HomeMy WebLinkAbout2004 CON Jaynes Corporation - Library Construction Change Order #4CONTRACT CHANGE ORDER TO (Contractor): Jaynes Corporation 8530 La Mesa Blvd. Suite 306 La Mesa, California 91941 C/O Number: C/O Initiation Date: Project 004 November 8, 2004 National City Public Library Contract No.: 1028 A Chance Order is hereby recommended for the followins work in the amount identified in this document: DESCRIPTION OF CHANGE: 1. ASI #001: Added Cost for clarified identification of Elevator Cab Interior Wood. Panels....$1,000.00 2. ASI #004: Revise the Structural Steel Skewed Beam Connection Detail $ 4,878.00 3. ASI #007: Revised Roof Steel Framing and High Parapet Alignment. $ 4,770.00 4. ASI #009:Added Slab -On -Grade Reinforcing Steel for Walker Ducts $ 2,730.00 5. ASI #012:Revised/Added Caisson Reinforcing Steel & Added Note #7 on Sheet S2.01$ 3,211.00 6. COR #019: Additional Structural Steel Detailing Costs due to Submittal Revisions $ 11,884.00 7. PR #005: Add six Outdoor Electrical Outlets along Front Elevation of Building $ 5,287.00 8. COR #033: Credit to Delete Tnemec Primer on Exposed Architectural/Structural Steel... ($1,597.00) REASON FOR CHANGE: See Attached COST RECONCILIATION: $ 32,163.00 Costs were reviewed by the Construction Manager and the City and negotiated to the satisfaction of the City. The foregoing increase in price is in full settlement of all entitlements directly or indirectly arising out of this change. Construction Contract Accounting Summary: The Original Contract Amount $ 11,476,444.00 Net change by previously authorized Change Orders $ 59,149.00 Revised Contract Amount due to previous Change Orders $ 11,535,593.00 $ 32,163.00 $ 11,567,756.00 With this Change Order request the Contract amount increases by New Revised Contract Amount Change in Contract Time: Zero (0) dar days Contract Completion jute: Ap 9 / 005 Recommen, e • oriproval IONMAN <<E' • •,Inc. ey; Pro' Rb CT ARM I CT REPRESENTATIVE Gregory Ny; President (C.A.I.) Ap CTOR/ Jaynes Corporation Ri Cohen; Senior Vice President to r�y DATE DATE //01 DATE OWNER/ City Of National City Steve Kirkpatrick; Director of Public Works/City Engineer Distribution: City Of National City (original w/all documentation) Jaynes Corporation (copy w/ all documentation) DEB, Inc. (copy w/all documentation) Carrier Johnson Architecture (copy w/all documentation) DATE OR MI . AL CONTRACT CHANGE ORDER • TO (Contractor): Jaynes Corporation 8530 La Mesa Blvd. Suite 306 La Mesa, California 91941 REASON FOR CHANGE: C/O Number: C/O Initiation Date: Project: Contract No.: 004 November 8, 2004 National City Public Library 1028 1. ASI #001; COR #005: Elevator Cab Back Wall Panel Clarification. This modification was required because the project bid documents did not clearly identify the type of wood paneling to be used. This added cost is only the difference from what was assumed at time of bid. 2. ASI #004; COR 010R1: Revise Structural Steel Skewed Beam Connection. This modification resulted from a Change/Revision to the original Beam connection. The revised design required additional detailing, material procurement/fabrication and labor. 3. ASI #007; COR #009R1: Revised Roof Steel Framing and High Parapet Alignment. This modification resulted from the structural engineer changing from a bolted connection to a welded connection detail at seven (7) locations and added work to cut "notches in fourteen (14) H-Beams at the Roof Framing. 4. ASI #009; COR #016: Added Slab -On -Grade Reinforcing Steel for Walker Duct. This modification was required due to the slab -on -grade reinforcing steel being revised to include added rebar under and around the in -slab Walker Duct. 5. ASI #012; COR #007: Revised/Added Caisson Reinforcing Steel Detail. This modification was required due to the of revising, adding and upsizing of the reinforcing steel design for two (2) Caisson footings. 6. COR #019: Additional Structural Steel Detailing Costs. This change order request was a result of changes and revisions made to the Structural Steel Shop drawings by the Structural Engineer of record for the project thereby having to revise and re -work the detailing of the steel components. 7. PR #005; COR #029R1: Six (6) Additional Outdoor Electrical Outlets. This change is to add six (6) electrical outlet locations along the front entry elevation of the building. At the time of initial design outlet requirements at the added locations was not necessary. 8. COR #033: Credit for Deleting "Tnemec" Primer on Exposed Architectural/Structural Steel. This modification was processed as a result of exanuning the compatibility of the designated primer and the finish paint to be applied. It was decided to delete the primer on all exposed structural steel members resulting in a monetary credit to the Owner. ` MAR-22-2004 12:23 CONSTRUCTION ADM IN 619 231 4138 • F.02/04 7AIA Document C710" -1992 Architect's .Supplemental Instructions PROJECT (Name and address): National City Public Library 1401 National City Blvd, National City CA 91950 OWNER Warne and address): CITY OF NATIONAL CITY 1243 National City Blvd. National City CA 91950 FROM ARCHITECT (Name and address): Carrier Johnson 1301 Third Avenue San Diego CA 92101 TO CONTRACTOR (Name and address): OWNER ARCHITECT CONSULTANT CONTRACTOR FIELD OTHER ARCHITECT'S SUPPLEMENTAL INSTRUCTION NO: 001 DATE OF ISSUANCE: March 22, 2004 CONTRACT FOR: General Construction CONTRACT DATE: ARCHITECT'S PROJECT NUMBER: 4486 01 X X The Work shall be carried out in accordance with the follow ng supplemental instructions issued in item -dance with the Contract Document, without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowlcc ;ment that there will be no change in the Contract Sum . or Contract Tittle. DESCRIPTION: Clarifcation of Elevator No. l: Back of cab wall panels finish symbolized ou each side of n :rmr shown on architectural detail C5/A'f 1 I See attached sketch: ASI01 for identifcation of finish, AIA Document G710I —1992. Copyright 919130 1980 and 1992 by The Americ Document is protected by U-S. Copyright Law and International Treaties portion of it, may result in severe civil and criminal penalties, and win be was produced by AIA software at 101826 on 03122/2004 under order No,m User Notes: n histit03 of Archheas. All rights reserved. WARNING: This AIA' Unauthorised reproduction or distribdlion of this AIA' Document, or any prosecuted to the maXimum extent possible under the taw This steamer! 9090175 2 which expires on 102005, and is not tor resale (2191232120) 1 MAR-22-2004 12s23 n 1 + was produced by AIA software at 10:1 ale on 03r22/2004 under Order No.100 090175_2 which expires on 1/2I2005, and la not foi ress la User Notes: CONS. O TRTR6JCTION.ADMIN 69.9 23f, 4 :313 ^. 1213iO4 ATTACHMENTS: (Here insert listing of documents that support description.) ASIOI.pdf ISSUED BY T ARCHITECT: (Signatu ') Lit (.01 ASt-O01 t ,s �OP_t1 t•�Y (Prin ed name and title) C.<'t xriet.I.L1,4D FI A]DMtNt S-rpL-'t'z7F';� AMDocument G710. —1992. Copyrighl tt 1980 and 1992 by Tne America institute of Architects. Al rights reserved. WARNING rt,n: AIA' Document i$ protected by U.S. Copyright Lew and International Treaties. 1nauthorized reproduction or distribution of this AIA' Document, or any 2 portion of it,nd , may result in severe civil and criminal penalties„ and will be rosecuted to the maximum extern possible under the law. 'MS :b<'ument i21t1123212A) • • •`.,r1 0-22-2004 12:24 CONSTRUCTION ADMIN 619 231 4138 P.04/04 • CA! - l!:.I I.IIJIJ1.1111 'u. 1 I,n 1, =3000000'J3I - JacGGc:.il a JO]JC:: J 00 QOC Qica r1arla: l , J,,nnv1p-TJ'7-5'. -1;Tnb I1•1,.111•1111 1y.l7' C007:]t:7CUl, 'n JO:0300: 7aa G0 u7G3C:]C:OCCO n ,vhr .I!1 '. ... ..: 030003C •loon. . :i1.— JI:IJVBUC77c0CJC]0C C�co .!UJ7:!000=]nco Occaco T300 coeooaeo7:ccoccocc 70a0o PERFORATED WOOD / AWD- oc00c0C003 C 00oc]o:]Oaca ccocaoJaaLlaC onc]a:300^.a --- 0.300303303000000303)y 3 0 oo00]c:oo:coo -,,'3 .lrocO Cor0 ra3 cr oo! .eh Coc0c3]33OCaOCCy.03:: Juu0u 0OCO]03 J]o00c0300o o a7000 pOOocooa.. etoocla00}ac00 !'10l%C':i7CC' 7co000]U= zocoo rn:.rv.• •:. ii::lln 11 rlllrr :::. 1.1 IJ 1;1 o07]73O0c000rm tun 1 .0000 70c3333303`000000]G'.a000 J 2J 0J07CCJ0o00C00a^2 ln0nn oc:OCO_c03000007033 iOGG c0]=700=UJ0ooOo 70c:a0 :o:]:oc=00000 ooaoo,o•on oca0cc 00030:7 c^ 1_=:CCOC30. 03Gnac:: - -n�ncacaC�O ec:,Ga. �clyw2uuo '•CCGOC�0G5601,-; 0,1 .�cl r_cni. ; rc nnru11 , f rna 71IC :.I i:tfl.ln:!n' . :,Inn 10'C:]COCOCOOJUu' Guu•-: .�uu ,Z:1GC000L03U0 1J I,JUJ .: uuu 7::n_C0a0C00 033303:0000 a:::ccGcoco' Coa CC]0 :700n :c:^r,:c'u000aoo :oca nn:^1-:nnnr4 nn'� rn 1J11 I: n-..I3CC0=00CC -i10U 7•'.' '• 3 3 eee=co7:0C trinnnn,�nc :cr: !:OOCCO.^.O-0 Ca0CUU70C']C3] -CCO3CCO^ CI0J000000C:730] C. BACK 1/2" BRUSHED 5.5 REVEAL. BRUSHED 5.5. HANDRAIL - 1/4" BRUSHED 5.5. BARSTO .K S.S. EASE • MOl wAlarw.ain L 0, K T)0W&. d7Y, ouraNA 000 a�dar rora CLARIFICATION (F ELEVATOR #1 CAB ELEVATIO•v NATIONAL CITY PUBLIC LIBRARY BACK ELEVATIO CITY OF NATIONAL GITY ra MO : o 4456.00 �t>=' REF open r�r 03-18-2004 C5/A7.11 I aetcn no. 1 A8101 TOTAL P.04 JAYNES COPRORATION gSTIMATE FOR CHANGE ORDER JAYNES CORP. COR LOG # 3057-005 Co 15 I CONTRACT: CONTRACT TITLE: # 3057 NATIONAL CITY PUBLIC LIBRARY CHANGE DESCRIPTION: Installation of WD-2 perforated paneling at back of Elevator #7 '.arm AVE. Delete: Add: $2,141.20 DATE: 5/26/2004 1. DIRECT LABOR HRS. 0 Supervision 0 50.00 $0.00 Project Management 0 $0.00 $0.00 Carpenter 0 $0.00 $0.00 Laborer 0 50.00 50.00 2. INDIRECT LABOR COST (Labor Burden, etc.) 3. MATERIAL 4, DIRECT EQUIPMENT 5. SALES TAX MATERIAL & EQUIPMENT COST (7.75% OF LINES 3 AND 4 If not already included Line 3) SO, So. $0 5o. 6. DIRECT WORK SUBTOTAL (LINES 1 •5) $0. SUBCONTRACTOR WORK COMPANY AMOUNT REMARKS agog Travertine Elevator Interiors $2,000.00 per AS1.001. There is no credit applicable for the "assumed- material at bid time. Mitsubishi has indicated that their pricing was a budget package assuming the standard plastic laminate finish In this location. Requesting a non-standard finish actually Increases their overall proposal because they lose their preferential package pricing. See the attached correspondence from Mitsubishi. We are in discussions with Mitsubishi on this Issue. SEE ATTACHED BREAKDOWN SUBCONTRACTOR WORK TOTAL: $2,000.00 CHANGE ORDER TOTALS T. PRIME DIRECT SUBTOTAL 8. SUBCONTRACTOR WORK TOTAL 9. COC/BUILDERS RISK INSURANCE (1% LINE 7+8) 10. GENERAL CONTRACTOR FEE (15% of LINE 7 and 5% of LINE 8) 11. GENERAL CONTRACTOR BONO (1% of LINE 7+8+9+10) 'GRAND �a. $0.00 $2,000.00 520.00 S100.00 521.20 TIME EXTENSION AND JUSTIFICATION REMARKS: NAME AND TITLE OF PREPARER: Daniel Luker, Project Manager (Jaynes Corp.) WORK DAYS ACCEPTED BY, anager (deb, in ) 0 TO: Daniel Luker Jaynes Corporation 8530 La Mesa Blvd # 306 La Mesa, Ca 91941 rr l r r[ e r S Date: Project: Location: Scope: May 20, 2004. National City Library National City, CA 1 cab interior Travertine will supply and install the following items in the above referenced location. All material will be fire rated and meet current code requirements. Quotation is based on drawings sent 5/14/04. 