIAL CHANGE ORDER REQUEST RECUESTED BY' Maimae *Hearne &Adana 11096 SOnatec valley Re. Suite 200 San Diego, CA 92121 Mtn:Wayne P0wde1y PROJECT NAME National Clb FIre Sorkin 11034 f 0 aw11e;. 10/20/2004 55.00 CHANGE INWORKNOTIIFU ATiOn-MuiweIR: ASI-29 CONTRAcr NUMBER, PHI Job 4 1337 -04 Reweave UV Tank and pi olrt3 LABOR: (A each takeafl Meet Rneed4d REF NUM LABOR CLASSIFICATION HOURS s1.e 91.5 a2.e RIFF. HDURL'F RATE LAIIOFI: COST $13,0I10.1R1- $3.240!1) S4.1130.1)0 $13,0:32.i)0 1 Laborer Foreman '120 5 75.00 2 Laborer General 120 $ 52.00 3 Operator 1 Yard Backhoe 64 $ 65.00 4 Laborer General '116 $ 62.00 5 Driver 10Yard Dump 12 $ 52.00 $624.1)0 6 $ ;E0 )o ;60.I)0 7 $ - TERIAL5 Mach lake-etr alma 'OTAL I.AI8O' REF MATERIAL DESCRIPTION OTY UNTIE UNIT COM' MATERIAL i' , 1 Concrete 3250 PSI 4 Yard S 110:Ni $440.00 2 Pipe 4" C-900 Class 150 PVC 30 LP $ 4.25 $127. 0 3 Pipe 8" C-900 Class 150 PVC 40 LF $ 8.84 $3 .60 4 Coupling 4" MJ 1 Ea. S 78.39 Ire 6 Tee 8" MJ 1 Ea. $ 116.00 5116.1)0 6 Bend 4" 90° MJ 1 Ea. $ 66.411 566.48 7 Bend 8" 90" MJ 4 Ea. $ 96.0(1 $ 00 8 Coupling 4" Repair 2 Ea. $ 37.23 S I4.a16 9 Coup 8" Repair 2 Ea. $ 46.88 $93.7 10 Rock 3/4 Crushed 20 Yards $ 18.47 5 16.s1ST S369.40 5333.4)0 11 Sand 30 Far 20 Yards 12 Cap 4" Blind 1 Ea. 5 42.011 542.00 13 Gap 8" Blind 1 E8. $ 54.55 $54.55 Total from Sheet 1$2 OTHER COSTS: (Aaach itemized inrormaiien) REF 1 DESCRIPTION Backhoe 1 Yard TOTAL MATERIAL: (7.75%or.2) :iALtES TAX: TOTAL LABOR, MATERIAL, AND SALES TAX MARK-UP ON LABOR AND MATERIAL QTY 64 UNITS Hrs 2 3 4 5 s 7 Compressor 185 CFM Wacker 185 BST Crane 100 ton Compaction Wheel for Backhoe Truck 10 yard SUBCONTRACTS: (Attach Su000n►rar3ors pprraap�eaaaai) sUBCONTR*CYOR NAME r PEScrtienON REF 1 Laborer From Jensen Precast 4 4 9 3 12 Day Day Hrs. Days Hrs. $ 42.74 S T,.736.36 S 145.015- $ $ 98-01) S $ 185.00 $ 1.4 5 150.00 $ 450.00 $ 30.00 $ $ - $ TOTAL )TPIER CO MIRK -UP: (shah of t-hhees 4, 5. en SUErrOTAL: $26.0561una1 $3,082 5239 1 51re5ONTRACT COST $ 640.0a" $ 182.00 5 63.00 S 120.01) 2 3 4 Core New Location Discharge Piping to Stolen Drain Dump Fees SUBCONTRACT COSTS: 1 $1,005.00 tine9 MARK UIP: $150.75 Une so and 10)TOTAL SUBCONTRACT COSTS: 529,377 $4,407 (Total' of Lines 9 SUBMITTED el' Lae Una3 tia4 uses Line e lire 7 $1,1$61Une 11 (Total at Lines a antiand 11) arrh,W U TOTAL:J meesserwwwwwww 541,$331 One 12 ■ram TOTAL CHANGE REQUESTED BYSUBCONTRACTOR: Theodore A. Brown .6- -SATE: 10/21/201)4 $41t839 10/27/2004 WED 15:35 [TX/RX NO 5903] Q5007 Oct 27 04 03:31p Jason Sanders OCT-21-2004 13:28 FROM-PAUL HANSEN EQUIPMENT 619-474-6926 +61944T0881 T-463 P.003/003 F-196 P•8 Sheet2 FIRE —STATION SHEET _ #34 WORK #2 MATERIALS: !Vance take -off sheet) REF MATER, tAL DESCRIPTION CITY UNITS UNIT COST MATERIAL COST 14 Botts & Nuts 2 1/2" 316 SS 6 Ea. $ 12.00 $72.01 15 Bolts & Nuts 4" 316 SS 2 Ea. $ 16.00 $32.00 16 Bolts & Nuts 6" & 8" 316 SS 8 Ea. 5 25.00 $200.00 17 Gasket 2 1/2" Asbestos 6 Ea. $ 2.50 $15.00 18 Gasket 6" Asbestos 2 Ea. $ 2.87 $5.74 19 Gasket 8" Asbestos 8 Ea. $ 3.10 $24.80 20 Wood 2" X 6" Redwood 30 Ea. $ 6.84 $199.20 21 Ea $ - 30.00 22 Ea. $ - $0.00 23 Ea. $ - $0.00 24 Ea. $ - $0.00 25 Ea. $ - $0.00 26 Ea. 3 - $0.00 27 i8 29 30 31 32 33 34 35 36 37 38 Tow $548.75 Page 1 fc-c4' 55: 10/27/2004 19ED 15: 35 [TX/RX NO 5903] 0 008 State of California Business, Transportation and Housing Agency DEPARTMENT OF TRANSPORTATION Memorandum Flex your power! Be energy efficient! To: DEPUTY DISTRICT DIRECTORS, Construction Date: April 14, 2004 CONSTRUCTION MANAGERS RESIDENT ENGINEERS File: Equipment Rental CONSTRUCTION ENGINEERS S 1'RUCTURE REPRESENTATIVES From: ROBERT PIEPLOW Original signed by Chief Division of Construction Subject: Equipment Rental Rates Effective April 1, 2004 The labor surcharge rates published in the Labor Surcharge & Equipment Rental Rates (Cost of Equipment Ownership) book effective, April 1, 2004 through March 31, 2005 are being updated. A new interne book file effective, April 1, 2004 through March 31, 2005 will be posted to the following website: http://www.dot.ca.govihq/construc/equipmnt.html This action is being taken as a result of recent information from the Worker's Compensation Insurance Rating Bureau. The labor surcharge rates are retroactive to April 1, 2004. "Caltrans improves mobility across California" 966C 2340 $63.55 JD-444C 2515 $25.51 966D 2350 $66.43 JD-444D 2520 $25.57 966E 2360 $74.81 JD-444E 2521 $28.60 966F 2361 $76.72 JD-500C w/ backhoe 2592 $23.81 966G 2362 $87.16 JD-510 w/ backhoe 2620 $20.26 970F 2370 $90.73 JD-510B w/ backhoe 2625 $21.71 972G 2372G $96.39 JD-510C w/ backhoe 2630 $24.87 980B 2376 $67.50 JD-510D w/ backhoe 2630D $31.16 980C 2378 $96.90 JD-544B 2660 $29.19 980E 2381 $100.91 JD-544C 2670 $30.85 980G 2382 $111.15 JD-544D 2672 $29.73 988 87A6868 serial 2398 $80.36 JD-544E 2673 $33.23 988B 50W serial 2436 $142.63 JD-5440 2673B $38.70 992B 25K serial 2460 $151.92 JD-610B w/ backhoe 2690 $24.83 992C 2470 $280.32 JD-610C w/backhoe 2691 $27.16 IT 12 2472 $21.90 JD-624E 2700 $40.60 IT 12B 2472B $25.74 JD-6240 2700G $48.37 IT 14F 2473 $30.43 JD-624H 2700H $51.60 Tr 18 2474 $27.39 JD-644B 2710 $40.41 IT 18B 2475 $31.32 JD-644C 2715 $43.42 IT 28 2476 $32.49 JD-644D 2717 $43.30 1T 28B 2477 $36.46 JD-644E 2719 $49.16 IT 28F 2477G $42.99 JD-6440 2719B $59.48 IT 280 2478 $45.31 JD-644H 27191I $62.54 IT 38G 2480 $51.48 JD-710B w/ backhoe 2720 $30.97 IT 62G 2482 $70.65 JD-710C w/ backhoe 2721 $34.91 CLARK 1 CLRK 1 JD-710D w/ backhoe 2722 $41.00 JD-710D 4WD w/ backhoe.