1. 2. Side walls to receive removable panels consisting of Wilsonart "Fusion Maple", laminate faced and edged, mounted on 3/4" fire rated board. a. Recessed reveals to be 1/2" plastic laminate (needs to be defined) Rear wall to consist of Prago perforated paneling per specification. Style to be determined. Paneling to be mounted to 1/2" fire rated board to create a total thickness of 3/4". One laminated safety mirror to be mounted vertically per drawing. Paneling to have 1/4" brushed stainless steel bar -stock inserts per drawing. Final coordination with architect required to meet "logo" design requirements. Recessed stainless steel reveals to separate mirror and panels. Raw material cost assumption is $2000.00 for Prago panels. Final style to determine final pricing. Front return panels and transom to be clad with Laminart "Metaline Astro" laminate #4 brushed stainless steel suspended ceiling with 6 low voltage halogen downlights Recessed base in #4 brushed stainless steel to surround perimeter. Rear wall to receive one 1 1/2" brushed stainless steel handrail Approval drawings and samples as requested Cab shell, COP, doors, flooring and mechanical items by others. Approximate installation time is 3 working days. a. b. c. d. 4040 e. 3. 4. 5. 6. 7. 8. 9. Total investment Deduct: Eliminate ceiling in #4 above .... 383 Diablo Road #100 Danville, Ca 94526 925.831.0535 Tel 925.831.0536 Fax 1927 South Boston Suite 207 Tulsa, OK 74119 918.583.5210 Tel 441 South Hall Dallas, TX 75226 214.358.1680 Tel 214.350.1634 Fax 5220 4`h Street #3 Irwindale, CA 91706 626,338.8830 Tel 626.338.8571 Fax 1 rlryalai, n1arinrs The proposal is based on the following conditions: 1 Term Net 30 days. 40% deposit to confirm work. Balance due upon completion of job. Late payments shall be charged at the rate of 1.5% per month. 2 This quotation is void 30 days after the above date. 3 Work performed during normal working hours. 4 Sales tax, shipping and abnormal insurance/bonding requirements not Included in above pricing Respectfully Submitted for TRAVERTINE, INC. CA State Contractors license # - 837489 Accepted: Firm Name: Date: 383 Diablo Road #100 Danville, Ca 94526 925.831.0535 Tel 925.831.0536 Fax 1927 South Boston Suite 207 Tulsa, OK 74119 918.583.5210 Tel 441 South Hall Dallas, TX 75226 214.358.1680 Tel 214.350.1634 Fax 2 By: Christine Lambert, Owner 5220 4th Street #3 Irwindale, CA 91706 626.338.8830 Tel 626.338.8571 Fax Sent Qy: AMLIFT; 8192207081; May-25-04 2:OOPM; Page 1/1 •� MITSLIB I SELECTRIC Mitsubtaht Eisctrik{k't tlitrpntos USA, Inc. Elevator & EscallRtoJ :Division 8866 Rio San DIegO,$ulte 365, San Diego, CA 92108 Tel: (619) 5414901;::fax: (619) 643-9449 Tom Birks Direrrt etl #•(858) 688.8042 MAY 252004 To: Jaynes uo fforation #: '619468-4090 . Attn: Darr Luker Date: May 25, 2004 From: Tom Birks • . Pages: CC: Subject: National.,CitY. public Library As discussed verbally, wecan .p ovide a steel shell cab, for the passenger car, ready for the custom side and rear walls to be installed by your specialty subcontractor. The shell cab will have #4 stainless doer Panels and a stainless downligbt ceiling, The cost add for this change is $8,000.00, because we lose the pre-engineered "package" status for this elevator. Please call me at 858-688-8O42 if you have any questions. i!on MAY-1.8-212804 1.7: 35 (INSTRUCT ION PON I t' _: � Document G7101M -1992 y Architect's Supplemental Instructions PROJECT (Name and address),' National City Public Library 1401 National City Blvd. National City CA 91950 OWIIIERTName aid address): CITY OF NATIONAL -CITY 1243 National City B'1vd, National City CA 91950 • FROM ARCHITECT (Name and address:): Carrier Johnson 1301 Third Avenue San Dicgo CA 92101 S.".. 223". 41.3t ". azvErf OIN'NIEll X ARCHITECT X CONSULTANT CONTRACTOR X fIEIUD X CTHI3R ARCHITECT'S SUPPLEMENTAL INSTRUCTION NO: 004 DATE OF ISSUANCE: May 14, 2004 CONTRACT FOR: General Corsthuction CONTRACT DATE: TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUME Eli: 4485.01 The Work Sha11 be carried out in accordance i'yith the f>llowing supplemental instructions issued lin nix' arch nee with the Contract Documents without change ill Contract :Sum or Contract Time. Proceeding with thc'1'/ork in accordance with these instrutxiio!ns indicates your ack.iii w1cdgrnent that there will be no change in the. Contnicl autn or Contract Time. DESCRIPTION: See attached revision to 18/S5.01 ATTACHMENTS: (Here insert listing of documents that supportdritcripriurr.) Dwg No, ASI 004-A, dated 5/7C2004 ISSUED BY THE CHITECT: e,�/. . %ov (Signature) 7i ,(;\re- N C. Ct,t L-s_ (Print rate and girt ) A1w aoottmont G710r■ —1992. Copyright iD 1080 and 1892 by The Arkncen Institute of Architects, All rfyhtit reserved.. VVAFININit The AIAa ooaumcrn is protected by 1J.S Copyright ILow end'. tntemallOnef vows. Unvutharlxee roproducllon or distribution al this AIA lesianent, of an) portion of It, mey result in severe civil and csimine/ pe11vIU!4rs, and will be prosacutad to the maximum extent posoibie under the Isom, This docr!ma14 was produced by AIA software at 00d0:10 on O6J17/2004 !under Orde No.1000090176_2 which expires on 1/212005, and is run for meek/ User Notes: (324641625 I1 1 • MAY-18-2034 17:36 CONSTRUCTION ADMDN 619 231 4138 '`r12.013iO3'` SKEWED BEAM CONNECTION SCHEDULE "E" BEAM SIZE r0. deSILE 0 REO•D BOLTS PLATE THICKNESS WELD FOR 0'< p <10• WELO FOR 10'<p <30' W8 (2) Wm 3/e" \ s W10 (2) 7/e"0 3/8.. Wit (3) We /e" W14 (3) 7/e'e 3/e" W16 (4) 1/e w Vs' 1 •D S+ /e w 18 (4) 7/e"e 3/e' s+ Y 6' V PLATE PER "TYPICAL BOLTED BEAM CONN. DETAIL" t- FILLET WELD SIZE S = PLATE THICKNESS. 2. FOR BEVEL WELDS. BEVEL ENO OF CONNECTION PLATE TO MAINTAIN cx AT 45'. 3. 00 NOT INCREASE DIMENSION'A' WITHOUT ENGINEER'S APPROVAL 4. FOR SKEW ANGLES: 0'< A<60' SKED $EAM COLCT{ON NO SCALE FROM: S5.O, JOB NO. 103004 fCc surriN ENeem 3131 Camino Dv Rio WM.. Suite 1D80 SQn mega Celirdnia 92109 +1/7 '-6/N fcx (DIVI 521-8591 NATIONAL CITY LIBRARY DATE 05/07/04 DWG. NO Q SIr 2 .4. TOTAL P.03 CONTRACT: 0 3057 JAYNES COPRORATION ESTIMATE FOR CHANGE ORDER ,IAYNES CORP. COR LOG S 3057-010R1 CONTRACT TITLES NATIONAL CITY PUOLIC LIBRARY DATE: 6/20/2004 sqr CHANGE DESCRIPTION: Skewed beam connection ?Per AS1.004 Delete: Add: $4,878.30 1. DIRECT LABOR HRS. $0. Supervision O $0.00 •0.00 Project Management O $0.00 $0.00 Carpenter Laborer 2. INDIRECT LABOR COST (Labor Burden, etc.) 3. MATERIAL 4. DIRECT EQUIPMENT O $0.00 $00.00 o $0.00 $0.00 5. SALES TAX MATERIAL 6 EQUIPMENT COST (7.75% OF LINES 3 AND 4 If not already included Line 3) 6. DIRECT WORK SUBTOTAL (LINES 1 - S) so.otr" SUBCONTRACTOR WORK COMPANY AMOUNT REMARKS Pacific Coast Iron $4,600.00 for ASI 04 REVISED PER FIELD AGREEMENT ON 8/20/2004 SUBCONTRACTOR WORK TOTAL: $4,600.00 CHANGE ORDER TOTALS 7. PRIME DIRECT SUBTOTAL 8. SUBCONTRACTOR WORK TOTAL 9. COC/BUILDERS RISK INSURANCE (0% LINE 7+8) 10. GENERAL CONTRACTOR FEE (15% of UNE 7 and 5% of LINE 8) 11. GENERAL CONTRACTOR BOND (1% of LINE 7+8+9+10) GRAND TOTAL TIME EXTENSION AND JUSTIFICATION REMARKS: NAME AND TITLE OF,PREPARER: Daniel Luker, Project Manager (Jaynes Corp.) $0.00 $4,600.00 $0.00 $230.00 $48.30 ;4,878.30 WORK DAYS ACCEPTED BY: frt..../ Mart' G y, Construe „ (deb, inc.) `,/ PACIFIC COAST IRON 9038 JAMACHA ROAD SPRING VALLEY, CA 91977 619-461-9800 May 27, 2004 Jaynes Corporation 8530 La Mesa Blvd La Mesa, Ca 91941 Attn: Daniel Luker Re: National City Library Subject: Change Order Request #409-002 Gentlemen: Please find listed below a description of the design changes, which were directed in ASI 004. C1_331.1 e the edge distance of the_holes in the connection 1?1ates, which in turn changed the hole gage on the beams. (The documentationfrom the detailer is included) " Detailing=130-hr 15% MIU= $4,170 0 Total,$ yG QV Total change order amount requested: S incerely, Pacific Coast Iron Bill Burton '•� 1 . : ,,'•! CHANGE ORDER REPORT Document Code • CO4520O4.PCI Project(: National City Public Library Project Na: 0400 Papa 1 of .wits Client: Paden Coast Iron '"a'" " PCI 400-XX (A911004- Rah. detail 18/55.01 fof skewed beam Connection) uocum.M: Menton Chows DaaerlpaetY Remarks Hour. Type Egli f s 3 v x 5 k; a S $y 2 %; yy i • e L E yl a i ' i 4 l is 1 Z' 1" 4. 9a 2 = 8` m j[ 1 1 i 1 r 1 1 p A C .1 '7{�1 Pt 1 •More.enrk g B$ ! 1 p i m S g 3 O 1 1101A 1 X X Modlr distance Sun lwrkpdnt to the pate NM bow bM 16'5101) 0.75 2 1162. 1 X X `Mv a49no Iran work pow b the plataJYl. (nnvbut 16155.011 0.75 3 1011A 1 X X chance !y.0'.nwont phmlb Mn- t. bola (n.w bW 1e55.01 0.76 1 10036 1 X IL. octane. root wok pant b lha• .6 holo plow dvle7105001 0.75 5 1146A 1 X X M4661y elation foe hat on boam(naw• WWNS6.01) 1.25 6 1149A 1 X X k100X7_knlan 5)r ne10m1 beam. (new s5505 55.011 1.26 7 11056 1 X X IM d.Yne boo want mint b!M ala0lld.(nar deY010(55A11 0.75 ( jQ[i©rI���l♦� ��.m����� ���� 0 Ira �o) beenwortpante the Mike lok(new Sauk 1655.011 0.76 O Yvm44t2I!05 OoY5 6.01) 1.25 10 10510 / X X Modify bc.0155 hole on beamhnw dui 115A11 1.26 11 1114iAA 1 - X X Modes &woo. from work part Y the plate W. mow dek01655.01) 0.75 11 4617A 1 X X 0670y asWagem worn 5M5 to 1166ptate Mk blow d.la116156.01) 0.75 13 11216 1 X X *ScotyduYnm tan weak pant to Pe pelt 116161nw404016/55.01/ 0.7j 14 IIIIIICIEINIIII4sf3lEINeCIIIIl• 16 1110A 10769 1 1 X X X 130017ydl6Yne..Gam wen pant btha*to hd. kw/ btad 1M95.01) 0.76 x Mad fyry 061.nce then wont took( to 01a 111ttehd6 (nondw01656.01) 0.75 X Mm#fy location lot hot on beam./non deka 1655�.01 1.25 17 2076A X X moat,l0e.00n Mrlal. tn..oslto,w dotal 1055.OS) 1.35 16 20476 1 X X Mod4yloc0on (wholeen boon. Inert data 1655.01) 125 19 2062A 1 X X Stony bea60nb 6o% en Now. (raw deter) 1656.Q 1.25 20 20396 1 % X roman fc,hek an tom new d /05601 1.25 '.en1• Yea I050A irO ■ % _ M• teeaavn tar hob an beam. 6 cot) 1,Xs 20�t �• L �� IS � a. 11 (y known or tool gnaw pa9at 663S011 1.26 23 10358 1 X X Mordly botanic, lak an team. (new del Of 1035.01) 1.26 - 24 20274 1 X X Motley d.Ytc. Mr workan(Y_016 Noah * 1905.001091936.61) 0.75 25 20756 1 X X Modikletalonke Ml. en 0o0n n6Wt(e5(11685.01) 1.21 26 2965A 1 X X Madlykes50n for dell on teem. {_iYwdelloll 0665591) 1.25 27 2/2aA 1 X X MMOy loca0snfar tots onbo.en.