- 2722D $43.00 Model Code Rate JD-744H 2723 $87.25 35C 2484 $25.07 JD-844 2725 $77.22 45C -2486 $29.41 DRESSER 1 DRES 1 55C 2488 $35.07 Model Code Rate 75C 2491 $47.01 125B 2492 $56.99 510B 2310 $23.67 275B 2496 $100.34 510C 2310C $32.73 275C 2497 $119.51 515B 3517 $30.42 JOHN DEERE [ DEER 1 515C 3517C $39.25 Model Code Rate 520B 3519 $35.60 520C 3519C $47.08 .ID-210C 2485 $14.69 530 3520 $50.83 JD-210C w/ backhoe 2490 $15.62 530C 3520C $59.87 JD-210LE 2495 $19.83 540 3530 $76.45 JD-310Aw/backhoe 2504 $16.27 550 3540 $75.21 JD-310B w/ backhoe 2506 $16.98 FIAT-ALLIS [ F-A 1 JD-310C w/ backhoe 2507 $18.38 Model Code Rate JD-310D w/ backhoe 2507D $21.67 JD-310E w/ backhoe 2507E $21.98 545B 3042 $27.88 JD-310SE w/ backhoe 2507F $24.47 745C 3046 $54.13 JD-315SE w/ backhoe 2507H $25.09 FR 10 3049H $30.29 JD-410 w/ backhoe 2508 $18.22 FR 10B 30491 $34.26 JD-410B w/ backhoe 2509 $18.93 FR 20 3050 $65.30 .ID-410C w/ backhoe 2509F $21.59 FR 30 3051 $87.17 JD-410D w/ backhoe 2509G $26.99 FR 20B 3051B $75.47 JD-410E w/ backhoe 2509H $27.61 FR 35 3052 $120.52 JD-444 2510 $23.46 17 Rug 26 04 09:36a Jason Sanders 619-474-6926 P.1 Thursday, August 26, 2004 Mr. Howard Mills Rudolph & Steffen 10955 Vista Sorrento Pkwy Ste. 100 San Diego, CA 92130 MARCCTTE HEARNE BUILDERS, INC. Via Fax: 8582598282 RE: National City Fire Station 34 Marcotte + Hearne Job No. 04.003 Subj: Marcotte + Hearne Builders Inc. Change Order Request No. 028, Dear Sri The Contract adjustment required as a result of: Added Sump Pump in UV Vault Request For Information: 105 - tJV Reactor Vault Added sump pump in UV vault per RA 105 response. Change Order Request No. 028 is $3,483 The incorporation of this revision into the contractual scope of work will require 0 working day not included in our current schedule. The job schedule will be adjusted accordingly to show the effect of this revision on the final project completion date. The terms (cost and schedule impact) of this Change order request are subject to review and a re -quote if not accepted within 14 days of its issuance. We HAVE change order. If you have any Respectfully, NOT preceded with this revised work. Please issue an authorization and/or questions or comments pertaining to this matter, please contact the undersigned. Quotation Accepted By: Representing: Date: CC: Stephen Kirkpatrick, Nation City, 619-336-4397 Jeff Katz Architecture, 619-174-6926 M+HB office - 858-793-4101 Project File 11696 Sorrento Valley Rd., Ste. 200, San Diego, CA 92121 Tel_ 858-793-4101 Fax: 858•793-4102 Rug 26 04 09:37a Jason Sanders 619-474-6926 p.5 Nhumorm HEARNE BUILDERS, INC. L Detailed, RFIs without •Routing Information Grouped by RFI Number Request for Information 105 National City Fire Station 34 333161h Street National City. CA 91950 RFi #: 105 Answer Company Jeff Katz Architecture 7290 Navajo Rd. Ste. 106 San Diego, CA 92119 Co -Respondent Subject UV Reactor Vault Cost Impact Yes Cost Impact Comments Potential cost if additional piping is required, Answered By deli Katz Project# 04.003 Marcotte + Hearne Builders, Inc. Tel: 019.474-6922 Fax: 619-474-6926 Date Created: 8/2r2004 Author Company Authored By Marcotte + Hearne Builders. inc. David Porter 11696 Sorrento Valley Rd. Ste. 200 San Diego, CA 92121 Author RFf Number Discipline Ar chilectural Amount Sched Impact Yes Category Clarification Days Dwg Impact Not Sure Sehed Impact Comments Dwg Impact Comments Cm Company Name Contact Name Qeestloa REF: UV Reactor Vault on Sheet C-9 Submittal# 0001-02990-0 Copies Notes Date Required: 81912004 UV Reactor Vault shows 1-112" drain pipe and fitting. Currently the drain Is open to the vault. Plans do not show routing of this drain pipe to storm drain or sewer. Does this drain pipe need to be routed to storm drain? Please advise. • There is not sump pump or drain in UV Reactor Vault. If vault fits with water pumps and equipment could be submerged. Is a sump pump required? Please advise. Suggestion Answer The drain pipe does not need to be connected to the storm drain system. It shall be left open to 03/05/04 the vault_ If Electrical equipment is below the drain then the drain shall be extended to the floor. Please provide a cost proposal to provide an emergeny sump pump for nuisance water, Hydromatic model HOP {1 /6 HP) with diaphragm switch that toms on at 9" and off at 4". The 1" pump discharge fine shall be connected to the outgoing 3" PVC line with a brass swing check valve. Response By: Jeff Katz, AIA Date Answered: Aug 26 04 09:36a Jason Sanders 619-474-692G P.4 SMILES WE 110w 11161Yr INdig pa msas lsll.tp Dr. 19441 . Ai al erg$. National City Firs Department Headquarters. Station 34 PROPOSAL REQUEST NO. 33 8/25/2004 SADLER JOB # 256 DESCRIPTION OF CHANGE IN WORK: Added electrical outlet for Re-clalm Vault sump pump. Nolo: Sump pump, controllers end controls ere supplied and installed by others. MATL MAIL, LABOR LABOR ITEM DESCRIPTION QTY. UNIT $ EXTEN UNIT HRS HRS EXT 3F4" GRC conduit 10 2.00 $20.00 0,10 1.00 3/4" GRC termination 1 