( 5) l�l 6lS5.011 1.25 Note: In docvnnm AS0004, tow d.t06 (i61S5.0/) los Skex.d 9.am Conn.clbn Ines bon pto+lda0. AOaehed Doeuu.ats: I A6Om+t: Dal.: Da>letla. __E6y60n II:0 PkOard by ICY IApprovedby= 60 LDetn 05/26114 ook.00NyyM. Project National City Publk Library Project Nk 0409 Cheat Pacific Coast Iron CHANGE ORDER REPORT ChMw. burn PC1409-XX(A514004—Now detail 11/15.01 for skewed beam eonnsction) Damman0: M.mbers Y .4 waaemM, 28 21274 1 29 21265 1 30 11146 1 31 2110A 1 32 20324 1 33 20216 1 34 20320 1 35 2032A 1 36 2111A 1 37 2122A 1 38 29424 1 39 25WC 11 40 21910 1 41 21524 1 42 2155 1 48 21204 1 44 2121A 1 d6 2 I224, 1 46 21114 1 47 2/414 1 48 71046 1 43 2163A 1 50 1052A 1 51 21414 1 52 20404 1 53 1001C 1 54 20524 1 T i m IX Ix IX x X x x x )0 X X x x x x x x x X x x loscub m=1 ram: CO-052604-PCI Paps 2 0( 5 F m Gmog. 0.ecdpnon4 -- t ga 1 S 1 1_ s e n di 1•F l 3 o 8 8 s�$ i i 1 1 s i i i i i i g Nye! x x X X x x x x x x x x x x x X x R.m.rko Modify baaUai for hole on beam. ken 44b5105531) Moder boeon for tole on boom (net CEO 1655012 Morley bc.rfon for Iota on boom (new MAO 10/95.01) Motley bonbon fao hole an beam. blew def010555.01) MOMyrbcrCyn for hole an beam. iron daY01 1.25 bunion MFF.Mm wdeYn boom. no10456.01 1.5 M •.:. . atoll Car holy on boom (nun Mao 1. 5.01 1.�45 Modfyaclatce hm enomppo.t to l:e_pY1. halo ((nmodem11e/5501) ohs ko ky dlbnce hum work Root to Om pnu hole (now delta 10155.01) Ml.btydatawce from nark boar((5 map ate hpl OP1wrdam 1055.433 0.75 Mcd2Vds(o.ca nom we* Pont to Ora pleb bole (nm0d.Y0101950T 0.75 0.75 - .1od0y deinn. Gam wok joint to Ike plate boo. Owrkka o55.01) Moth, ddncc Gom nark to kg Mato hob, aura (Wail 98/5501 0.7nark m Modfy Iecalon(or hole on bum (new dotal 11056.01) ) 125— 1.25 25 Modify d4emca dam worn Day to mai/Iota hale low Moll 10/S5011 0.25 Mucky dMam. boom worn pent le Me Mak bolo new *WI 10/S3A1) 0.15 Malty obYws ham work port to the e)Mo hole now 64W/6/53.01) 0.(5 Wally dWnna hem want pent 1051n 5Nde hr4 625 Lmw doles 10/56.01J nay Macttylocoarmla nob an boom now deYl 0/SSgtI) Madtylocaaon kr hole on bawrk Merida 1 COI/ 15 MarMykrationb Me en bream (mwdel,101 .1g) 125 MadlY�aalan W tale on O.4m.Itb1y00Y119.55.1 1]5 Hours M909 kcalon tor nun an 004m(rem dent 10/55.01 mud ik bcMbn rat hole on beam. tmw do 1 455. MaSfy loen5n ter had Tatum. (saw 11010/56.01) 1454127 baa0an for hula m boon. (net debt 1NS529 Marry brnion to hot on beats. (new tbb118155.01) 1.23 1.25 1.25 1.25 925 125 1.25 In document 4814104, new demo (1058.01) Tor Sk.w.d 8e..m Connection hews inn p09/idee. A1meh.d 0000nenl; Apotya: Daly, Propuod by: JCV I400ra9e1 by: Xo Oesa56arb (C.C.: 1041c 55r26m4 J IIlk/Minn 9:0 -`�- "'"r'"r'eia'"'^ CHANGE ORDER REPORT Omamwni .ndo CO.052604PCI Project: National Ctty Public Library Project le: 0409 Pape 3 of 5 Client Pacific Coast Iron pas sum' PCI 40970( (ASI 0004- New dotal] 16/55.01 for skewed beam connection) �, /Ambers Two 5 7 >t' >f e S C e` f gg v d Chao. a �• i# Owenplbm ; 2^ w ''� S S W g e i c N ` Y q.meka Hours PlaawMM a 2 1 S 55 2029A 1 X X Moldy dk+ancs Ram wank pen Y ion oats bap bew UW.411319541) 0.75 50 2047C 1 X X Mkbadd71ytboll. far nalo en beam. tnawdeb41d$4011 1.25 57 2077C 1 X X Madfr on fa hole anbe.m.(n.wdebm716735911 1.25 SG 2047A 1 X X, M0729bbbO o I.1le on beam.(bewO.l.414ES011 US 50 20530 1 X X Hoes Offencefrcmwo7b postlo Me 0 Ic hot. Hew dn7el 1993.011 0.75 60 20970 1 X % Modify location tarhd.on beam. In.Wdobd11575141) 1.75 61 2105A 1 X X Modify Oe.nes horn wont pans us ma Halonobjnaw dealt 10756.01) 0.75 62 2130C 1 X % Ma 6m0}y Mallon tahele an beam.(new dolma 10/56.011 1.25 53 2149A 1 X X Madh bunion far hole onb.am.lnr.71.51a65.o1) 1.25 64 2146A 1 X X Madlyly5 a60n Tangle an .Wn,lp9rg1Agl i1XX501) 1.13 66 2144A 1 x _ X Molama. for (pw r hole baam.deY41012640 6ry 12S 66 20476 1 X X Morley ammo hail work pobtlums .1A w1 Orewdets110/5aw.alf 0.75 67 2121C f .X X _ Modlrbadan tar nos en been lnsr doled 10155.013 - 1.25 60 21239 1 X X t MOdN lavabo° tarhw an bsam.fbew detail 18755.01J 1.23 69 20346 1 X % klad(yboeon falOY an bsom.(rwr4sts416153.011 1.25 70 11030A 1 X % klddyyga00n bf hub on beam. Inert 0elaq 125 71 2055A 1 x % t6.150 k1o��Yaw°rahwrk be.m.tn.Jengols 1.25 72 2096A 1 X x M006ydelna hen stork pant b ms�Hsu A0.lew d.ad 1035.w) Inns 0.73 74 2009A 1 X X lied from stork pant Ym HsuG40le hd. Ore dab. 10755.011 0.75 74 sInsma M5dW5 vha°wak boon. lew (nHs 1053.01) 1.25 73 207739 1 % X M0df5 .0fr hob onbe 0.1+1161 1615 ..0I) i) 1.25 76 2004A 1 X X . Mo5Oy6.Yw. tom work poet le the lbY�� 1Mw deaa 110S5.01) t62t . Nellie 0.75 77 2012A 1 X % kktlh76s)rra eon 9I0Y 1e16541 0.75 70 X tomrarkpdmtto 9049( * d9fa*e Modify dabna tom warkpoidaew pMs hale Nwr dsQ iM55.01 O.TS la 21411t 1 X Moats dspL7GeSdmwont paMlm6wpMehole mew /aa16935.Op 0.75 60 2127A 1 x X I'd,l drstxra rn=polo wai Y ands (newa.Ys /075:5.05) 0.75 et 3120A 1 % 2 000, 000010 MG7d3M°ae 1mm workyObe a m1 pale We Merl deli 16035.01/ 0.71 Nab: In da.mwnl ASI11204, new dell casscai) far Mason 0..m Camseden haw be.n 070710e9 /cached Ooa..00M. Approve: OeY: Desalpbart fastscl s:a j IPr.Opodbvl JCV I Approved 94, 1_ 60 ____. ___. _. I1.o: IOW. Osnslea 1 Protect National Cl y Public library Project N•: 0409 Client: Pacific Coast Iron CHANGE ORDER REPORT Change wPCI 409-XX (ASI 5004—New detail t8lS5.01 for skewed beam connection) Member. Chanty ' es PUOM 31.Panafa 0 8 w ^ 5 v i 3 1 a F I a A- i 3 a a££ F .33 e 9 Doenm- °^--- I ire CO-052604•PC( Page 4 of 5 1 F a 3 M 1 Remarks Hours a1•/�eLL1H.`�©�a.■.'iH{�■i■....�111M11�. MaGlryaAtnnw wvk3o ionic sntc Mk1now Muil15.153oQ e�e■��.._.1�......■S..■..® work owmbmv Pk,<bYlrpw �R1 la/5301) ttm �' 01E11:1111NIIIIIIRIE:11111511111111111111111M 131111111111111•11111•1111•1111111NOMIR OM Mall rtm��-----�� M 1.lmwhamPMa arc{now dart 1045'r tt17�Clitt���t�� ���6tf•M 4hlannDowork ueie a �I m�l�� MMMMM��• be.UonfAdeanWam. new tleWITL bilers&OilMEM tocalion tor on edam Mandel 141.455.01 Q��r��F3��/i•��� salt n ter mbeam, mwncm410IS501 Molds ••• lane, from work PORtl 10 Me oke hob new dma11eI55.01 Modrl dapnee aom ors ._._ aobna/emawa.ba1of55d1 51.1151.5.11511111115•111111111Mr ixeue1 koe tit® 675 EZ111111FONIIIRINIMINNININHEIIIIILIM11111111111MIIRMIIIMIIIIINIMOMIIIRMINIRMIIIIII loc;iioe lei en Oman newt* ters0.01 II 1111111111111111111111.1111101111111111111M111111111IM BiHIIIIIIII�®��IIHIIIIIH���III� .n for nise on Dean. de S lion on OHM WS m1C♦�.�n®©IIHNIEDMINIMINER�iii�1ei ��(♦ ;:. IPtMion tor Oda an Warms 6L d�C/��1♦�� ������IUM11.11•M�MI� Ier hole on on le am. Ore aMd i3/35 MI INFIRM �... .... 7•�...... .., conhrhNasabc.en nrwdeMalaSs.• t���� IIIMI •t��l♦�t(tNNI t�tNI�tt�t�������iitiiL'S:`Ie^_+a .. now on bo Weir newdsbA teadet �Ei�nRl�����©��_MM���-�/---_- �6.n` mxenka.m R»wawx 1ass.ol to. 30508 X.■■■`8��..�....■1�.� een kern. ow ,W0 6SS.p1 ktrjavd toltglo Pn fetm. MwdNa� - .011 to: 1019A t z ��--------- --- ". ., on r, obi <am. {newd.raa 18450 • l .i.�..r'nbr lick on mini. ma Mb 1 Nat.:. I In doanMM ASuco., nor data 4141/56A1 for Sawed Sawn 1 Connection tare heart Pmwdetl. Attached aowan.Ma: Mod Renton not on kern. new debna 1015401 Ammons: Dam: Preper.d ire JCV j Anmwedby: SC DoeRViieni I QC.: 1 Recision a:0 Watts 4672e404 I .'•, . ..,..- .a. • CHANGE ORDER REPORT Doojment Code CO.052604-0CI Project: National City nubile Library Project Nm: 0409 - Page 5 of 0 Chant: Pacific Coast Iron C mwl Snpv PCI 409•XX (ASI X004—New detail 181S3A1 for akawed beam connection) Oamlmenb.. Men ben Cwns• •se dpliens Hours w Piepemara - i s 9 s a H a 2 ! 2 3 1 }• £y_£ 1 ` m "X �i _• i= 9 'X J v �a LI m i a} itRemarks = ,� € i m • y 8 CY g C toe 1044C t X x Malty twaaoll foe hole on bmam(na.e deem ta/sSJll) A.20 1.25 Itc 5.e51A 1 X X Moanybolbn ter hole mbeem. (new dual 16/05011 111 5.5505 1 X X farmum. 125 125 112 5002A 1 X X Meaty lomkan/whole on teem. (lsw dph11 tw55.01) 115 0021A 1 X X huffy teem fwlde m beam.( newdo1•11e/5504 125 1M 200IA 1 X X FuaXy baa ecn form r Mk Imam,(rcw *Est 16/55.09 1,25 In 0003A 1 X X AUNy bceaon(whw m bnam. Mow dnlea 10.55.012 11.25 1b 3000A 1 X X 2.1ad(M• beaten for hole en Mem(mM detail 12S5.012 1,25 In 2022A 1 X X Ratty Rankin far hale m teem.(ntwdalek 1f55.012 1,25 111 SOMA 1 X X Mwfhbeaaon191001 mboem,.hiwyjoY01a155.01) 125 ne Mate 1 X X Mathkeedoo far hole m Mem(mY(Mad70/52.01) 125 CM 2061A 1 X X Madayinckton MOM. mMmm.lnmwdclai16S5.01) 1.15 121 122 123 12. 12S _ -. 120 Nob: n ducem•nlA511004, on *MI (161S6.01) fw 0 o.d Oeen Commolian hero been wovekd. missies Dammed. Appme Oaten Oaaaittorc R•vwmna:0 Pt5OaredW JCV I Aparovmdbyl 6C 14.C.: 1 Dole: 05/26ro4 DocumentI4AJAt4- G710 1992 Architect's Supplemental Instructions PROJECT (Name and address): National City Public Library 1401 National City Blvd. National City CA 91950 OWNER(Name and address); CITY OF NATIONAL CITY 1243 National City Blvd. National City CA 91950 FROM ARCHITECT (Name and address): Carrier Johnion 1301 Third Avenue SanDiego CA 92101 OWNER ARCHITECT CONSULTANT CONTRACTOR FIELD OTHER ARCHITECT'S SUPPLEMENTAL INSTRUCTION NO: 007 DATE OF ISSUANCE: June 08, 2004 CONTRACT FOR: General Construction CONTRACT DATE: TO CONTRACTOR (Name and address): ARCHITECTS PROJECT NUMBER: 4486.01 X X X X The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum •or Contract Time. DESCRIPTION: Clarification of high roof steel framing and Revised alignment of high parapet per attached stretches. ATTACHMENTS: (Here insert listing of documents that support de.Tcription.) Nine 8.5" x 11"'•sketches numbered AS1 007-SKI through AS1007.SK9. ISSUED BY THE ARCHITECT: 6145210C L L)-11/4•1 Crrtrztna/OP o - .) (Signature) (Printed name and title) �dy AIA Document G710Te —1992 Copyright ® 1980 and 1992 by The A4nwican Institute of Architects. All rights reserved. WARNING: This AIA° Document Is protected by U.S. Copyright Law and international Treaties. Unauthorized...production et distribution of this AIA° Document, or any portion of Ir, retry result In severe civil end criminal penalties, and will be prosecuted to the masimum ardent podadbfa under the taw. Thus dam/mini was gnawed by AIA software at telas:14 on oexte 2004 under Order No.1020107577 4 which expires on 323/2005. and Is not for resale.. User Notes: (6739158151 FROM: 52.04 END C'onauffing Engineers 3131 Camino Del Rio Norin Suite 1060 San Oiega California 92108 (619) 52(-8500 Fax (519) 521-659t NATIONAL CITY LIBRARY 103004 DATE 05-21-04 DWG. NO. ASI Otil•S14 2-0041 1,1 3 SIDS OF\ VERT LEG/ COLUMN PER PLAN PLAN 1/4 V L4x4x3/g --T 2) 374•e 8 TbL S L6x4x3/x0.-3" \N"--HSS9x6 �H$S3x3 BRACE (CONNECT TO COLUMN _ PER 20/S5.05) T.O.S. CI 38'--0" r__ ELEVATION V I—_ v4 V (rjHss CONNECTION FOR GLASS SUPPORT * WF COLUMN FROM: S5_06 10B NO. 103004 Consulting Engineers 3a: Camino Del Rio Nora. Suite tOBO San Diego. California 9218 t619i 52t-6500 Fax i59) 521-8591 NATIONAL CITY LIBRARY DATE 05-21-04 DIM. NO. COLUMN PER PLAN L6x4x 3/8x0'-3" 1/4 PLAN 1/4 L4x4x 3/g HSS9 x6 HSS3x3 BRACE NOTE: SEE 3/— FOR INFO NOT SHOWN NSS CONNECTION FOR GLASS SUPPORT • WF COLUMN F'.ROM:: S5, 06 JOB NO. 103004 ragConsultirp Erglneers Jr3u Camino Oct Mc, North. Suite 10&I viand Oiegat California 9206 119i' 5214500 Fax 16191 521-8591 NATIONAL CITY LIBRARY DATE 05-21-04 DWC. NO. �51 001 • ski 6-8-2.cf _I1711111 (2) 3/4"0 BOLTS 3/13" KNIFE fE PLAN ELEVATION /4 —COLUMN PO PLAN 0 HSS9x6 10"x7"x 3/84 CAP A'_ T.O.S. BOLT ACCESS HOLES (AS REQ'O) CR)HSS'j •CONNECTION FOR GLASS SUPPORT 0 HSS COLUMN FROM: S5.06 JOB. NO. 103004 CooSulting Engineers 3qc Camino Oe) R o Noltat Suite *au San Ofego. California 92*8 (619J 521-6500 Fax (6E)) 521-8591 NATIONAL CITY LIBRARY DATE 05-21-04 .DWG. NO. A -St 00.Sx1( HSS3x3 BRACE CONNECT PER 18/S5.05 (2) 3/4" THRU BOLTS -HSS3x3 BRACE (DEMOUNTABLE) PLAN ®11§SS CONNECTION FOR GLASS SUPPORT DEMOUNTABLE BRACE '" FROM: S5.06 • Consulting Engineers 3131 Camino Del Rio North. Suite MO San Diego, Gal)romia 92108 (6191 521-8500 Fax (619) 521-8591 NATIONAL CITY LIBRARY JOB NO. 103004 DATE 06-21-04 DWG. NO. — 6- Zoo 1 L ® DRAIN TROUGH \ T.O,S. = 23' LOW POIN KRalit S2.04 J0B NO. 103004 • oonsurdng Engineers 30 Camka Del Rio Wet &ice MO San Olega Ca'IR O 92108 t519V 521-85500 Fax 43191521-8591 NATIONAL CITY LIBRARY DATE 05-24-04 DWG. NO. S t col'(o , W.P. — �11 2'-0" ROOF SLOPE / VARIES_: , 1111141111111MATCH {C SIZE TO ....