1.00 $1.00 0.50 0.50 3/4" ground bond bushing 1 4.00 $4.00 0.25 0.25 314" GRC 1 holo strap 2 0.75 $1.50 0.15 0.30 1 gang fs box APP FS-1 75 1 17,00 $17.00 0.75 0.75 1 gang fs box duplex cover APP FSK-1 DR-C 1 20.00 $20.00 0.20 0.20 20A 126V spec duplex receptacle '1 7.00 $7.00 0.50 0.50 #12 THWN CU wire 100 0.070 $7.00 0.010 1.00 1/4- x 2 114" wedge anchor 4 1.50 $6.00 0.10 0.40 114" nylon tie raps 10 0.50 $5.00 0.10 1.00 Foreman ccordinetian 3rd Tier Subcontractor(s) 4 1.00 4.00 none Tetes Material Labor hours Subtotals all items $88.50 9.00 Sales Tax 7.75% $6.88 Labor Rate: Including Insurance, $62.00 9.90 $514.80 Taxes & Fringes Sadler Electric Work Subtotal $610.16 3rd Tier Subcontractor Quote(s) $0.00 Proposal Subtotat before Markups $610.16 Markup 15.00% $91.52 Proposal Tetal $702.00 Aug 26 04 OS:36a Jason Sanders 619-474-6926 p.3 Theodore A. Brown AUG-10-2004 08:45 88081-PAUL HAM$EA E711IPANT +8124410681 T-325 P.003/003 F-789 SUBCONTRACTOR POTENTIAL CHANGE ORDER REQUEST DATE: 5/9/2004 REQUESTED 6TI Marcctte • Murat 28 widen. CHARGE IN WORK NOTIFICATION NUMBER RF0 33 11698 . 1.n.nto V alley Rd. Suite 200 CCNTRAOI MUNGER. San Didto. CA 92121 M b .lob r 937.04 eorrwayne Pawzkvy PROJECT NAME Natonae Cey Fin %Owl 034 Y Sump in UV YsuR • REF NUM LABOR CLASSWICA ION HOURS n1.0 OA n2.0 OIPF. HOURLY RATE LABOR 008T 1 Laborer Foreman 8 $ 75.00 3000.00 ' 2 Laborer General 12 $ 56.00 $672.00 3 Laborer Finisher 2 1 56-00 S112.00' 4 ; - $0.00 5 $ - 80.00 6 $ - 80.00 s e - So:00 MATERIAL$: Ft6F (mmb ro 4-uff mass MATERIAL. 1 Valve, erase Cheek 1' 2 Pump ModelHUP submersibie 3 Tee 3"x3"Ductile Iron Fl 4 "Iari 3" x 1" Compton W/Bush 5 N' le, 1" Brass 6 7 a Adpb. Pipe Bond 9 Cement 1"CxT 1- Type "K" Copper 1" Type `K" Comer 3250 P$1 10 11 Vac 12 Boll "13 Gasket Form Material, a Reta 316 SS 150 Rax� EP0>V'' OTHER COSTS: mad, itemizedinhxmawn/ REF 1 2 3 4 5 8 7 oteeMPTTON Owe Dot Ana saw hole in Boor Frane Cesar 12"x12" 12" x 12" vial" holes SUBCONTRACTS: Pesch Subcormacers suue0NTRACTORAWE 10E REP STrr 1 1 1 2 20 3 Ea. Ea. Ea. Fa. Ea Ea. LF Ea LS twit COST MATEfbAL COST 27.31 $27.31 5 140.00 $149.00 56.85 $58.95 • 8.82"' 318.82 S 3.85 $3.85 S 3.54 5 2.93 5 3.34 S 35.00 $7.08 $58.60 50.00 $35.00 3 3 LS Ea £a 38.00 S $ 7.40 $38.00 50.00 922.20 S 1.57 $4.71 TOTAL. AAATE1UMJ 17.75% of Lire 2) SALES TAX: TOTAL LABOR, MATERIAL, AND SALES TAX MARK-UP ON LABOR AND MATERIAL Orr 4 i UNITS Holes Ea Ea. $ tea COST 46.00 OTHER COST 180.00 • 140.00 $ 140.00 87.53 L.8 137,53 S S S S S ; S - ; s1,334 L1ne $421 Lira 2 ;33 Line 3 ;1.1138 Litt 4 Lw19: 5 8276 TOTAL. OTHER COST$ MARK-UP: me, of Linea 4. 5. $.7) SUBTOTAL: ST"5MMT TACT COW ' 1 $ 2 s $ s $408 Line 0 1.13Ure7 $2.582ILew; 6 SUBCONTRACT COSTS: MARK-UP: frame of Lines 9 ar d lay TOTAL SUBCONTRACT COSTS: (roof of tins a 1n4 "1) _.. _----.. GRAND TOTAL: $0.00 Lim 9 tine 10 $0.00 SUBMITTED BY: 4 J 707AL CHANflKi.E REQUEST D BY SUBCONTRACTOR: $?T5$2 ____. + .--- -3447E 8190-004 Aug 26 04 09:36a Jason Sanders 619-474-6926 p•2 JOB NO. 04-003 COR NO. 026 MARCOTTE & HEARNE BUILDERS CHANGE ORDER REQUEST BREAKDOWN National City Fire Station *34 Added Sump Pump in UV Vault SUBCONTRACT NO DESCRIPTION 1" Sump in UV Vault Electrical. Conduit for Sump Pump SUBCONTRACTOR Paul Hanson Sadler QUOTE $2,562 $702 SUBTOTAL 5% OH + P 1% Bond Premium I Change Order Total $3,4B3 $3,284 $164 $3.443 $34 10/27/2004 15:49 95168E0599 ADKAN ENG PAGE 01 / 01 adkan CIVIL ENGINEERING SURVEYING PLANNING ENGINEERS 6820 AIRPORT DRIVE, RIVERSIDE CA 92504 Tel: (951) 688-0241 Fax: (951) 688.0599 adkanl ENGINEERS PROPOSES TO FURNISH ALL MATERIALS AND PERFORM ALL LABOR NECESSARY TO COMPLETE THE FOLLOWING: PROPOSED PROJECT National City Fire Station #34 FOR. Marcotte & Hearne Builders Proposal Request # 10 Attn: Jason Fax: (619) 474-6926 Provide Staking for Vault Relocation per Drawing K-68. $ 600.00 Includes Travel and Two (2) Hours Onsite, Authorization to proceed: Printed Name: Date: This firm requires. that we be provided with a digital file of all projects, as this -bid is based on receiving this file prior to starting work. Misfile will be provided at no additional cost to adkein E7YGA tEf?S • Established in 2983, completion of over 5,000 survey projects. ➢ Ability to provide a survey with less than 24 hours notice. • Emergency crews available on a 1-hour notice (most cases). Currently running up to 12 survey crews. ➢ We carry errors and omissions insurance for up to $2, 000,000.00 per occurrence. > Union trained and staffed All surveyors' vehicles have cellular communication abiUties for quick response to questions and problem handhr{g. > GPS services available for all jobs! PROPOSED BY: LLI,`':P SUM TOTAL: 600.00 N.ELL, DATE: 10/27/04 EXEC VICE PRESIDENT THIS PROPOSAL IS BASED ON ONE SET OF STAKES. RE -STAKING WILL BE DONE ON AN HOURLY BASIS AT OUR CURRENT HOURLY RATES. THIS SCOPE AND PRICEIS BASED ON ONE MOVE -IN PER LINE ITEMS UNLESS NOTED OTHERWISE. MULTIPLE MOVE -INS CREATE MORE WORK FOR US THUS WE WILL NEED TO NEGOTIATE MULTIPLE MOVE -INS. THIS PROPOSAL IS SUBMI I-rl>O BY ED ADKISON, A LICENSED LAND SURVEYOR (LS 5390) AND PRESIDENT OF ADKISON ENGINEERS. INC., A CALIFORNIA CORPORATION dba adkan ENGWEER5 6644d,prp is.doc Committed to Client Satisfaction *This proposal does not include interior building utility stakes. Due to liability issues, adkan ENG/NEERSwilI only provide column lines to utilities outside of buildings. v:v-yE.