�,__ 1/4 r BEAM FLANGE (GR-50) W14 PER PLAN FOR SUOPORT 0 CONN. PER 4/S5.01 DRAIN THROUGH SEE 12/S5.05 FOR 10" BEAM BEAM TO GIRDER CONNECTION • DRAIN THROUGH 1 "-1'--0" FE0M.' 35.06 JOB NO. 103004 MIL" 0:21Stilting oat b 3131 Camino Dal Rio NorUi. Sara 080 San D(ega Ce8(orrda 9208 OW 521-8500 Fax (619) 521-8691 NATIONAL CITY LIBRARY DATE 08-24-04 WO. NO. Asf 007 )(7 to-S' 2604i A204-HIGH ROOF PLAN SCALE: 1 /1 6"= 1 '-0" IVIRMOUIVI wircripm 18Av/Ytfl1 /Aanllm•m NATIONAL art Pueuc.ue r OM* NATION�A art IM7 stoixt 4K arerop 1A ROM: !;I OD 7 ..Sk P, rp-S- to // OA1E. 6/2/04 TT'd 10101 A203-LOW ROOF PLAN SCALE: 1 /16"=1'-0" A l 007- cio PROJECT NO. 4486-00 AICHMWS INNAORonor MMMMG , vnto�v= mm 16NfINt413 w R1lit {IIl NATIONAL CRY PUBLIC LIBRARY CITY. OF.NATIONAL CRY *WOK wi arc ammo ma FROM: GATE: 6/2/04 •AIA Document G710" -1992 Architect's Supplemental Instructions PROJECT (Name and address): National City:Public Library 1401 •National city Blvd. National City CA 91950 OWNER (Native and addres): CITY OF NATIONAL.CITY 1243" National City Blvd. National City CA 91950 " FROM ARCHITECT Maine-andaddress): Carrier Johnson 1301 Third Avenue San Diego CA 92101 TO CONTRACTOR (None and address): Taynes Corporation General Contractors 8530 La Mesa Blvd. Suite 306 La Mesa, CA 91941 OWNER ARCHITECT CONSULTANT CONTRACTOR FIELD OTHER ARCHITECT'S SUPPLEMENTAL INSTRUCTION NO: 007.1 OATE OF ISSUANCE: August 03, 2004 CONTRACT FOR: General Construction CONTRACT DATE: ARCHITECT'S PROJECT NUMBER: 4486.01 x X X X The Work -shall be carried out in accordance with the following suppletnentai instructions issued is accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these insttuc ions:indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time. • DESCRIPTION: See attached Architectural clarification to Detail 6/A8.04 ATTACHMENTS: (Here insert listing o f documents that support description.) AS1007.ISKI, dated 7/28/2004 . ISSUED BYTHE•A �r 2 2,04511 l5igrtaruri') (Print dtirte)6?", AIA Document G711A92. copyright lb odd and 1992 by The American Minnow vl Arditeat6. AN rights reserved. WARNING: This monAIAs Doeut Is protected by U.S. Copyright taw and latematiount Treaties. Unauthorised reproduC6of or 1RSpiburtian of this AIA' Document, Of any portion t (R may result in severe etre nod criminal penalpes. end MR tie prosecuted to the mulmum extent possible under nit taw. This document was produced by AIA ardente at 161410 on 06r03r2004 undid Oldtx No.10001075T1_4 which expires on 312312005, and is not far reset,. tiler Noiea. (21103900157) SEALANT a BACKER ROD ON BOTH SIDE 1S PER STRUCTURAL CALL. 2" X 2" X135 LOCK CRIMP WIRE Clan, W/ 1" u-EOC1NG O PEMNEIER CALM_ 2" X 2" X 3/15" CONT. ANGLE W/ 1/4" SPACERS v. TS POST WELDED TO SIRUCMR2E BELOW - SEE STRUM MAIM PLAN FOR LOCATIONS 19QTE: SEE STRUCT. DET. li" IVSS.05 1141 TIE MESH SUPPORT rSCJV:'f 1 1/2" : 1'-0" 06/An.04 AeO4t4 'W A2A6 PoR VOWS I `SCREEN WALL SECTION • EAST WING (PARTIAL) 91®� SCALE: 3/8"=1 ' —0" INNINKItNCIN MINING An,ai^'am AMUR NATIONAL cflY kaLla l9RAHY C71YCF.NA71OKAL cir CAW. MIL. BRACING O 4'-0" O.C. NOTE: MONO AT GLAZING BY MANUF, DECK DRAIN PROJECT NO. 4486-01 D4/A3.25 45j oo7.I ski DATE: 7/28/04 TOTAL P.09 110 GONTRACT: *t 3057 JAYNES COPRORATION PS'TIMATE FOR CHANG! ORDER ,JAYNES CORP. COR LOG # 3057-009R1 CONTRACT TITLE: NATIONAL CITY PUBLIC LIBRARY DATE: 8/20/2004 GRANGE DESCRIPTION: Roof Steel Framing per A51.007 Dolotes Add: 44,770.13 1. DIRECT LABOR HRS. Supervision 0 50.00 50.00 Project Management 0 ;0.00 80.00 ^. Carpenter 0 50.00 80.00 Laborer 0 50.00 S0.00 2. INDIRECT LABOR COST (Labor Burden, etc.) S0 3. MATERIAL SO SOJ]('+s S. SALES TAX MATERIAL & EQUIPMENT COST (7.75% OF LINES 3 AND 4 If not already Included Line 3) SO. 4. DIRECT EQUIPMENT 6. DIRECT WORK SUBTOTAL (LINES 1 - 5) $0.00;5 SUBCONTRACTOR WORK COMPANY AMOUNT REMARKS Pacific Coast iron REVISED PER FIELD AGREEMENT 8/20/2004 54,498.00 for AS1 #7 SUBCONTRACTOR WORK TOTAL: $4,498.00 CHANGE ORDER TOTALS 7. PRIME DIRECT SUBTOTAL 8. SUBCONTRACTOR WORK TOTAL 9. COC/BUILDERS RISK INSURANCE (0% LINE 7+8) 10. GENERAL CONTRACTOR FEE (15% of LINE 7 and 5% of LINE 8) 11. GENERAL CONTRACTOR BOND (1% of LINE 7+8+9+10) GRAND TOTAL TIME EXTENSION AND JUSTIFICATION REMARKS: WORK DAYS 50.00 54,498.00 S0.00 S224.90 547.23 ;4,770.13 NAME AND TIT F PREPARER: Daniel Luker, Project Manager (Jaynes Corp.) ACCEPT! ey, Construct (deirAi5) er (deb, inc.) PACIFIC COAST IRON 9038 JAMACHA ROAD SPRING VALLEY, CA 91977 619-461-9800 June 15,2004 Jaynes Corporation 8530 La Mesa Blvd La Mesa, Ca 91941 Attn: Daniel Luker Re: National City Library Subject: Change Order Request ASI #007 Gentlemen: Please find listed below a description of the design changes, which were made on ASI #007 (sketches ASI 007-SKI-ASI 007-SK9). 1: Change connection of 6x6 TS from welded to a bolted connecti::In (7 locations). Increases shop hours. - Material = $18.00 Shop hrs.=360.00 (7 I:u•+:;; 15% M/U= $ 68.O0 Total= $446.00 2: Notch beams per ASI 007-SK7 (14 locations) Material= $325.00 Shop labor= $2,520.00 dl":a hrs) 15% M/U= $427.00 Total= $3,272.00 3: Detailing charges for ASI 007 OO 25.5 hrs .75.E I ' Sincerely, Pacific Coast Iron Bill Burton Total change order amount requested: $•5�,248:00-- IT ig,, le,icl'li IHIV'" III III ilw JUJN-08-2004 17:14 CONSTRUCTION ADM IN 619 231 4138 ?'LP.02433 Document G710 -1992 Architect's Supplemental Instructions PROJECT (Name and address): National City. Public Library 1401 National City Blvd. National City CA 91950 OWNER (Name and addros): CITY OFNATIONAL CITY 124.3 National City Blvd, National City CA 91950 FROM ARCHITECT (Name and address): Carrier Johnson 1301 Third Avenue San Diego CA 92101 OWNER . ARCHITECT CONSULTANT CONTRACTOR FIELD OTHER ARCHITECT'S SUPPLEMENTAL INSTRUCTION NO: 009 DATE OF ISSUANCE: June 08, 2004 CONTRACT FOR: General Construction CONTRACT DATE: TO CONTRACTOR (Name and address): ARCHITECT'S PROJECT NUMBER: 4486,01 X X X X The Work shall be carried out in. accordance with the following supplemental instructions issued ill accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will be no change in the Contract Sum or Contract Time. DESCRIPTION: Install Slab On Grade reinfotcing at Walker Duct per the attached KPFF detail ATTACHMENTS: (Here insert listing of documents drat support description.) ASI 009-SKI ISSUED BY THE ARCHITECT: '(Signaler 6."e.40P1 4-. 1JV C 4. Mr"--` --' (Printed name and Titlf ALA Document G7107e -1992. Copyright C 1980 and 1992 by The American Institute of Architects. All rights reserved. WARNING: This AIAe Document Is protected by U.S, Copyright Law and InternatiOn,L Treaties. Unauthorized reproduction or distribution 01 this AIAe Dotumon6 Or any portion of it, may result in Solicit tied end criminal penalties, end will be prosecuted to the mAXlnlunl extent possible under the law. This document was produced by AtA software at 16:36:57 on 0610512004 under Order No.1000107577 4 which expires on 3/2312005, and Is not for resale. User Notes: tleooT17oe) 1 • .T014-09-20.04. 17:14 CONSTRUCT,rOhl ADMIT, 619 23?. N. NNN.NNININN 0.71/103 cc w 0. fo W1LKIE;Ft DUCT (PIEIR ELECTRICAL E5AA!rwING!) .M. ..... 04018" 24�A'r 2,4. �///~ nrmarai.=1rrr.:'e— . 1 —0. �__I 1 '. EII M SLAB ON GRACE DETAIL @ WALKEI PROM S4.02 .91:3l Cerrito, Del Ri'o Wel Suite *x San 10d'epa Oenrarra 9208 mei 5ehs500 ' r (619) 8E1-8Sef NATIONAL CITY LIBRARY DUCT -`Jo2'�P JAO. Dr:. JVO. 1jc .6 c t s ( TOTAL P. EI:3 -ONTRACT: 3057 JAYNES COPRORATION ESTIMATE FOR CHANGE ORDER JAYNES CORP. COR LOG # 3057-016 CONTRACT TITLE: NATIONAL CITY PUBLIC LIBRARY CHANGE DESCRIPTION: ASI #9 added reinforcing at walker duct Delete: Add: $2,729.73 1. DIRECT LABOR DATE: 7/1/2004 HRS. $0.0( Supervision 0 50.00 50.00 Project Management 0 50.00 50.00 Carpenter 0 $0.00 $0.00 Laborer 0 50.00 $0.00 2. INDIRECT LABOR COST (Labor Burden, etc.) 3. MATERIAL $0.0 4. DIRECT EQUIPMENT SO.OI" 5. SALES TAX MATERIAL & EQUIPMENT COST (7.75% OF LINES 3 AND 4 if not already Included Line 3) $0.0 -'; 6. DIRECT WORK SUBTOTAL (LINES 1 - 5) SUBCONTRACTOR WORK COMPANY AMOUNT REMARKS Pacific Coast Steel $2,574.00 SEE ATTACHED BREAKDOWN SUBCONTRACTOR WORK TOTAL: $2,574.00 CHANGE ORDER TOTALS 7. PRIME DIRECT SUBTOTAL 8. SUBCONTRACTOR WORK TOTAL 9. CDC/BUILDERS RISK INSURANCE (0% LINE 7+8) 10. GENERAL CONTRACTOR FEE (15% of LINE 7 and 5% of LINE 8) 11. GENERAL CONTRACTOR BOND (1% of LINE 7+8+9+10) GRAND TOTAL TIME EXTENSION AND JUSTIFICATION REMARKS: NAME AND TJTLS OF PREPARER: Daniel Luker, Projectonager (Jaynes Corp.) WORK DAYS 50.00 $2,574.00 50.00 5128.70 527.03 $2,729.73 ger eb, in . C^`r 431653 PCSBACKUP PCS ALTERNATE FAK6192431853 05:32:51 p.m. 06-17-2004 3 /3 PACIFIC COAST STEEL, INC. Contractors License #: 645574 7 155 Mission Gorge Road San Diego, CA 92120 Contractor: Jaynes Coro Job Name: National City public Library Description: Extra #: 4 Walker Duct AST #9 Add #4 @ 18" o.c. @ SOG for Walker Ducts Rebar: Labor Impact: Detailing: 1 Hours @ $ 65/Hr Delivery: 0 $ 159.00 /Load Sub Total = Profit & Overhead @ 10 % & 5% Sub Total = Bond Fee = Total Extra To Contract = 1 Phone: (619) 286-3405 Fax: (619) 286-3603 Date: 6/17/2004 PCS Job #: 04S-024 2301 LB's @ $ 0.45/LB $ 1,035.00 18 Man Hours @ $ 61.50/Hr $ 1,107.00 $ 65.00 $ 2,207.00 $ 342.00 $ 2,549.00 $ 25.00 $ 2,574.00 Page 1 AIA Document G710" -1992 Architect's Supplemental Instructions PROJECT 'Warne and address): National City Public Library 1401 National City Blvd. National City CA 91950 OWNER (Name -and addres:s): 1TY OF NATIONAL CITY 1243 National City Blvd: National City CA 41950 FROM ARCHITECT (Name and address): Carrier Johnson 1301 Third Avenue Sart Diego CA 92101 OWNER ARCHITECT CONSULTANT CONTRACTOR FIELD OTHER ARCHITECT'S SUPPLEMENTAL INSTRUCTION NO: 012 DATE OF ISSUANCE: June 14, 2004 CONTRACT FOR: General Construction CONTRACT DATE: TO CONTRACTOR. (Name and address): ARCHITECT'S PROJECT NUMBER: 4486.01 X x X The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgment that there will he no change in the Contract Sum or Contract Time. DESCRIPTION: See attached detail regarding Sheet No. S2.01. Added Note #7 AIA Document G71WTM 9g2. Copyright /91980 ending by The American Institute of Architects. Aa rights reserved. WARNING: This AIAe Document is protected by U.S. Copyright Law and international Treaties. Unauthorized reModuCtiOrt Or distribution of This AIAe Document, or any portion of It, may resuh in severe Chr9 and criminal penaldes, and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 15:4g:Do on ee/i 4/2004 under Order No.1000107577_4 which expires en 3/23/2005, and is not for male. User Notes: (3959120361) ATTACHMENTS; (Here insert listing of documents that support description.) AST 012-SKI, dated WI012004, 8.5" x I I" drawing ISSUEONY THE ARCHITECT: -J) G 7,nR - N Y , CAa.�si AO cw tiJ . (Signature) /P..-- (Printed name and title) Ala Document G7101,4—1992- Copyright 1 1980 and 1992 by The American Institute of Archdeck. A11 fights reservod. WAANINGl This Ale Document is protected by V.S. Copyright Law end International Modes. Unauthorized reproduction or dtsltaniIlen OMIT MAa Document, or eny portion of its may result In severe civil and criminal penalties, aril will be prosecuted to IM maximum extern possible under the taw. This document was produced by AIA software at 13:49:00 an 0611412004 under Order No.1000107577_4 which expires on 3123r2005, and is not tar tettele. 13959120301) User Hales: UNDER FLOOR DUCT PLAN NOTES; 5. SEE 1/54.02 FOR COLUMN BASE PLATE SCHEDULE. 6. SEE ARCHI1tt(URAL DRAWINGS FOR EXTENTS OF TOPPING. STEP STRUCTURAL SLAB 3" TO ACCOMODATE 3" OF TOPPING PR1"54.1 7, REINFORCE FOOTING w/ (80) #7 VERTICAL BARS ANO #3 TIES A 12' O.C. S/S4.02 (SIN.) FROM 52.01 111111111,CamRing CrigInec.fa 301 Ow** Oat Rio Matt adte (OBO San OVA G 1RQR48 9200 (!6191 521-8500 Fax (6191 521-8591 NATIONAL CITY LIBRARY JOB NO. 108004 DAT£ 06-10-04 DWG. NO. AI fa•LI• 1.001 TOTAL P.04 Jt.41. 23 2004 5:01PM JRYNES CORPORATION JAYNES COPRORATION V)k � DmMAn POR CHANGE ORDER iAYNES CORP. C0R LOO 3 3057-007 (6191 66B-4090 P•9 CONTRACT: 1I 3057 CONTRACT TITIJ t NATIONAL CITY PUBLIC LIBRARY DATE, 611612004 CHANGE DESCRIPTION: Reinforcing Stall Changes at Caissons par ratem.4 submittal Delefas Add: 13,211.19 1. DIRECT LA60R NRs. I10.00 Supervision O $0.00 50.00 Project Mana6amast 0 $0.00 50.00 Carpenter 0 50.00 S0.00 Laborer O 60.00 60.00 2. INDIRECT LABOR COST (Labor Burden, stc.) 3. MATERIAL S0.00 $0.00 4. DIRECT EQUIPMENT 1. SALES TAX MATERIAL S. EQUIPMENT COST (7.75% Of LINES 3 AND 4 If not already Included Une 3) S0A0 30.00 6. DIRECT WORK suUTOTAL (LINES 1- S) S0.00 SUBCONTRACTOR WORK COMPANY MOONY REMARKS Pacific Coast Stool 13.02O.O0 for ubsons. Contract Documents do not Indicate reinforcing details at Ulm locations. Price collects the delta botwaon thalr assumed qty and venal qly speed by designer In wha,mal review SEE ATTACHED BREAROOWN SUBCONTRACTOR WORK TOTAL 53,026.00 CHANGE ORDER TOTALS 7. PRIME DIRECT SUBTOTAL B. SUBCONTRACTOR WORK TOTAL 9. COC/BUILDERS RISK INSURANCE (0% LINE 7+0) 10. GENERAL CONTRACTOR PEE (16%af LINE 7 and 5' of LINE 6) 11. GENERAL CONTRACTOR BOND (1% of UNE 7t8+9+10) TIME EXTENSION AND JUSTIFICATION REMARKS; NAME�PREPARER: Danbi Luker, Project Manager (Jaynes Corp.) WORK DAYS sr (deb, Inc.) 40.00 $3,020.00 s0.00 S161.40 541.79 6-20-04; 2:28PM;PACIFIC COAST STEEL. ;818 286 3803 qma 1/ PACIFIC COAST STEEL, INC. FACSIMILE COVER SHEET TO: DANIEL LUKER FROM: Deryl Rowell MAY 2 0 2004 COMPANY: JAYNES CORP. TITLE: Project Manager FAX NUMBER: (619) 668-4090 DATE: MAY 20, 2004 PHONE NUMBER: (619) 668-4080 TOTALNO.OFPAGESINCLUDMCOVER: 6 RE: NATIONAL CITY PUBLIC LIB. PCS JOB# 04S024 NOTES/COMMENTS: Daniel, Please find attached Extra # 1 & 2. Extra #1 is for the changes at the steel column piers, and Extra #2 is for the 3 caissons that had no structural detail. We originally had an assumed weight of 667 lbs for the caissons. The actual weight is 3,026 lbs. Thanks, A •beryl Rowell 7155 MISSION GORGE RD, SAN DIEGO, CA 92120 PHONE (619) 286-3405, FAX (619) 286-3603 )1; .'41,`5-20-04; 2:28PM; PACIFIC COAST STEEL. ;818 286 3603 PACIFIC COAST STEEL, INC. Contractors License tl: 645574 7155 Mission Gorge Road San Diego, CA 92120 MAY 2 0 2004 Phone: (619) 286-3405 Pax: (619) 286-3603 Contractor: Jaynes Corp Date: Job Name: National City public Library PCS Job #: Description: Extra #: 2 Reinf. Changes for Caissons. Detailed per notes on returned submittals. Rebar: 2359 LB's @ $ 0.45/LB Labor Impact: 19 Man Hours @ $ 61.50/Hr Detailing: 1 Hours @ $ 65/Hr Delivery: 0 $ 159.00 /Load Hoisting 1 Sub Total = Profit & Overhead @ 10 % & 5% Sub Total = Bond Fee = Total Extra To Contract = Page 1 04S-024 $ 1,062.00 $ 1,169.00 $ 65.00 $ 300.00 $ 2,596.00 $ 402.00 $ 2,998.00 $ 30.00 $ 3,028.00 I ii li III III I•:1"• JAYNES COPRORATION ESTIMATE FOR CHANGE ORDER JAYNES CORP. COR LOG it 3057-019R1 CONTRACT: CA5N7 CONTRACT TITLE: NATIONAL CITY PUBLIC LIBRARY GE DESCRIPTION: Changes due to Sequence 01 structural steel submittal review Delete: Add: $11,883.96 DATE: 8/20/2004 1. DIRECT LABOR HRS. Superintendent 0 $0.00 $0.00 Project Management 0 $0.00 $0.00 Carpenter 0 $0.00 50.00 Laborer 0 $0.00 $0.00 2. INDIRECT LABOR COST (Labor Burden, etc.) 3. MATERIAL $0. 50 4. DIRECT EQUIPMENT $0 5. SALES TAX MATERIAL & EQUIPMENT COST (7.75% OF LINES 3 AND 4 If not already Included Line 3) 50 6. DIRECT WORK SUBTOTAL (LINES 1 - 5) $0.00 SUBCONTRACTOR WORK COMPANY AMOUNT REMARKS Pacific Coast Iron PER REVISED AGREEMENT IN THE FIELD 8/20/2004 511,206.00 See attached documentation from PCI, Incl detailing hrs SUBCONTRACTOR WORK TOTAL: 511,206.00 CHANGE ORDER TOTALS 7. PRIME DIRECT SUBTOTAL $0.00 8. SUBCONTRACTOR WORK TOTAL G11,206.00 9. COC/BUILDERS RISK INSURANCE (0% LINE 7+8) 50.00 10. GENERAL CONTRACTOR FEE (15% of LINE 7 and 5% of LINE 8) $560.30 11. GENERAL CONTRACTOR BOND (1% of LINE 7+8+9+10) 5117.66 GRAND TOTAL $11,883.96 TIME EXTENSION AND JUSTIFICATION REMARKS: NAME AND TITLE F REPARERs Daniel Luker, Project Manager (Jaynes Corp.) WORK DAYS C.170( 64(1. ons „LT tion pager (deb, inc.) �/ PACIFIC COAST IRON 9038 JAMACHA ROAD SPRING VALLEY, CA 91977 619-461-9800 May 25, 2004 Jaynes Corporation 8530 La Mesa Blvd La Mesa, Ca 91941 Attn: Daniel Luker Re: National City Library Subject: Change Order Request #409-005 Gentlemen: Please find listed below a description of the design changes, which were made on the returned shop drawings (05-06-04). 1: Change size of beam 1 136B (from WI0x12 to W 12x14) located on grid E Material (32# x .45)= $ 15.00 15% IvUU= $2.00 Total= S 17.00 2: Add W16x26 beam and make 1 end of the beam a full -pen connection, at the south of grid line E-3, 2" floor Material= S234.00 Shop labor= S 180.00 (3 hrs) Field labor= S5SS.00 (6 hrs) 15% M/U= S 150.00 Total= S1,152.00 3: Add W18x35 beam and make 1 end of the beam a full -pen connection at the south of grid line E-3 & 4 on the main roof Material= S 199.00 Shop labor= S 180.00 (3 hrs) Field labor— S588,00 (6 hrs) 15% M/U= S 145.00 Total= $1,112.00 4: Add a W8 x24 beam at grid line 3-B Material= $86.00 Shop labor= $90.00 (1.5 hrs) Field labor= $147.00 (1.5 hrs) 15% M/U= $48.00 Total= $371.00 5: Add moment connection at one end of beam 2048A (W18x35), grid line 6.3- D & G Shop labor= $90.00 (1.5 hrs) Field labor= $392.00 (4 hrs) 15% M/U= $72.00 Total= $554.00 6: The following are detailing costs only (The total cost includes any costs associated with changes listed above) A: Change the depressed slab location at grid line E-A&B to west of grid line E (2" floor) • B: Change slope for beam 2054C (W18x35) on grid line D —7 & 8 C: Change in depression located on 2" floor between grid line 2.3-3 and A-B (RFI 56): D: Change beam position at grid line E.3 (RFI 56): E: Match angle with beam on grid BB-X0/X2 and HSS 5x5x1/4 F: Modify connection for beam located on grid X3, beam located on grid D G: Modify connection in both ends of beam 2033C H: Modify elevation of beam 3159A I: Modify connections of beams 208I A, 2060A J: Change details of channel ends (17/S501 to 12/S501)/ sfl K: Changes for the above items included 8 Detailing= (231.25 hrs Total change order amount requested: S 17,081.00 Documentation of hours from the detailer sent under separate cover. • S incerely, Pacific Coast Iron Bill Burton V. CONTRACT: 1C1 JAYNES COPRORATION 1:5TIMATE FOR CHANGE ORDER JAYNES CORP. COR LOG 0 3057-019 CONTRACT TITLE: 3057 NATIONAL CITY PUBLIC LIBRARY CHANGE DESCRIPTION: Changes due to Sequence 01 structural steel submittal review Deletes Add: $18,114A0 1. DIRECT LABOR DATE: N. 7/8/2004 HRS. $1% perintendent 0 $0.00 $0.00 P ect Management 0 $0.00 $0.00 Ca ter 0 $0.00 $0.00 Labors 0 $0.00 $0.00 2. INDIRECT LABOR COST (Labor Burden, c.) 3. MATERIAL 4. DIRECT EQUIPMENT 5. SALES TAX MATERIAL & EQUIPMENT COST (7. 5% OF LINES 3 AND 4 if not already included Line 3) $0 $0 $0 $0. 6. DIRECT WORK SUBTOTAL (LINES 1 - 5) $0.00' COMPANY SUBC•NTRACTOR WORK AMOUNT REM S Pacific Coast Iron $17, 81.00 attached documentation from CI, incl detailing hrs SUBCONTRACTOR WORK TOTAL: S17,081.00 CHANGE ORDER TOTAL 7. PRIME DIRECT SUBTOTAL $0.00 8. SUBCONTRACTOR WORK OTAL $17,081.00 9. COC/BUILDERS RISK IN • RANCE (0% LINE 7+8) $0.00 10. GENERAL CONTRA • R FEE (15% of LINE 7 and 5% of LINE 8) $854.05 11. GENERAL CONT OR BOND (1% of LINE 7+8+9+10) $179.35 GRAND TOTAL $18,114.40 TIME EXTENSIO AND JUSTIFICATION WORK DAYS REMARKS: NAME AND TITLE OF PREPARER: Daniel Luker, Project Manager (Jaynes Corp.) ACCEPTED BY: Martin Gabey, Construction Mana r (deb, inc.) PACIFIC COAST IRON 9038 JAMACHA ROAD SPRING VALLEY, CA 91977 619-461-9800 May 25, 2004 Jaynes Corporation 8530 La Mesa Blvd La Mesa, Ca 91941 Attn: Daniel Luker Re: National City Library Subject: Change Order Reg -st #409-005 Gentlemen: Please find listed below a description of the design changes, which were made on the returned shop drawings (05-06-04) 1: Change size of beam 1136B (from WI x12 to W12x14) located on grid E Material (32# x .45)— $15.00 15% MIU= $2.00 ota1= $17.00 2: Add W16x26 beam and make 1 end of the bea full -pen connection, at the south of grid line E-3, 2°d floor Mate '.1= $234.00 Shop 1..or= $180.00 (3 hrs) Field la.