-b07t :05 �rt�a��AUL rn4�cM al'F!k�. ..53ddru6d .V- c ctIZ/001?. SUBCONTRACTOR POTENTIAL CHANGE ORDER REQUEST REQUESTED BY: Mareotte + Hearne Buildus, 11696 Sorrcrao Valley Rd. Sulie 200 San Die o. CA 92121 Attn: Jascn Sardets PROJECT NAME: National City Fire Station It34 DATE: 11/4/2004 CHANGE IN WORK NOTIFICATION NUMBER: Requested CONTRACT NUMBER: PHI Jobff 937-04 Remove sods from UV tank displaced by rock REF NUM T LABOUR CLASSIFICATION HOURS xt.0 x1.5 x2.0 01FF. HOURLY RATE LABOR COST 1 Laborer Foreman 0 3 75.00 $0.00 2 Laborer General 0 $ 52.00 $0.00 3 Operator 3/4 Yard BH 0 $ 65.00 $0.00 4 $ - $0.00 5 $ - $0.00 6 $ - $0.00 7 $ - $0.00 8 MATERIALS: 13 (Attach take -off snee0 MATERIAL DESCRIPTION Dump Fee Dirt Disposal CITY 2 UNITS Ea. UNI1' COST $ 150.00 $ - $ - $ $ $ $ 5 TOTAL LABOR: MATERIAL COST $300.00 $0.00 $0.00 $0.00 $0.00 so $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Line 1 OTHER CASTS: (Attach itemized informationI DESCRIPTION 1 Truck 10 Yard Dump & Driver 4 TOTAL MATERIAL: (7.75% of Une 2) SALES TAX: TOTAL LABOR, MATERIAL, AND SALES TAX MARK-UP ON LABOR AND MATERIAL Q TY 4 SUBCONTRACTS: (Attac1 Sanconascmrs proposal) SUBCONTRAI:TORrJA4E / bESCRIPTION 1 UNITS Hrs UNIT COST $ 82.00 S $ $ OTHER COST $ 328.00 $ $ S $ $300 $23 $323 $48 TOTAL OTHER COSTS: MARK-UP: (sum of Ones 4. 5, 6,7) SUBTOTAL: SU13C01iFriAC Co $ $ $ $328 Une 2_ Line 3 Line a Line 5 S4920 5749 $ SUBCONTRACT COSTS: SOU) One9 MARK-UP: SO.00 tine 10 Irmotal at Lines 9 and 16) TOTAL SUBCONTRACT COSTS: ®¢uric milrsM SUi9MITTED BY: TOTAL CHANGE REQUESTED BY SUBCONTRACTOR: Theodore A. Brown DATE: 11/4/2004 (Total of Lines 8 and 11) GRAND TOTAL: $0 Line 6 Line 7 Line 8 Line 11 $7491Line 12 $749 Jose Garcia From: Sent: To: Subject: COR 46 schedule delay.pdf (95 ... COR 46 Jason Sanders jjsanders@mhbuilders.com] Wednesday, October 27, 2004 2:50 PM Wayne Powderly; Steve Kirkpatrick; Roman McNaughton; Jeff Katz; Howard Mills; Dave Porter; Bill Hearne; Jose Garcia COR 46 schedule delay The attached schedule shows the added time required to relocate the UV Tank. I will fax the change order to the project team shortly. 1 Start Date 15MAR04 Finish Date 03MAR05 Data Date 250CT04 Run Date 270CT04 11:16 © Prime ystems, Inc. National City Fire Station #34 PROJECT MILESTONES 135 ROCK 249 M+H 214 ARC SttE WORK IRi ia/ Sitework PROJECT DURATION IN CALENDAR DAYS Marcotte + Hearne Builders, Inc. National City Fire Station #34 As of October 25, 2004 15MARO4A 4 Rain Days Lost 10-18,19,20,21-04 180CTO4A STRUCTURAL COMPLETE WALLS DRIED IN ROOF DRIED IN START OF/OI EQUIPMENT INSTALLATION ELECTRICAL COMPLETE INSTRUCTION TO OWNER'S PERSONNEL MECHANICAL COMPLETE PROJECT SUBSTANTUALLY COMPLETE WEATHER RELATED DAYS (5 WORK DAYS ) PROJECT COMPLETION (2-22-05 ) 24JAN05 11FEB05 25FEB05 03MAR05 4 100 0 210CTO4A 0 0 0 11NOVO4 70 0 0 0 17NOVO4 66 0 0 0 22NOVO4 63 0 27JAN05 17 5 0 5 17FEB05 0 15FEB05 22FEB05 25FEB05 03MAR05 13JANO5 3 • 515 1BIGH FORM & POUR FOOTING @ WALL J 180CTO4A 5 20 4 280CT04 43 540.1 AVIA INITIAL LANDSCAPE IRRIGATION + UG SLEEVES 250CT04 7 0 7 02NOVO4 43 525 MINS FOOTING REBAR @ WALL J 290CT04 2 0 2 01NOVO4 44 595 BIGH FORM & POUR FOOTINGS @ WALLS E, F & G 10DECO4 5 0 5 16DECO4 18 625 MINS FOOTING REBAR @ WALLS E, F & G 13DECO4 2 0 2 14DECO4 20 535 NEWD CMU WALLS & CAPS @ WALL J 14DECO4 5 0 5 20DECO4 31 630 NEWD CMU WALLS & CAPS @ WALLS E, F & G 17DEC04 5 0 5 23DEC04 18 590 CROW FENCING @ WALLS D, E, F & H 21DEC04 5 0 5 27DEC04 31 645 NEWD WALL CAPS @ WALLS A, 8 & C 24DEC04 2 0 2 27DEC04 2 0515 NEWD SITE MASONRY WALL CAPS @ LOWER TRAINING 24DEC04 5 0 5 30DECO4 18 9 Early Bar Progress Bar Critical Activity NC33 Sheet 1 0 Marcotte + Hearne Builders Inc. National City Fire Station #34 As of October 25, 2004 Date ♦ ♦ -temakino ata 1 Revision 1 • Sheet 1 of 9 • • ♦ Checked Approved Marcotte + Hearne Builders, inc. National City Fire Station #34 As of October25, 2004 Sheet 2 of 9 ° t s f' � t%y`� 1 .��' 5 i;? ,.<t "" see x p .. , ��."r ,Ali • a =Y 'a a "P:T - �' s. a .:s L7EC,..;._ AN.: 530 CROW FENCING Q LOWER AREA ( WALLS B & C) 31 DECO4 5 ®ryl �.x.....::.a.»3V.I:.Sn..�.�.c 0 pttt 5 L tt t1119, ', 06JANO5 y sl to - .e.��£i.:vl 18 ff.11.:��. pig}yyp ��.., ..a 9�.1�'i rA•1�.�, $$�$� ��`1r'�R'�'�i�?'. P.O.BKii(�'i.'N.�ni�l'. . M � �1 i. P'i�al P 4�Ri+o'. 500 WHIL FINISH GRADING 11JANO5 3 0 3 13JANO5 3 540 AVIA FINAL LANDSCAPE IRRIGATION + UG SLEEVES - 12JANO5 7 0 7 20JANO5 5 520 BIGH SITE CONCRETE PERIMETER SIDEWALKS / CURBS 12JANO5 8 0 8 21JANO5 5 545 AVIA LANDSCAPE IRRIGATION+UGSLEEVES - SOUTH 21JANO5 7 0 7 31JAN05 7 550 AVIA LANDSCAPE PLANTING - NORTH 21JANO5 8 0 8 01FEB05 6 670 SADL MISCSITEELECTRICAL 21JANO5 10 0 10 03FEB05 12 510 BIGH SITE CONCRETE - WEST PARKING LOT 24JAN05 7 0 7 01FEB05 5 635 JDPA STRIPING & SITE SIGNAGE 02FEB05 2 0 2 03FEB05 12 1 650 UMEC PROPANE TANK PAD 02FEB05 2 0 2 03FEB05 11 I 655 CROW SECURITY GATES 02FEB05 5 0 5 08FEB05 9 680 BIGH MONUMENT SIGN 02FEB05 5 0 5 08FE605 9 El 513 BIGH SITE CONCRETE - EAST DRIVE 02FEB05 8 0 8 11FEB05 5 WM 555 AVIA LANDSCAPE PLANTING SOUTH 02FEB05 8 0 8 11FEB05 6 660 UMEC SET PROPANE TANK 04FEB05 1 0 1 04FEB05 11 585 M+H FLAGPOLE 14FE805 1 0 1 14FEB05 5 € r 9960 M+H SITEWORK COMPLETE 0 0 0 14FE805 5 '0 :��. ..,�. � y� ,h. a^ "- 4' ��'r% �%a�'fr ,Z.tl✓v Jr4.v. r ix 'Y r ^.��E t✓ e'E'��,a=4 *e�ak e�'C% '``,�`.d $�'�,�,' t �as4�`� s�.w � i" I. f � ssE �� �a..e� e �# t4` `��r Y`r ^:{9 ✓ G � �i� s`� : @�IN 3 , � i 4000 SADL UNDERSLAB ELECTRICAL 120CT04A 2 100 0 140CT04A ■ 4005 UMEC UNDERSLAB MECHANICAL & PLUMBING 11JANO5 2 0 2 12JANO5 3 SIGH FORM & POUR SLAB @ GENERATOR ROOM 13JANO5 3 0 3 17JANO5 3 �512 512.1 MINS REBAR © GENERATOR ROOM SLAB 14JANO5 1 0 1 14JAN05 4 I 4030 512.2 TLSU NEWD INSTALL DOOR FRAME CMU WALLS & PRE -CAST CAP © GENERATOR ROOM 18JANO5 18JAN05 1 3 0 0 1 3 18JANO5 20JANO5 5 3 1 M 512.4 SADL SET GENERATOR / COMPRESSOR & MISC. 21JANO5 3 0 3 25JAN05 3 512.3 ARC ROOFING SYSTEM Q GENERATOR ROOM 26JAN05 2 0 2 27JAN05 3 4025 TLSU INSTALL DOOR & HARDWARE 28JAN05 1 0 1 28JANO5 6 I 4010 UMEC MECHANICAL EXHAUST FANS / FINISH 28JAN05 3 0 3 01FEB05 3 4015 SADL ELECTRICAL ROUGH -INS 31JAN05 2 0 2 01FEB05 4 4020 EMS SET SHEETMETAL LOUVER 02FEB05 1 0 1 02FEB05 3 I 4035 MCPA PAINTING 03FEB05 2 0 2 04FEB05 3 1 �' r �9Q��,!'/✓ i&<`,..^✓'a'.,^�F.,,a�'Y.a.ia,.;f,..''r 511 NEWD %` °"�a fs* c 'x ✓ x ✓ h�,s{ c,, j; �; ` j t 'm ` _ ,j f ' Larerkx.Sri.i't4A,"..�I'.9,ss"!✓3a.,,f,1x.....s..,°?.,'`..u..c_°'.,,.,y..�ht",�:EwuLG4....Jm%°X�....�. FORM & POUR SLAB @ TRASH ENCLOSURE "izur b atr 02FEB05 s s.z: 3 +. , 0 e axe 3 Y -. «+ x .. 04FEB05 y ' 7 '� tSrs+ 12 511.2 NEWD REBAR © TRASH ENCLOSURE SLAB 03FEB05 1 0 1 03FEB05 12 Exterior Elevation Construction ERECT SCAFFOLD 250 COFF PLASTER - LATH & SCRATCH COAT 253 COFF SCRATCH COAT CURE (2 Cal Days) 251 COFF PLASTER - BROWN COAT 254 COFF BROWN COAT CURE (10 Cal Days) 240 SUNP GLASS & GLAZING / STOREFRONT 252 COFF PLASTER- FINISH COAT EXTERIOR MASONRY VENEER REMOVE SCAFFOLD FINISH COAT CURE (14 Cal Days) EXTERIOR PAINTING INSTALL BI-FOLD DOORS 1245 COFF ERECT SCAFFOLD COFF COFF PLASTER - LATH & SCRATCH COAT SCRATCH COAT CURE (2 Cal Days) GLASS & GLAZING / STOREFRONT PLASTER- BROWN COAT 1254 COFF BROWN COAT CURE (10 Cal Day) 1255 COFF EXTERIOR MASONRY VENEER 1252 PLASTER - FINISH COAT 1262 FINISH COAT CURE (14 Cal Days) MCPA COFF EXTERIOR PAINTING REMOVE SCAFFOLD TRAINING TOWER Design & Procurement TOWER DESIGN SUBMIT DEFFERED APPROVAL PACKAGE FABRICATION OF TOWER RECEIVE APPROVAL 0575 CNC (City Council Approval of UV Tank Removal Marcotte + Hearne Builders, inc. National City Fire Station #34 As ofOctober 25, 2004 26OCT04 29OCT04 09NOVO4 11 NOV 04 18NOVO4 22NOVO4 01 DEC04 01 DEC04 10DEC04 10DEC04 24DEC04 10JAN05 05NOVO4 09NOVO4 18NOVO4 22NOVO4 22NOVO4 01DEC04 O1 DEC04 10DEC04 0 3 28OCT04 7 0 7 08NOVO4 2 0 2 10NOVO4 5 0 5 17NOVO4 7 0 7 30NOVO4 5 0 5 30NOVO4 7 0 7 09DEC04 7 0 7 09DEC04 2 0 2 13DEC04 10 0 10 23DEC04 7 0 7 03JAN05 19JAN05 08NOVO4 7 0 7 17NOVO4 3 2 0 2 19NOVO4 3 5 0 5 30NOVO4 5 0 5 30NOVO4 3 7 0 7 09DEC04 3 7 0 7 09DEC04 7 0 7 20DEC04 3 21DEC04 10 0 10 03JAN05 3 31DEC04 5 0 5 06JAN05 3 07JAN05 27JULO4A 01SEP04A 20OCT04A 27OCT04 01 NOVO4* Sheet 7 of 9 0 2 10JAN05 3 27OCT04 27OCT04 29NOVO4 27OCT04 01NOVO4 0595 0600 0620 0605 0610 0625 0615 PAUL 0630 PAUL 0660 SADL 0665 SADL 0670 SADL PAUL I Excavate New Hol e PAUL PAUL PAUL PAUL 0560 MINS 0570 BIGH 0585 BIGH 0635 MINS 0640 BIGH 570 470 490 575 560 565 WRG WRG PAUL Remove Outside Piping & Excavate Existing Tank Backfill & Clean-up Tank A rea Place Existing Tank & Re -Pipe System Pour Concrete Install Catch Basin Install Motors & Piping Final Tank Connection / Backfill Utilities Excavate/Intercept Electrical Conduit Install Conduit / Inspection Concrete Encase/Backfill/Recompact REBAR @ SLAB SLAB POUR @ TRAINING TOWER AREA Fine Grade/Tower Slab Prep @ West Training Area Rebar @ Slab West Training Area Place Slab Sections @ West Training Area Concrete Slab Cure @ West Training Area (7 cd) FORM & POUR TOWER SLAB ERECT TOWER STRUCTURAL STEEL SET STAIRS, HANDRAILS & DECKING METAL ROOFING / MISC TRIM & DOORS METAL SIDING @ TOWER - PHASE 1 METAL SIDING @ TOWER - PHASE 2 UTILITIES FOR TOWER SYSTEM TOWER PUNCHLIST TRAINING TOWER COMPLETE TRAINING FOR FIRE MEN CTIONS & PROJECT CLOSE-G MIT ;ELEVATOR TESTING & FINAL INSPECTIONS UMEC BUILDING TEST & BALANCE Marcotte + Hearne Builders, Inc. National City Fire Station tt34 As of October 25, 2004 02NOVO4 04NOVO4 09NOVO4 11 NOVO4 11 NOV 04 19NOVO4 19NOVO4 23NOVO4 30NOVO4 02DECO4 03DECO4 06DECO4 08OCTO4A 140CTO4A 08DECO4 13DECO4 15DECO4 20DECO4 140CTO4A 27DEC04 03JANO5 13JAN05 20JANO5 27JAN05 03FEB05 15FEB05 25FEB05 01FEB05 09FEB05 iur , s.;g n uur rImsn . to 2 0 2 03NOVO4 -7 3 08NOVO4 2 10NOVO4 3 15NOVO4 6 18NOVO4 2 22NOVO4 2 22NOVO4 4 30NOVO4 2 01DECO4 1 02DECO4 1 03DEC04 2 07DECO4 120CTO4A 140CTO4A 10DECO4 14DECO4 17DEC04 24DEC04 140CTO4A 31DECO4 12JAN05 19JAN05 26JAN05 02FEB05 14FEB05 24FEB05 24FEB05 03MAR05 Sheet 8 of 9 Marcotte + Hearne Sunders, Inc. National City Fire Station #34 As of October 25, 2004 Sheet 6 of 9 '11 i:r '''' ''''' 1820 — UMEC ,p,-'4-'4 ' ' ''''' 4 '—' ' -i '''' `4'' FINISH PLUMBING ' ' °'''' ' 12JAN05 '4' 4 3 4'—'7 0 4' 3 "t4 ''''4 .4.• 4-4" 14JANO5 ' 4'''' 16 "I't 41%-j''' v--':<-'-"^".