•r= $588.00 (6 hrs) 15% M $150.00 Total= $1, 52.00 3: Add W18x35 beam and make 1 end of the beam a full-pe ' connection at the south of grid line E-3 & 4 on the main roof Material= $199.01 Shop labor= $180.11 (3 hrs) Field labor= $588.00 6 hrs) 15% MaU= $145.00 Total= $1,112.00 4: Add a W8x24 beam at grid line 3-B Material= $86.00 Shop labor= $90.00 (1.5 hrs) Field labor= $147.00 (1.5 hrs) 15% M/U= $48.00 Total= $371.00 5: Add moment connection at one end of beam 2048A (W18x35), grid line 6.3- D & G Shop labor= $90.00 (1.5 hrs) Field labor--- $392.00 (4 hrs) 15% M/U= $72.00 Total= $554.00 6: The following are detailing costs only (The total cost includes any costs associated with changes listed above) A: Change the depressed slab location at grid line E-A&B to west of grid line E (2"d floor) B: Change slope for beam 2054C (W18x35) on grid line D —7 & 8 C: Change in depression located on 2nd floor between grid line 2.3-3 and A-B (RFI 56): D: Change beam position at grid line E.3 (RFI 56): E: Match angle with beam on grid BB-X0/X2 and HSS 5x5x1/4 F: Modify connection for beam located on grid X3, beam located on grid D G: Modify connection in both ends of beam 2033C H: Modify elevation of beam 3159A I: Modify connections of beams 2081A, 2060A J: Change details of channel ends (17/S501 to 12/S501 K: Changes for the above items included Total change order amount requeste Documentation of hours from the detailer sent under separate cover. S incerely, Pacific Coast Iron Bill Burton • CHANGE ORDER REPORT Da53menl Coda CO.052504-PC41 Protect: National City Public library Pro)aet N•: 0409 Pape 1 of 6 . .. ClIont Pacifib Coast Iron Change Sourc4 PCI 409�5 (Approval rsturn comments a odiousness A roval At & 1E2) Ducurnenb Mari as Change Deou194lena TIM IIi •< g `i'`f,v �.6]_•ai 8 6 £ E 2 $ y111 o 1 11176 1 X x MIA, 0066on M grd E.3 -E101 - 1.75 2 1114A 1 X X /40dayp04:Ion et grid E3 •E101 1,76 3 1104A 1 X X Madpypasilten el 4rd_.1 •Etat 1.75 1 1151A 4 X X Mod4y Pon6on el pdd E.3 • E101 1.76 5 1116A 1 X X Mctily podlicn of 41d E.3 -E101 1.75 6 1194A 1 X X May pu46o-i ofgrid E3 -E101 1.76 a 1060A 1 X X Modity dbaroosim boated m 2" boor (between s.ds 2.3-1 61.2) - 6101 1.6 9 10466 1 X X 1Mdifya0-rnsm11 lee td at 21" poor between 41442.3361-2 - E101 15 0 11 11360 1 1X X XI -X - Modfy raa brben1111136510:ated on yid E(between 9Ide 1&2)- E101 2 12 1007C 4 X Molly slat for beam 113E13 located onord E (batmen oid4t6j1 - E101 1:75 13 1020A 1 X X Madfy*Oa for beam 11350 located onarid E (between pills 16J - 0101 1,75 I4 1003A 1 X X 6b6fysbe for beam 113613 loco:. an grdr 0t.Iween pdd6162)-E101 1.75 15 15 104013 1 X 1X Adl beam W16726b lh0tooth of gfd E(betbeen 011da 364. at 00o. -E101 1.75 17 1472a I X I X Add loam W16675 b the mutt. of p1d E (oehreenydds 3 6T-nt2"'9i0or - 101 1.75 lb New 1 X 1 X Am beam W16726 b Owbouln oforidE babyea, '• 164 012" Ion r -E101 1.75 10 20 1193A 1 X X Roo.ovv dayonal 1193.6 - E101 21 1094A f X X Remove 6apones 1193A - E101 . 1 22 - 21 1060A 1 X X Mosygl 9Y wool buwve4 baem lts4.80.1N an eenbpd 1a1%,ha1c161a n 2•'`aeaf_Et01 1.75 24 11a7A 1 X _ X 56k.frep 0104e for wood beam S563131 on .PA8*liana at2`Nor -E101 1.75 25 11411A 1 X X noon p rt...Il wncd be.m 11566.3.1Mon wr.4y (swN mbar. M2 Aocrj101 1.75 2p 11056 1 X X d4441lwcaved ba,n:1556.31131 w1 ureay(sout, womb./ ethoer) -6101 1.76 27 1190A 1 X X M 1kVdraw, M4*led beem11536a3.1N on canopy 01o1M*lnance M 7' rml-E101 1.75 Note: me changes de1e2ed ebn a m6 10.10 desyn soanges resecied on 0w approves rabsn commonly of eequtnws 11 & P2. Atbched Document*: savoys Doe Calnlputn: Revision$ :0 Prepared b1 JCV )Apprewd by: SS I C. Date: 05l21 • -a.:..:.axa.a.,.w. • CHANGE ORDER REPORT DDarmenlc w.. Projack National City Pubfic Library.. CO-05250MC1.1 Project N°: 0409 Client: Pacific Coast Iron Page 2 of c anq.soarc. PCI 400.05 Deatment (Approval return comments of a.gwnrtas i1 d M2) M.mbw. Tme Ch rip O.OertpOoev w g Pi.e.mrtk D i Mlacellaneous ottr. yl m' ZG. 3 n f y V 8 a i va 6 f_ F i 1 i A E 1S F v $�` a m S I3 5 t 1 s w n ru Remarks Haan 29 1154A 29 1136A 1 X X Madly Oq AAeNlwovved beam ia:matu toe canopy mien. a 2" a.r1 30 1 % % amM - E101 Mr617 by A.aafrex.adbsam MS�.x.A1/4 engine p/ 4somhricam A 2'wrf -E101 1.75 1.76 31 2454C 1 X X 32 2037A 1 X Ma atop.gr/mam 2054C 148.4 Y. grid 0(IenreagMs l88) • En. Mod A a for beam 2054C..bcalec 2 33 34 2027* 2025A 1 1 X % % r. mid OH.. 9 ( Oh •6101 Mod slops b learn 2054Cbcdcc.: Ird 0(betw•:en gads 7891 — E/01 1.75 1.75 35 2023A % ydap.ler beam 2014C loured r a90 (between 681 •EIO I 30 1 X % 941.7 Moc a1adly dope for boam 2054C bcalod %pid 0 {cetwem 7. 81 -E101 1.15 37 1061C gods 1.75 36 1082A X XMH bean`Niea35. lbe imlh of k?,,t<Nreen has Id 4. at mainm 1 X X - Ado beam W185J5b the amiln of oe2(Wham arias 38 Cm molnmoN 35 nor 1 X X -E132 IAddImam W18435b Me saUl 4.18.44ErbcMwn 364, 1.75 whim alma Moll •E102 1.75 42 X X Ramonriagonal 11.92A -E102 43 1049.4 1 r% X Remavc di.pona11192A -E103 1 1 44 3048* 1 X X 4 memnt carman 9 non a..n(s d, enl, aim d1040. 0•49emC 80, n n.m qv') - 2 45 44 2020A 1 X X 444 meow.cotyledon .'am 2044A(mom 4ne w. 1 ee 04 a3, emf.nw, c 80, ran.. moil - 4102 Z 47 40 1111A 1 X X Modify de.noe to lhm.*,or41a/Nm 6-1, ad cl 10111.540D E1018 E102 49 1u5QA 10SS, 1 X X Ma;lo1.nce lobe edge brajuse 4-Inel14d al O'/I1w Sex{•E,018E102 r 1_ 60 10T7A 1 X X Medctana la the ad0e of 1bb (use 6'r14Ead a113) 1` 600t -E101 8 E102 1.76 1.75 Si 103011 1 % X Mork distance 10 are edge atswb(>. 6 srsloadof10 r 1`to •E1018E102 62 1 X Mod1748114npe1nln9of 135 (via 5-Instead Boar - 1 2 1,15 Ti //19A 1080A f X X 84od1yd'etam5065 e la the tape of stab0oaa 5' imato 0110111`floor) . E1018E102 75 1. 1.76 1 X k 8bd4y deVrx.lab,. edge el' MO lusaiInwood of 10111' Ow)• E1016 E102 1.76 Neter Thee .ngce 4mw418 ebare ,4 due to 199409 ohalyo. 5e4ec148 an the approval return a,m:nanl at aeounea4 41 8 42. A1lach.d Dowmalbl a\iprtwa, Data, beserb,dnn. - IPr.o5md by JCv �Apet00.dby: SD I C.C.: 1 I Dater 05125/04 ..A.-.we.•„-r.. CHANGE ORDER REPORT pnnitnent Code CO-062604-PC1•1 Project National City Pottle Ltbrery Project Nt: 0409 Pape 3 of 0 Client Pacific Coast Iron Chmt9e Sowu PCI 409-05(Approval return comments of sequences 01 31 DealmenE ipPP 9 j Members Cho • oesodo0ons Ramarka Moore Type Modify 4.ngN z a' g m '1 d g S )l 2:• 1�(r s r'! 4 A Tea i g I a.. i 8 m g 1 iy m a 3 u7 ae o: $ 5C st r. o ot J Placsmark $T 5 5 o E i 1 m s c m o i i 2 54 11040. 1 X T i 11 Mod9y diatonne to6m adoeetdoh hese 6Instead of 10lj1 Poor) • EMI 66102 1.76 5S 1069E 1 X X Mork), distance to Pes Odno of stab Nu 6- suited 0f10j I' or -6101 X6102 1.76 56 1134A 1 % X Malay distance to to ed0a of slab(est 6' hAlrod 0110 1` ea -61016E102 3.16 67 11198 1 X X ModfydMtenceb0tec_ydedi0.b(use6'1nleesi r) of 197 (1• Poo-E1014 E102 1.75 56 1047E 1 X X Mod ryd4bntgbalced t stab (use 6'ImW-ad el 101(17Poo -E1016 E102 1.76_ 175 59 1066A / X X Modilydhtanc to edge ofclog (use 6' Indeed e110j(V' Poor -610166102 60 1019A 1 I X X Mbdfdbtantc to 00 edge of slab (use IT butane oflT)(1` Pow -610166102 1.76 61 1072A 1 X X Madly amenee to the wale of.MO (use 6' wuW et 191(1' Poo) - 6101 a 6102 1.75 62 2012A 1 X X moat,d'e:larca to let edge ofa46uac6ksstewal0]Si"Moor) • E101 a C102 1.76 63 2060E 1 X X Madb dunce bNeehm of slab(uca 6 Instead e1109tl" IWOr1 .61016 E102 1.75 64 2124A 1 % %- Madly dlwn.to the nehr of deb lose 5- instead a110't 1"L -E101 X6102 US 65 205TA 1 X X Mbdfy69ea to are eageol stab (use ob0.ead of 1011/ Omr •E1016E107 1.76 66 3647A -1 X X Modnydistant to Weedoa ofdeb (use r mattes 0110')(1"em)-E1011E102 1.75 67 3000A 0 X X Moleydiatsnot to Ito Ate of stab (6se6- in8660 010' (1` Poor -EMI SE1d2 1.15 69 2071A 1 X % Modifyt6sta7a In ore ed0o of slob nos d'tamed oe 101(1` Thor •61011E102 1.16 09 2092E 1 X X Modify deaub Ole - - of deb(use 6' Instead 01101(1• Poor •6.0166102 1.75 X 611ance to the ede�te Qj � 71 21666 1 X X MediaAston. to 0a edge of stab pac v' instead at l0•i l'soo: • E1011EI02 1.75 72 2654C 1 X X Modfy sentence W ore edge of web f.ae 6' ensted of 19111" boor • 6101 6 E102 1.75 1002E 1 X X Matey Oman. to Oaed9e of s150 W. 6' Instead Of 10i12n1lb0r)-€101 ael02 135 TA 1oo76 i x % Moody datanae to edge el deb hoc a'ireadal 10112od Mot/- 61011.4102 1.75 76 1611.1 1 X X Modiydstance edge slob betted of 101(2nd Goer) -61016 E102 1.75 76 1096E 1 X X to the Modlydstanc0lo the edge otdeb(we 6mdeed or 10')(2nd Poor - E1014E102 1,75 77 1041E 1 X X Mealy aiatenee lb the edge mde4 Mao 6'drsledWlO')r2M Rood -E1016E102 1,73 76 1114E 1 X X Modify distance alto edgeot slab asst 6' Instead 1610')(2nd 6001j, 610166102 1.71 79 10666 1 X X Modify dialence b the edge at slob Wen 6''Weed or 101 ( red nowt- 61014—M 1.76 60 1063A 1 X X Moth dOtenre to the edge Wetab hoc 6'1nstu 1O')(2M1avf1 • E1014 E102 1.75 - Male: The changes &O filed ea.e as doe Weinstein chngea needed an 0. approved roWm<dnrnlnh at aeebdnfee a1 a 62. A1la6Md Devemema: APPS7TO 1 Date: Dtmoant.n: Runic° s .0 Prepared by JCV IAntroved bye 50 .O.: Date. 05,26/C. .............. ....le-wpdKf 4 CHANGE ORDER REPORT Document cog, Co-052504-PCI.1 Project National City Public Ubrafy •. Project N^. 0400 Peye 4 v! 6 ClioO= Padflc Coast Iron Demanorte PC1408.05 (Approval rawm comments of sequences it dIY2) Member. Change Oeaeflpl one Remarks Hare T50. 6 ' j i s E o e.6-. 8 a' � 2y i z S l ygi L Q> 1 ' S fg 8 • - � E c a p a ii $ r e E. e" � s 3 e C i 18 ry s 6 'r Mearmark E 11 0 0 m • y o w TI II a 91 1122A .1 X X smeary 6swee to the rnlgo Nsla�we 6'wlaad of i0'1a:,d aom 1.75 02 1123A I X X .5101bEI02 Molly OlaaMnb lee edge of slab (Use 6' almond of 101(2rd Boor) -E1016 E107 1.75 03 1086A 1 IX X Mo6ydslanse to. edge of slab (aeae. 9ateed of 101(2na0ar) • E10166102 1.75 eel 10419 1 X X moo* dawn 1.7 Us, ed2eolaab(use 6' mstead.t101(2n0 Boort-E1016 6,02 1.75 86 86 87 1086A 1 X X Modify 6danrs100a WA, A Web Meta/Wa11P112rd floor.-E101 S Ifs /.T5 11188 / X X Modrry 6nme. to the edge or pleb Mae 6' hbaedof101(2d floor -E101 a E102 5522 1112A 1 X X lssery dislr.cn to On adrse N slab laser indeod of 10112rd orl-El S 10 1.75 88 1000C 1 X X 6mly&stanceto lM d edgesab(wSo e5' Instead of IC, Roar)-610166102 1.75 6J 29298 1 X X Moay&stance le the cape N eahfuse6-InstW of 101,22n0 aoor(. E10166102 1.75 90 2071B 1 X X Mostly cesCplcc to the own of ere(we e' instmd of 191(2d floor) . E1016 E102 1.78 01 2129A 1 X X Mod &'boater I e oef dab use6-motor&9110' 12Mame -EMI 6 E102 1.15 92 81A 1 X X Mody distance 19U1ca cola we ore o 10)12dMal- E101 S E. 1.75 03 2080A 1 X X Noddy (balance to the edge of slab fuse 6' ins4a0et i6']12ed11eor)_- IO1S ((02 s.ts 98 2000A 1 X X Mostly distance to the ed*Je al sob (we 8' instead of 10' Mori -61011 E102 05 2166A 1 X X Mold &lance to the. a N ea9.c 6 Instead of lO 2M •1=1162 1.7s 00 2084A 1 % % Nl6dflv ds0heea cote CQcO&saD fw06-rblaedof l0'](2H Ma]•E1016 E102 1.15 07 2206A 1 % Nbdy d•Irsablbedo Nebo tase 6'itsreadoll0' f2rd A7a1•EI016E152 1.75 06 20.W1 1 X X Abdl &aancc to the. .&slab bac6'eotsadof10' 26E1 floor -E10I SEt02 1.T5 99 10808 1 X X Modes&dares. lee edeo bf slab (we 6' instead of 10112M floor, -EMI 6-102 1.78 10l 1010A 1 X X Modify 6amnc0 to the oleo &slab use C. instead 410- 2r.5 floor -E1016 E102 1.18 q1 1062A 1 X X Modesdeaac to Ma ed5e N stets lwe 6' baled& 10')(2s4 float - E1016 6102 1.75 ed 1060A 1 X X M94ly la the Hem NY.M Sums Friwd 010'112n0 roar)-E1018. E102 1.75 1m 1060A 1 % % ton. kb r& thus Nsmb we6't0add 10 2M lbor -EtOl6 E162 1.76 MI 1652C 1 X X Hufy&atarss b the edw&s�wa 8' mat*" oast u119152ndlOal-E1016 E102 1.75 .P1 l08 1o50C 1 X X Ma. m be.saan beam too Oa 80.betw•een X04t2) end dagaal HSS5.S1i1 -ItoI 1.76 1L1 1093A 1 X) X WW1 aspfe6h.Benleam ton d&BB,haleeeen XO- X2) end diagoo.IHSS5a5a1M . 'Olt l 1.75 Nolo: The chancres 08a8H ab0ae era d» to dealgn stances memlH Cr10se reptant rots., moments orWO-MM a 81 & 82. - Attached Dosomentel I Aber05' Der: Oescrip00n: Revision :0 I Prnplmd by: 4CV Approved by l SG C.C.: Dale: 05125M8 CHANGE ORDER REPORT ocisnent Code Project: National City Public library CO-062604-PCM Project N': 0400 Client Pacific Coast Icon Page 5 of 6 Ch*"" 409 0 (Approval return comments e sequences 99 & ) Members Champ 04s5 Ikea 2 Pleeneselk Type 5*152 a 1 a i ... i I 12 § 07 r• 11 . ti(1, a 0 . • = II 2 to-1 S z a li go • NA k o Remarks Home 1054 0 11201A 11110A 1 2 X n shore aeons., Wars (us 710 BC 00rween - Ls. esp., HTS, . 110 1 X X -101. mete eNk b.....eb.j•fl (On gnd se, be** X1). 33) se eapore 7113545x1/4 1.75 to 1011A 1 X -1011 lot ones Os so. ha (000e5ea, woo. X0 -)Cel and 4•50ete HST,. 1. 175 111 1114A .1011 7.76 1 X X HS 12e 4114 requi.s ds no1or 0L-nonslon prearkl 1.5 tne helm.' -1154 114 10024 1 X W212444114 re • vel liS Oli • r ternoteeon • traUe( to Me Ton/oral -1164 2 K561204014 r. • 4 ILI 11100, dimtrtvan us-5110 lo Ora horizontal - 1154 2 1.1KM ) 1 HIIIIIIIIIII IIIflhI 615512s441.'4 wastes •ts major ancnvon parallel le 0•• honiorval - 4155 0 100ZA 1 XX riSS12x4x1/4 rot Xs rns • errnanslor„2,parekt to U., hod/onto, - 1155 OSS12.t.the tecoies itt mole &cone*, temlin to we ii.tttnnia, - 1 66 2 ao aorta 1.76 2001A i 1 t Sewn (20335) conosekx• ice sal Xl, ben s DOS Off 1. 512 5 2033 1 X IIII/ , • fv boom 1253351 con 2 (on 71123. Wee. mei DO I 55.1 412. Wel TO13 1.75 t 20 atA - 1 /1 34 10.1 20331 1 1 X way teem Man) On 0. bee n grds X3 l X4.. Z.' Iloaff - 2033 • been 72331 weer. con • la 17. pevnee . .5 03 a xi..ti. •• i 73 -2033 1,75 y co coon 4000.0443055.010 2033C - 203, 3 10*4.47 menaceon ks both we& of Won 203C. - 2023 7 7$ 161 3.15t_con in beh oo4. ol bears 70330 .3433 1.75 1.75 ETS1 4.40224,7 b000.Xvelon (Mons - 2c54 X Merry boas elevattoo (31314/ - 2054 ITS 01111111EMIIIIME1111111111011Z X Mod barn elevatton 3159A - 2034 1.75 1.75 WIIIEZEMmillEillM111111•111111 1111E1 M11111111111111111111111/111MIIIIMMIIIIIIIIIIIIIIIIIM EllINIIIMMIIIIIM1111111111•1111111111111111 P•400 aose e—OVar 0. 1169A - 2054 MEM MMMMM 0m, Itnon, 'Seen., 3259X • 2054 MEM Nols: the changes 0•15l2.41 stove sro due to daeyn elanges retools!. the approval teturn conmenla a seven:es *1 1 W. Attached Deeerneree: APOTOW Oats. Noe. Van: Revision 0 ; 0 re At/Proved SC 1041e: 03/23/04 .m.....,...p,«... CHANGE ORDER REPORT Document Coda CO.0$2504-PC61 Project National City Public Library Project N•; 0409 Page B of 0 Client: Pacific Coast Iron pgaa`,roenaouree I PCI 409.05 (Approval returncomments o sequences NI & 92) Yemb.n CMO. D.wfp0onr R.m.1ko Hours irw S �_{ ae * e co £ a.g 2 s Modify W.P.._ I qii . m g -a K= 4 y. �Z'l, 3 yE•g ., I eh.% PPY = 0` n a ®g2, e I W Other 7 Pbuleak I 0 i 4 Ez r5 4 $ . a ` 8$$! .M 20612 1 1 x k 11a 26710 1 X X Alocily comee.onn for team 2061Ab eonm 20710 .201 1.75 137 04 2060A 1 X X b10,44cdon kw Imam 2000Ab 00.12071C -20TI 1.76 120 20r IC 1 X X bbdN oomewkn he beam 3060AW bcaraa_C • 30T1 1.79 140 nl 2024A 1 X X V..M.J1265.91*Card lil55.01.Aootaopwe. lo. ct.. ,b agae.d'a am.. 4049 1.75 v1 20654 1 X XI Use ilea11255.e1 MN/ad ln.551./may N. wlC. tar *Ma b agpn215a4.3019 1.75 1,3 2121A 1 X X the dew 125501Instead 11755.01. Aaplyshep ..IM la cnmal. blup95Os1 a.1. -2010 1.75 1•4 20641 1 X X Use dea512lS5Aa9awM o1T5501.A�51N04wldlb.Na.wk..5.. eg Nea.7019 1.75 u5 2062A 1 X X Use deb.1156.051*4Al.1I725.01.Apply.lgp .made b.Nwak b euppaly bar. -7049 1.75 ul 2091A 1 X X Use deld125501 kr..d 11755:0t. Aopl1A, .nl.lw desruk.. ..Vb. .00 1.75 ,.5 Sant t 1 X X 1.ede1a11255011 ..4el 1716501. Appy dqp .l11.. 1he4Mk baaop>egbrc 4059 1.76 g. 2049A 0 X X Use deu1120.501ae.r1 al vies e1. Aprdy 166P ....b0.nnekb Aloe.. .2.1 1.75 w9 21672 1 X X Use dew 1750 et tweed al 1056.Ol.44p1y .hapww b.NA.061.009a0g100. .20a9 1.75 ley 2107A 1 X X V. de.175501 tweed el lT2501.40oWlowl5. b c afee6 is fap9..0V .a,-3040 1.73 151 2167C 1 X X Ua.de lIrts561fr 4490+ r5501.',wk..,..c...d,. ai.b.uppuwgbm-70.a 1.76 114 2116A 1 X X Vvd 4112I550l Inked! 1T:6501.400.4ap H1b.NAfp11591ap5dl6m2 bm..20a9 1.75 us- 1 k. dd 221.25 Nob: The chaspee deta6ed above 2,0 due to dual90 chellpes needed on the approval return comment, Of sego floe 01902, A1bched 0acam.nle: Appor.1 Dale: Ueamplicn: Prvpelerd by JCV l Approved by : 50 R1115ion 0:0 Omar, avz5r JUG-27-2004 10:48 CONSTRUCTION ADMIN 619 231 4138 P. E 2i0? 1AIA Document G709" - 2001 Work Changes Proposal Request -PROJECT (Name and t ddress): National City Public•Library 1401 National City.Blvd. . National City CA 91950 OWNER (Name.and address): CITY OF NATIONALCITY 1243 National City Blvd. . National City CA 91950 FROM ARCHITECT (Name and address): Carrier Johnson 1301 Third Avenue San Diego CA . 92101 TO CONTRACTOR (None and address): Jaynes Corporation General Contractors 8530 La Mesa Blvd.- Suite 306 .. La Mesa, CA• 9194-1 OWNER ARCHITECT CONSULTANT CONTRACTOR FIELD JOHNSON CONSULTING PROPOSAL REQUEST NUMBER: 005 DATE OF ISSUANCE: July 27, 2004 CONTRACT FOR General Construction CONTRACT DATE: ARCHITECTS PROJECT NUMBER: 4486.01 Please 'submit an itemized proposal- for changes in the Contract Sum and Contract Time for proposed modifications to the Contract Documents -described herein. Within Zeno (0 ) days, the Contractor must submit this proposal or notify the Architect, in writing, of the date on which proposal submission is anticipated. THIS IS NOT A'CHANGE ORDER, A CONSTRUCTION CHANGE DIRECTIVE OR A DIRECTION TO PROCEED WITH THE WORK DESCRIBED IN THE PROPOSED.MODIFICATIONS. DESCRIPTION (Insert a written description of the Work): Provide all material and labor to install 6 exterior outlets as shown on the attached 8.5" x 11" drawings. (5 monuments and one cast in the end of the concrete bench) AIA Document G709TM — 2001•00Pyrien1 O 1999 and 2001 by The Amoco institute of Architects. All rights reserved. WARNINri This AIAe Document It proIct.d by U.S. Copyright Law and International Trestles. Unauthorized reproductIOn or distribution of this Ale 00cumenl, or any portion of it, may result In severe civil and criminal penalties, and Will prosecuted to the maximum extent possible under the low. This document was produced by AtA software at 17:14:00 on 07/20/2004 under Order No.1000107577_4 which expires on 9123/2005, and is Miter resale. User Notes; (3047855403) LL-c 7-2004 10: 4e 0CINSTR.UCT I ON D 11 N.' ATTACHMENTS (List attached d'focumentx that support description): PR 005-SKI PR t1105. SICI PR 0054K:3 PR 0054K4 PR 005•SK;5 REQUESTED BY THE ARCHITECT: 43! i!isentia.sz L. ki (Printed name and title) Cot•4•W "• Ada • MA Document 0709,6 _ 2001. Copyriglet 91993 and %!C'61 u; y The^ ,4mrieen Institute 01 Architects. All rights reserwtd. tvAf lwoc il'Thla AIAe Document is piroleoted by U.S. CoptrtillOt Lew end International 'rialtos. Unauthorized reproduction or distribrilor otthla AIAr IGNlcument, o any portion at ftmsy sue in severe call final criminal ipenuttie t, an will be prosecuted to ono maximum extent posh t. W unit ler flue Itnr. This dot molt was produced by AIA stk./ere at 17:14:09 On CI17e!5/2004 under ¢hek:r N0.1000107ST7_4 which expires an 829/2005, fluid is riot I Or n aF . User Ikatas: (301781 e'wa) JUL-27-2004 10:48 CONSTRUCTION RDMIN 619 231 4138 P.04i07 (1) 2"C. DATA Iz15E UP INTO ROOM 0232 RISE INTO ROOM '2 2 F-1VAC CABINET N (1)2' CABLE TV N. 1 l 11111111111111111111111111111111111111111111 ARCHITECTURE INTERIOR OESICM RUURROD PARTIAL SITE PLAN 1 Q1 moo ME11v S1N IMO, CALIFO MA 02101 TEL s,9 218 IMO FAX 019 239 OUT c,E. CHINO, ARCHITECT o»arlva«, AF Drawing My 1 R O O 5" 5K F, frA NATIONAL CITY LIBRARY ProJ�cl Na 44 36.01 p,b 7123 /2004 nnnn 6Yn 61,6 VV./ F9'Qn RINV7/pslrA JU_-27-2004 10:49 CONSTRUCT I ON ROM 1 N 67.9 23`. 413? P.'7_t; /lr7 COM 14-0187 AG-40,42 r Ell E [ig 161 fi;] (1) 2'G.O. eFAI EEE 4F-29,3I,33 1 `\ 29 111111111111111111111111111011111111 ARCHITECTURE trii100R OEStr,N PIANN(NC 1301 THIRD AVENUE SAN 04200, CALIFORMA 02101 7E4 010 239 2353 FAX 51i 230 0227 C.E C+R10ER, ARCHITECT 0eeuiption Crowing No. PAJK1 Pr:Jsq N. Cot„ ZIP /2004 .PEA tTIAL SITE PLAN 1 "=.30' ! J1ONAL CITY LIBRARY 4486.01 I� El 1 7L 1/c E CO2E113 -0162 PASS 4 SEYMOUR 4460z-8 SERIES CORR061014 RESISTANT WEATRERPROOF CAST AUR ttM!•I PRAM AND COVER WITH GAM LOCK KEYED DOOR OUTDOOR POWER RECEPTACLE MOUNTING DETAIL 6E1P t£Z 619 JUL-27-204 10:53 CONSTRUCTION ADMIN 619 231 413E P.07/07 5 4 Z 4 O O rOIa' I-06i M 1 1 Q h P{ If 6d 9 r to $ a i a 6 4 « 1' e I 40.1 a i a 1 Oft r i ARCH IN O cON PVHNwO 1301 holm AVENUE SAN DECO, GWFORNN 92101 TEL 619 239 2353 FAT 619 1]9 62Z7 C.E. ON1',lrl, ARCHfT[OT R N a a t a A ii ti l . I a 2 II a I a 2 i a 00 i a 2 1 2 2 I a a a V r i B I a s 3 PANEL SCHEDULE i v •• it 11 tuiri O Gvrfn9 No, E9. 1 p ` co' ' S k Pre,, NATIONAL CITY LIBRAEY Prujaot No, 4486.01 0a1e 7/23/2004 1 0 4 1 1 LL TOTAL P,07 JAYNES CORPORATION ESTIMATE FOR CHANGE ORDER JAYNES CORP. CPR LOG # 3057-029R1 CONTRACT: CONTRACT TITLE: # 3057 NATIONAL CITY pVUBLIC LIBR> RY CHANGE DESCRIPTION: PR #5- Outdoor receptacles Delete: Add: 55,287 DATE: 9/15/2004 ..r 1. DIRECT LABOR Superintendent HRS. 50. O 50.00 50.00 Project Management O 50.00 50.00 Carpenter O 50.00 50.00 Laborer 0 $0.00 50.00 2. INDIRECT LABOR COST (Labor Burden, etc.) S0. 3. DIRECT MATERIAL $0.1 4. DIRECT EQUIPMENT 50.00 5. SALES TAX MATERIAL & EQUIPMENT COST (7.75% OF LINES 3 AND 4 if not already Included Line 3) $0.00 6. DIRECT WORK SUBTOTAL (LINES 1 • 5) $0.00 SUBCONTRACTOR WORK COMPANY REMARKS AMOUNT Sunburst Electric '• see attached 54,985 SUBCONTRACTOR WORK TOTAL: 54,985.00 CHANGE ORDER TOTALS 7. PRIME DIRECT SUBTOTAL 8. SUBCONTRACTOR WORK TOTAL. 