---- IOW , -- - _ 1825 WERE CABINETRY WORK 12JANO5 3 0 3 14JANO5 21 N II MI 1780 DIVI TOILET PARTITIONS & ACCESSORIES 17JANO5 2 0 2 18JANO5 20 1795 GARO INSTALL ACOUTICAL CEILING TILE 17JA NO5 2 0 2 18JANO5 16 1790 ROAR CARPET 19JANO5 1 0 1 19JANO5 19 1800 VALL FLOOR TILE 19JANO5 4 0 4 24JAN05 16 i 330 WEST KITCHEN AND LAUNDRY EQUIP. 24JAN05 5 0 5 28JAN05 13 E i 1 1805 TLSU HANG DOORS & HARDWARE 25JAN05 2 0 2 26JANO5 16 1830 CONT WINDOW BLINDS 27JAN05 1 0 1 27JAN05 16 1835 ' BEST CLEANING 28JAN05 03NOVO4 1 5 0 0 1 5 28JAN05 09NOVO4 16 24 C E 161 UMEC ROUGH IN MECHANICAL - 2ND FLOOR Y� 165 SADL I ROUGH IN ELECTRICAL / FIRE ALARM - 2ND FLOOR 03N0VO4 5 0 5 09NOVO4 24 185 UMEC ROUGH IN PLUMBING - 2ND FLOOR 03NOVO4 5 0 5 09NOVO4 24 2725 TLSU INSTALL DOOR FRAMES 24NOVO4 1 0 1 24NOVO4 18 2730 SUMP INSTALL WINDOW FRAMES 24NOVO4 1 0 1 24NOVO4 18 195 A&D ROUGH IN FIRE SPRINKLER - 2ND FLOOR 07DECO4 8 0 8 16DE CO4 -1 ME il 2735 INTE HANG 1ST SIDE DRYWALL 17DECO4 17DEC04 3 8 0 0 3 8 21DECO4 28DEC04 4 -1 2755 INTE METAL SOFFITS 2740 BANK INSULATION 22DEC04 2 0 2 230EC04 4 2745 INTE HANG 2ND SIDE DRYWALL 24DEC04 4 0 4 29DEC04 4 2760 INTE HANG HARD -LID DRYWALL CEILINGS 29DEC04 4 0 4 03JANO5 -1 EMI E E 1 2750 INTE TAPE & FINISH DRYWALL 04JANO5 8 0 8 13JANO5 -1 2765 MCPA PAINTING 14JANO5 2 0 2 17JAN05 -1 2775 GARO T-BAR CEILING GRID ISJANO5 3 0 3 20JANO5 0 2720 WERE TRIM CARPENTRY 18JAN05 4 0 4 21JANO5 5 , 2770 VALL CERAMIC TILE @ BATHROOM 18JANO5 4 0 4 21JAN05 -1 E 1 2825 WERE CABINETRY WORK 24JAN05 3 0 3 26JAN05 5 2785 UMEC FINISH MECHANICAL 24JAN05 4 0 4 27JAN05 -1 2810 SADL FINISH ELECTRICAL/FIRE ALARM 24JAN05 4 0 4 27JAN05 -1 2815 A&D FINISH FIRE SPRINKLER 24JAN05 4 0 4 27JAN05 -1 2820 UMEC FINISH PLUMBING 24JAN05 4 0 4 27JAN05 -1 M 2780 DIVI TOILET PARTITIONS & ACCESSORIES 28JAN05 2 0 2 31JANO5 3 2795 GARO INSTALL ACOUTICAL CEILING TILE 28JAN05 2 0 2 31JANO5 -1 2790 ROAR CARPET 01FEB05 1 0 1 01FEB05 2 2800 VALL FLOOR TILE 01FEB05 4 0 4 04FEB05 -1 2805 TLSU HANG DOORS & HARDWARE 07FEB05 2 0 2 08FEB05 -1 1 i , • - • 2830 2835 CONT BEST WINDOW BLINDS I CLEANING 09FEB05 10FEB05 1 1 0 0 1 1 09FEB05 10FEB05 -1 -1 Marcotte + Hearne Builders, inc. National City Fire Station #24 As of October 25, 2004 Sheet 5 of 9 > �ar�': IIII .a( ,x h� 8 N>Y. � s. �" ,, �` t 'a �;c +*`;~ ,, sg < <:,:. �� ".`v, �a.rh i .�4.b -:r r >�<^:;' ,$.�.. �� a°�UEa~-' �`;tAtil � 'XE:B `MAR "4u.,:.:..+d6: Mks --'e'• a AO ''a, �g'_�i��R„"s N s..'.'+u... YlY 4u34irz•araf[°'.' 'A�4�V ,- Y `.tFs0 �s�..wss�....a.,x,...,r.:,t,.,�.<'=.•,b::4�s�.iiill8i..�afi:$Ei9i'�12Yfl2i8us`mi�l't1i��k{1�2rT .1b ":" iIY15'I�k.�� '>''I�QH-L q a,' }, �#,. �irtlit���7r�ia'�'diEJtFI r�ilE��iiur"�#iI21�I2.8 ,�.:"iS;,r'u�hV"ah 3710 UMEC ROUGH IN MECHANICAL 12NOVO4 8 0 8 23NOVO4 15 3715 A&D ROUGH IN FIRE SPRINKLER 12NOVO4 8 0 8 23NOVO4 20 3730 SUNP INSTALL WINDOW FRAMES 23NOVO4 1 0 1 23NOVO4 20 3735 INTE HANG 1ST SIDE DRYWALL 24NOVO4 3 0 3 30NOVO4 20 3755 INTE METAL SOFFITS 24NOVO4 8 0 8 07DECO4 15 3740 BANK INSULATION 01DEC04 2 0 2 02DECO4 20 3745 INTE HANG 2ND SIDE DRYWALL 03DEC04 4 0 4 08DECO4 20 3760 INTE HANG HARD -LID DRYWALL CEILINGS 08DEC04 4 0 4 13DEC04 15 3750 INTE TAPE & FINISH DRYWALL 14DEC04 8 0 8 23DEC04 15 3765 MCPA PAINTING 24DEC04 2 0 2 27DEC04 15 3770 VALL CERAMIC TILE @ WALLS 28DECO4 4 0 4 31DEC04 18 3785 UMEC FINISH MECHANICAL 05JAN05 3 0 3 07JAN05 16 II 3810 'SADL FINISH ELECTRICAL / FIRE ALARM 05JAN05 3 0 3 07JAN05 16 Boa. 3815 A&D FINISH FIRE SPRINKLER 05JAN05 3 0 3 07JAN05 16 III 3820 UMEC FINISH PLUMBING 05JAN05 3 0 3 07JAN05 16 3825 WERE CABINETRY WORK 10JAN05 3 0 3 12JAN05 16 3805 TLSU HANG DOORS & HARDWARE 13JAN05 2 0 2 14JAN05 16 1 3830 FX � i.. ,! a $ 160.1 CONT Y.:-. Y`i% SADL WINDOW BLINDS C %::"F"�y+' �!` � �ja �..F vt/' A` K`1 �°� l",.v^✓i H4 ROUGH IN ELECTRICAL / FIRE xF ti i �.✓ 0 4"� '-L,W `fi 3 Y^f if} ALARM -1ST FLOOR 17JAN05 i2— F 3 2 yu c% 18OCT04A 1 /. e 8 0 ..3 "5� 4 13 1 y - �,x �a ^_n 7 17JAN05 4'Y� ti 02NOVO4 :P'l� ifi K 17 y d 'Y'Yrt*: 24 9 160.2 UMEC ROUGH IN MECHANICAL - 1ST FLOOR 18OCT04A 8 13 7 02NOVO4 24 ! �� 160.3 UMEC ROUGH IN PLUMBING - 1ST FLOOR 18OCTO4A 8 13 7 02NOVO4 24 1725 1730 TLSU SUNP INSTALL DOOR FRAMES INSTALL WINDOW FRAMES 23NOVO4 23NOVO4 1 1 0 0 1 1 23NOVO4 23NOVO4 18 18 I i 160 A&D ROUGH IN FIRE SPRINKLER- 1ST FLOOR 23NOVO4 8 0 8 O6DEC04 -1 1735 INTE HANG 1ST SIDE DRYWALL 07DEC04 3 0 3 09DEC04 12 1755 INTE METAL SOFFITS 07DEC04 8 0 8 16DECO4 16 1740 BANK INSULATION 10DEC04 2 0 2 13DEC04 21 1745 INTE HANG 2ND SIDE DRYWALL 14DEC04 4 0 4 17DEC04 21 1760 INTE HANG HARD -LID DRYWALL CEILINGS 17DEC04 4 0 4 22DEC04 16 1750 INTE TAPE & FINISH DRYWALL 23DEC04 8 0 8 03JANO5 16 1765 MCPA PAINTING 04JAN05 2 0 2 05JAN05 16 1775 GARO T-BAR CEILING GRID 06JAN05 3 0 3 10JAN05 17 1720 WERE TRIM CARPENTRY 06JAN05 4 0 4 11JAN05 21 1770 VALL CERAMIC TILE @ BATHROOM O6JAN05 4 0 4 11JAN05 16 1785 UMEC FINISH MECHANICAL 12JANO5 3 0 3 14JAN05 16 1810 SADL FINISH ELECTRICAL / FIRE ALARM 12JAN05 3 0 3 14JAN05 16 I �� 1815 A&D FINISH FIRE SPRINKLER 12JAN05 3 0 3 14JAN05 16 SADL ROUGH IN ELECTRICAL / FIRE ALARM UMEC ROUGH IN MECHANICAL UMEC ROUGH IN PLUMBING 715 A&D ROUGH IN FIRE SPRINKLER 725 TLSU INSTALL DOOR FRAMES 230.1 SECU METAL DOORS & FRAMES DELIVERY 755 INTE METAL SOFFITS 760 INTE HANG HARD -LID DRYWALL CEILINGS 730 SUNP INSTALL WINDOW FRAMES 735 INTE HANG 1ST SIDE DRYWALL 740 BANK INSULATION 745 INTE HANG 2ND SIDE DRYWALL 75D INTE TAPE & FINISH DRYWALL 765 MCPA PAINTING 775 GARO T-BAR CEILING GRID 720 WERE TRIM CARPENTRY 770 VALL CERAMIC TILE @ BATHROOM 785 UMEC FINISH MECHANICAL 810 SADL FINISH ELECTRICAL / FIRE ALARM 815 A&D FINISH FIRE SPRINKLER 820 UMEC FINISH PLUMBING 825 WERE CABINETRY WORK 730 DIVI TOILET PARTITIONS & ACCESSORIES 795 GARO INSTALL ACOUTICAL CEILING TILE 790 ROAR CARPET 800 VALL FLOOR TILE 230.2 F&H WOOD DOORS & HARDWARE DELIVERY 805 TLSU HANG DOORS & HARDWARE 830 CONT WINDOW BLINDS 835 BEST CLEANING 3700 UMEC ROUGH IN PLUMBING 3705 SADL ROUGH IN ELECTRICAL / FIRE ALARM 3230.1 SECU METAL DOORS & FRAMES DELIVERY 3725 TLSU INSTALL DOOR FRAMES Sheet 4 of 9 IiR'..IiiY, � ^. F,°,{E RM a."fR M51, icriCi4.f9�0A Marcotte + Neame Builders, Inc. National City Fire Station 034 As ofOctober 25, 2004 21SEPO4A 20 30SEPO4A 15 110CT04A 8 250CT04 260CT04 80 2 270CT04 180CT04A 8 75 2 260CT04 32 270CT04 1 27OCT04 0 270CT04 01NOVO4` 8 0 8 10NOVO4 11NOVO4 4 0 4 16NOVO4 22NOVO4 1 0 1 22NOVO4 23NOVO4 3 0 3 29NOVO4 30NOVO4 2 0 2 01DECO4 t • m 07DECO4 06DECO4 8 0 8 15DEC04 16DE CO4m 17DEC04 20DE CO4 3 0 3 22DEC04 20DECO4 4 0 4 23DEC04 20DECO4 4 0 4 23DEC04 24DEC04 3 0 3 28DECO4 24DEC04 3 0 3 28DEC04 24DEC04 3 28DEC04 24DEC04 3 0 3 28DECO4 24DEC04 3 0 3 28DECO4 29DEC04 2 0 2 30DECO4 29DEC04 2 31DECO4 1 31DEC04 4 0 4 06JANO5 0 06JANO5 2 10JAN05 1 11JAN05 150CTO4A 30DECO4 31 DE C04 05JANO5 07JAN05 10JANO5 11 JAN05 23NOVO4 15OCT04A 8 10 7 23NOVO4 25OCT04A 0 280CT04 280CT04 STATION HEADQUAT Sub -Structure 355 BIGH 375 MINS 385 BIGH SLAB PREP @ APPARATUS ROOM (4 TO 6 ) REBAR @ APPARATUS SLAB POUR APPARATUS SLAB 200 EMS FLASHING AND SHEETMETAL 211.1 ARC LOAD / INSTALL ROOF PAPER 211 ARC INSTALL TILE ROOFING 1 LOAD ROOF 212 ARC BUILT-UP ROOFING 217 UMEC SET HVAC ROOF TOP UNITS 1 CURBS 131 ROCK ROOF FRAMING & SHEATHING 175 ROCK FRAME WALLS 225 ROCK EXTERIOR SOFFIT FRAMING 605.1 ARC LOAD ROOF PAPER 600 EMS ,FLASHING AND SHEETMETAL 605 ARC INSTALL TILE ROOFING 640 GYRO INSTALL BIFOLD DOOR RAILS 1ST FLOOR WALL FRAMING 1ST FLOOR INSTALL STAIRS #1 AND #2 RFI 211 Camber @ Glu-Lam Beam 2ND FLOOR DECK & WALLS ROOF TRUSS FRAMING & SHEATHING POUR LWT CONCRETE EXTERIOR SOFFIT FRAMING 610 EMS FLASHING AND SHEETMETAL 615 ARC INSTALL TILE ROOFING Marcotte + Hi Builders, Inc. National City r,re Station #34 As of October25, 2004 28DEC04 30DECO4 04JAN05 070CTO4A 2 150CTO4A 2 260CT04 3 09NOVO4 5 23NOVO4 1 27SEPO4A 10 27SEPO4A 7 060CTO4A 6 150CTO4A 5 260CT04 2 260CT04 3 05JANO5 3 27SEPO4A 080CTO4A 110CTO4A 150CTO4A 220CT04A 05NOVO4 09NOVO4 12NOVO4 16NOVO4 620 ARC BUILT-UP ROOFING 16NOVO4 162 MIT ROUGH IN ELEVATOR GUIDES & RAILS -PHASE 1 10DECO4 163 MIT ROUGH IN ELEVATOR GUIDES & RAILS -PHASE 2 22DEC04 168 MIT ELEVATOR CAB & FINISHES 03JANO5 10 100 33 0 0 03JANO5 03JANO5 04JANO5 280CT04 180CTO4A 270CT04 15NOVO4 23NOVO4 20CTO4A 100 0 180CT04A 280CT04 100 0 250CT04A 0 2 270CT04 30 0 3 280CT04 30 3 07JAN05 6 100 0 150CTO4A 250CT04 4 100 0 140CTO4A 7 29 5 290CT04 5 20 4 04NOVO4 2 0 2 08NOVO4 3 0 3 11NOVO4 2 0 2 15NOVO4 3 0 3 18NOVO4 5 0 5 22NOVO4 8 0 8 21DEC04 8 0 8 31DECO4 8 12JAN05 Sheet 3 of 9 TIPifP:MY 390 ASG BUILDING SIGNAGE 9998 M+H PUNCHLIST AND CLOSEOUT 5000 CNC FIRE MARSHALL FINAL INSPECTIONS 380 M+H FINAL INSPECTIONS Marcotte + Hearne Builders, Inc. National City Fire Station #34 As ofOctober 25, 2004 11FEB05 11FEB05 8 16FEB05 18FE805 3 0 2 14FEB05 0 0 8 22FEB05 -1 0 5 22FEB05 -1 0 3 22FEB05 -1 Sheet 9 of 9 AAA@a'nwinwuU///// CITY OF NATIONAL CITY FIRE DEPARTMENT Phone: (619) 336-4550 MEMORANDUM I DATE: TO: COPY: FROM: November 10, 2004 Stephen Kirkpatrick, City Engineer Roderick Juniel, Fire Chief 1�co Donald Condon, Battalion Chief J SUBJECT: Relocation of Water Clarification Vault - Station 34 It was brought to the attention of the Fire Administration Staff by our Firefighters that the Water Clarification System vault is so located as to reduce the efficiency of the training area. The training area is being constructed on the north side of the new fire station project. Through the efforts of our Training Officer, Firefighters and Fire Administration, an evaluation of the situation and conditions was conducted. The National City Fire Department would like to request the relocation of the water clarification vault. The justification for this request is as follows. The current location of the clarification system vault limits and restricts the ability of the training site. Access to the five story training tower has been restricted limiting the type and number of training exercises that can be conducted at the tower. The current vault location restricts setup options for our truck company (T-34) to conduct aerial operations. Per NCFD training standards, NFPA 1002, and manufacturer recommendations, stabilization devices (outriggers) are not to be placed on vault covers. A manufacturer representative states that placement on stabilization devices on vault covers could create a hazardous condition with the potential of over stressing the outriggers due to movement or slippage along with the potential of vault cover failure. Manufacturer's recommendation is to avoid placing outriggers on vault covers. NCFD's quint fire truck, which operates a 75 foot aerial ladder, has a gross vehicle weight of 47,560 pounds. This vehicle is