9. COC/BUILDERS RISK INSURANCE (0% LINE 7+8) 10. GENERAL CONTRACTOR FEE (15% of LINE 7 and 5% of LINE 8) 11. GENERAL. CONTRACTOR BOND (1% of LINE 7+8+9+10) GRAND TOTAL. r 1w ` , r •, SO 54,985 SO 5249 $52 TIME EXTENSION AND JUSTIFICATION WORK DAYS REMARKS: REVISED PROPOSAL. WITH "SCRATCH IN CONDUITS UNDER HARDSCAPED AREAS. NAME AND Ti LE OF PREPARER: P LCt. M Daniel Luker, reject j anager (Jaynes Corp.) ACCEPTED BY: Martin'Oabey, Const tion f nagar (deb, Inc.) 15 04 12:47p SunburstElectric 619 476 7105 p.1 Sunburst Electric, Inc. Commercial # T-I # Industrial Change Order Proposal "ryx i Date: September 15, 2004 To: Daniel Luker Jaynes Corporation 8530 La Mesa, Blvd., Suite 306 La Mesa, CA 91941 (619) 668-4080 / (619) 668-4090 (Office) (619) 336-0350 / (619) 336-0322 (Job Site) Job Name: National City Library SEI Job Number: 04-002 CIO Proposal #: 2.2 Control # PR - 005 Work Description: Add six (6) outdoor electrical outlets. Exterior conduit to be "scratched in" soil directly under sidewalks. Unless otherwise stated herein, this proposal excludes premium time labor costs and work/repair of any kind for cutting, sawcutting, coring, patching, landscape, hardscape, sprinklers, painting, fireproofing, fire caulking, hazardous material work, UG locating and markout service, waterproofing and caulking, disposal of breakout spoils, disposal of spoils, asphalt and concrete. (All additional work is based upon the job conditions at the time of this proposal and includes the original contract terns and conditions, unless otherwise stated We reserve the right to adjust the price and scope of this work if there is a change in the job conditions at the time this work is started We require your written change order, signed and dated before we proceed with this work) The total amount of this change order proposal addition consisting of 3 page(s), is $4,985.00 and requires J_ additional working day(s). (This pricing is valid for 30 days) Sincerely, rear ea-Wd( Scott Kidwell This proposal contains proprietary information and is considered confidential to the recipient. It is submitted upon the expressed condition that the information contained herein, along with any supporting documents, will not be released to competitors or otherwise be used directly or indirectly in a way detrimental to the interest ofSunburst Electric Inc. 337 W. 3561 Street, Suite A, National City, CA 91950 LIC#738087 Phone (619) 476-710i Fax (619) 476-7105 Member -National Electrical Contractors Association Affillation-/IfI VLOCAL 569 Oep 15 04 12:47p SunburstElectric 619 476 7105 P - 2 JAYNES COPRORAT1ON LrSTIMATC FOR CHANGE ORDER JAYNES CORP. COR LOG N 3057-PR 10005 CONTRACT: # 3057 CONTRACT TITLE: NATIONAL CITY PUBLIC LIBRARY DATE: 4J26/04 CHANGE DESCRIPTION: Add six (6) outdoor eleotrical outlets. Delete:: Add: $4,98495 1. DIRECT LABOR HRS.. Electrician 43.93 S29.00 41,.273.9r 2. INDIRECT LABOR COST (Labor Burden, etc.) $853.56 3. MATERIAL 51.989.00 4. DIRECT EQUIPMENT S0.00 6. SALES TAX MATERIAL t EQUIPMENT COST (7.75% OF LINES 3 AND 4 H not already included Line 3) 5154.15 6. DIRECT WORK SUBTOTAL (LINES 1 - 5) $4,270.68 SUBCONTRACTOR WORK COMPANY AMOUNT REMARKS SUBCONTRACTOR WORK TOTAL: S0.00 CHANGE ORDER TOTALS 7. PRIME DIRECT SUBTOTAL 64,270.66 8. SUBCONTRACTOR WORK TOTAL 9. COCFBUILD ERS RISK INSURANCE (.K(% LINE 7+8) 10. CONTRACTOR'S OVERHEAD 8 PROFIT (15%of LINE 7+8+9) 11. GENERAL CONTRACTOR BOND ( 1.5% of LINE T+8+9+10) 50.00 S640.60 $73.67 GRAND TOTAL. $4,984.95 TIME EXTENSION AND JUSTIFICATION PR 8005 WORK DAYS 1 day(s) REMARKS: Sunburst elect:Ica 2.1 Excludes Con:ante Work. NAME AND TITLE OF PREPARER: ACCEPTED BY; Scott Kidwell, Project Manager (Sunburst Electric, Inc.) Daniel Luker, Project Manager (Jaynes Corp.) • $ep 15 04 12:47p SunburstElectric 08/03/04 082 itPRI # Description 619 476 7105 ttC Li4rary- PRY5 FYTFHSION BY PHASE 0ty Price U Ext Price Labor U Ext Labor --- 01 Raceway, Ftgs, & Boxes --- 1587 3/4° Locknut 12 22.46 C --- 01 Raceway, Ftgs, & Boxes Total --- 2787 412 THHH CU Solid Wire --- 02 Wire & Cable Total --- 2.70 0.13 E 1.56 2.70 1.56 --- 02 Wire & Cable 1,355 66.53 M 90.11 6.30 M 8.53 90.11 8.53 05 Wiring Devices & Covers -- 4518 20A/125V Spec Grade GFI Dup Rcpt (5- 5 13.46 E 67.30 0.37 E 1.85 4731 IG Cast Dup Rcpt Cover w/Hinged Lid 6 284.40 E 1,706.40 1.26 E 7.56 8261 Grndscr&Bare Pigtail 6 22.81 C 1.37 2.10 C 0.13 . - -- 05 Wiring Devices & Covers Total --- 1,775.07 9.54 --- 06 Underground/Site -- 1188 3/4" PVC Conduit 430 30.52 C 131,24 3.94 C 16.94 2061 3/4' PYC Nale Adaptor 12 29.08 C 3.49 0.17 E 2.04 2115 3/4" PVC Coupling 14 15.25 C 2.14 0.06 E 0.84 2127 3/4° PVC Elbow 14 49.80 C 6.97 0.32 E 4.48 Ina: F"JY1'D Band DI Trench -Clay Soil 430 0.00 E 0.00 10.11 C 43.44 - -- 06 Underground/Site Total --- 143.84 95.46 Job Total 2,011.72 �15 09 43.93 P.3 Page 1 I qR II allll II L,. plug. 18 2004 2:28PM JAYNES CORPORATION (619) 668-4090 JAYNN CORPORATION V5TINATO FORCLANG! ORDER( JAYNES CORP. COR LOG S 3057.33 P.1 CONTRACT: CONTRACT TITLE: DATE: 5 3057 NATIONAL CITY PUOLIC LIBRARY ENU004 CHANGE DESCRIPTION: Crndk for dolotbon et Tnemee pAnfor on orchltsotanlly exposed stool, per RPI 0047R2 Danko:41,597.11 Add: 1. DIRECT LABOR Suporinhndont HRS. O $0.00 60.00 $0.00 Project Management 0 $0.00 *0 0D Carpenter (MCI 431.75 eftor $(30104) 0 $0.00 $0.00 Laborer O 50.00 $0.00 2. INDIRECT LABOR COST (Labor Borden, etc.) 150.00 3. DIRECT MATERIAL $0.00 4. DIRECT EQUIPMENT 10.00 5. SALES TAX MATERIAL 8 EQUIPMENT COST (7.75% OF LINES 3 AND 4If no already Included Lino 3) $0.00 S. DIRECT WORK SUBTOTAL (LINES 1 •5) $0.00 SUBCONTRACTOR WORK COMPANY REMARKS AMOUNT Pacific Coot Iron 41,506.00 SUBCONTRACTOR WORK TOTAL: 41,508.00 CHANGE ORDER TOTALS T. PRIME DIRECT SUBTOTAL B. SUBCONTRACTOR WORK TOTAL S. COCIBUILDERS RISK INSURANCE (0% LINE 740) 10. GENERAL CONTRACTOR FEE (15% of LINB 7 end S% of UNE 8) 11. GENERAL CONTRACTOR BONO (1% of LINE 74549r10 TIME EXTENSION AND JUSTIFICATION WORK DAYS REMARKS: NAME AHD TITLE OF PREPARER: Daniel Lek , Project Manager (Jaynes Corp.) ACCEPTS ono Ct!on ger (dM, Inc.) . 16 2004 2:29PM JAYNES CORPORATION. 4FR9' 11368-409T1 August 17, 2004 Jaynes Corporation 8530 La Mesa Blvd La Mesa,Ca91941 PACIFIC COAST IRON 9038 JAMACHA ROAD SPRING VALLEY, CA 91977 6119-461-9800 Attn: Daniel Luker Re: National City Library Subject: Change Order Request Tnemec paint credit Gentlemen: Please find listed below a description of the design changes, which wen: made for deleting Tnemec paint. Delete Tnernec paint at locations specified on Sheets A5.10, A5.11 :I , A_ .1.3, A 5. 21 , and . A5.21. Total Sq Ft equals 538 SF x $2.80 per Sq Ft = $1,506.40 Total credit amount: $1,506.41D Sincerely, Pacific Coast Iron Bill Burton ,II 111 City of National City, California COUNCIL AGENDA STATEMENT December 7, 2004 MEETING DATE AGENDA ITEM NO. 5 (ITEM TITLE Resolution of the City of National City approving Change Order Number Four with Jaynes Corporation which includes eight various requested or required structural, design, and document modifications to the plans and specifications for the Library Project in the total amount of $32,163 and authorizing the City Engineer to sign the change order. PREPARED BY Stephen Kirkpatrick DEPARTMENT Public Works/Engineering 336-4386 EXPLANATION There are eight components to this change order. Each component, along with the reason that the change is necessary, is listed on the following page. CEnvironmental Review N/A Financial Statement Approved By: Change Order Number Four is for $32,163. Finance Director There is adequate funding budgeted for this change order in the project account numbers 241-409-500-598-1583 and 242-409-500-598-1583. Account No. STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION N/A ATTACHMENTS ( Listed Below ) 1. Resolution 2. Change Order Number Four Resolution No. ZOO Lf-ZZ7 Iibra A-200 i9:991 EXPLANATION 1. ASI #001; COR #005: Elevator Cab Back Wall Panel Clarification. This modification was required because the project bid documents did not clearly identify the type of wood paneling to be used. This added cost is only the difference from what was assumed at time of bid and the cost of the identified wood paneling. 2. ASI #004; COR 010R1: Revise Structural Steel Skewed Beam Connection, This modification resulted from a Change/Revision to the original Beam connection. The revised design required additional detailing, material procurement/fabrication and labor. Upon a more detailed review, the changed connection was a determination that the welded connection was more appropriate for the load capacity of these connections. 3. ASI #007; COR #009R1: Revised Roof Steel Framing and High Parapet Alignment. This modification resulted from the structural engineer changing from a bolted connection to a welded connection detail at seven (7) locations and added work to cut "notches in fourteen (14) H-Beams at the Roof Framing. Upon a more detailed review, the changed connection was a determination that the welded provided was more appropriate for aligning the different radius of steel at the parapet locations. 4. ASI #009; COR #016: Added Slab -On -Grade Reinforcing Steel for Walker Duct. This modification was required due to the slab -on -grade reinforcing steel being revised to include added rebar under and around the in -slab Walker Duct. This additional reinforcing steel provides strength to the floor slab concrete at the Walker duct locations to resist unanticipated slab cracking. 5. ASI #012; COR #007: Revised/Added Caisson Reinforcing Steel Detail. This modification was required due to the revising, adding and upsizing of the reinforcing steel design for two (2) Caisson footings. This added reinforcing was not identified on the original bid plans, documents and is required for the overall structural integrity of the load carrying Cessions 6. COR #019: Additional Structural Steel Detailing Costs. This change order request was a result of changes and revisions made to the Structural Steel Shop drawings by the Structural Engineer of record for the project thereby having to revise and re -work the detailing of the steel components. 7. PR #005; COR #029R1: Six (6) Additional Outdoor Electrical Outlets. This change is to add six (6) electrical outlet locations along the front entry elevation of the building. At the time of initial design outlet requirements at the added locations was not necessary. Adding the outlets will allow the Library/City to have more flex in the usage of the Library entry and the library parking lot areas. 8. COR #033: Credit for Deleting "Tnemec" Primer on Exposed Architectural/Structural Steel. This modification was processed as a result of examining the compatibility of the designated primer and the finish paint to be applied. It was decided to delete the primer on all exposed structural steel members resulting in a monetary credit to the Owner. RESOLUTION NO. 2004 — 227 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NO. 4 WITH JAYNES CORPORATION IN THE AMOUNT OF $32,163 FOR THE NATIONAL CITY LIBRARY CONSTRUCTION PROJECT WHEREAS, the contract for the Library Construction Project was awarded to Jaynes Corporation on February 10, 2004, by the adoption of Resolution No. 2004- 19; and WHEREAS, Change Order No. 4 consists of eight various requested or required structural, design, and document modifications to the plans and specifications for the project, in the total amount of $32,163. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 4 with Jaynes Corporation in the amount of $32,163 for eight various requested or required structural, design, and document modifications to the plans and specifications for the Library Construction Project. PASSED and ADOPTED this 7th day of December, 2004. ATTEST: N � c ael R. Dall Mi a, ity Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Nick Inzunza, Passed and adopted by the Council of the City of National City, California, on December 7, 2004, by the following vote, to -wit: Ayes: Councilmembers Natividad, Parra, Zarate. Nays: None. Absent: Councilmember Inzunza, Morrison. Abstain: None. AUTHENTICATED BY: NICK INZUNZA City Clerk of the City of National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2004-227 of the City of National City, California, passed and adopted by the Council of said City on December 7, 2004. City Clerk of the City of National City, California By: Deputy