scheduled for replacement within the next 7 years at which time NCFD will be looking into acquiring a 105 foot minimum aerial ladder, with a gross vehicle weigh of approximately 69,500 pounds. The City of Chula Vista currently operates a ladder truck with an approximate weight of 70,000 pounds. Due to joint training conducted throughout South Bay, Chula Vista's ladder truck would be utilized during training exercises at NCFD's training facility. The relocation of the water clarification system vault is imperative to maximize the effective utilization of the training area and five story training tower currently under construction at the new Main Fire Station, Station 34. Thank you for your consideration on this very important matter. EXPLANATION: The plans and specifications for the Fire Department project include a training yard with two fire hydrants that operate on a closed tank and pump system. This system captures the water, up to 1,200 gallons a minute, used in training exercises and recycles that water for re -use. A component of this system is an underground vault that contains the controls, the water pumps, and an ultraviolet light water disinfectant system — the "UV Water Treatment/Pump Assembly" which is located in an underground vault. The plans and specifications show the UV Water Treatment/Pump Assembly vault to be located approximately 35 feet from the northeast corner of the training tower. The plans were reviewed by the Fire Department during design, however during the construction of the facility a number of Fire personnel, including the training officer, visited the site. Upon seeing the actual work installed it became a consensus belief among the firefighters that the location of the underground vault would limit their ability to place equipment around the training tower, and thereby limit their ability to train. Consequently the Fire Department requested the relocation of the underground vault. The change order cost has been negotiated with the contractor. Based upon the work necessary to relocate vault a reasonable cost is $56,215. However the relocation of the vault affects the critical path schedule of the project extending the time of completion by 7 days. The contractor's overhead and profit on this $7,000,000 project is approximately $1,780 per day, so the extension in the time of completion adds $12,464 to the cost bringing it to $68,679. This cost is based upon the notice to proceed with this work being given on November 1. This was discussed with the City Manager and he authorized the notice to proceed as it has been determined necessary and work and delaying the decision until it could be placed on the Council agenda would add $1,780 per day. This is now before Council to ratify that decision and make it an "official" component of the project. However, it should be noted that this change order is written for a "not to exceed" amount of $68,679. This cost is based upon all other work on the project being substantially complete by February 22, 2005 in accordance with the schedule. If all other work is not substantially complete it will be because the contractor has caused delay other than the delay caused to the schedule by this change order work. If that is the case, then the City will not be responsible for the extended overhead and profit costs for each day that the work is not complete. If all other work is not complete within the seven working days or by March 3, 2005, the total cost of this change order will be the $56,215. RESOLUTION NO. 2004 — 226 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NO. 11 WITH MARCOTTE & HEARNES BUILDERS, INC. IN THE "NOT TO EXCEED" AMOUNT OF $68,679 TO RELOCATE THE ULTRAVIOLET WATER TREATMENT/PUMP ASSEMBLY UNDERGROUND VAULT FOR THE FIRE STATION CONSTRUCTION PROJECT AS REQUESTED BY THE FIRE DEPARTMENT WHEREAS, the contract for the Fire Department Construction Project was awarded to Marcotte & Hearnes Builders, Inc. on February 17, 2004, by the adoption of Resolution No. 2004-31; and WHEREAS, upon visiting the site, Fire Department personnel found that the location of the ultraviolet water treatment/pump assembly underground vault would limit their ability to place equipment around the training tower, and thereby limit their ability to train. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 11 with Marcotte & Hearnes Builders, Inc. in the not to exceed amount of $68,679 for the relocation of the ultraviolet water treatment/pump assembly underground vault for the Fire Station Construction Project. PASSED and ADOPTED this 7"' day of December, 2004. ATTEST: Michael R. Della, ity Clerk APPROVED AS TO FORM: giau -s George H. Eiser, III City Attorney Nick Inzunza, Mayor Passed and adopted by the Council of the City of National City, California, on December 7, 2004, by the following vote, to -wit: Ayes: Councilmembers Natividad, Parra, Zarate. Nays: None. Absent: Councilmember Inzunza, Morrison. Abstain: None. AUTHENTICATED BY: NICK INZUNZA /(A., Ci y Clerk of the ity f National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2004-226 of the City of National City, California, passed and adopted by the Council of said City on December 7, 2004. City Clerk of the City of National City, California By: Deputy