HomeMy WebLinkAbout2004 CON Carrier Johnson Architects - Consulting New Library Change Order 2RItGINAL
Lbs
DESIGN AGREEMENT CHANGE ORDER NUMBER TWO
DATE: November 1, 2004
PROJECT: National City Municipal Library
TO: Gordon R. Carrier
Carrier Johnson
1301 Third Avenue
San Diego, CA 92101
DESCRIPTION OF CHANGE:
This design agreement change order has two components:
1. The first component of the change order is being written to increase the Contract
Documents section of the design agreement by $8,400.
2. The second component of the change order is being written to increase the allowed
Reimbursable Expenses section of the design agreement by $4,500.
Item
Original Agreement
Amount
Adjusted
Agreement
Amount with
changes to date
Adjusted
Agreement
amount with
this change
Design Development
$265,260
$265,260
$265,260
Contract Documents
$518,988
$525,488
$533,888
Bidding Services
$18,300
$18,300
$18,300
Construction
Administration
$250,320
$250,320
$250,320
Reimbursable Expenses
$36,800
$39,830
$44,330
Total
$1,089,668
$1,099,198
$1,112,098
DISCUSSION:
The following is a discussion of each component in the same order as listed above:
1. The City has requested that Carrier Johnson participate in two design upgrades.
The First is to upgrade the chandelier that is to be hanging in the central area of the
Library. The second is an upgrade to the exterior feature wall that will include
engraving of quotes that the Librarian is selecting. Both of these items will be done
as change orders to the construction contract. Carrier Johnson will prepare the
specifications that will be used by the contractor to bid on these upgrades. A
breakdown of these costs is included in the attached Carrier Johnson letter dated
September 21, 2005.
2. Expenses have been incurred on the project at a rate higher than anticipated. This
is due to both escalating prices, and more things needing to be copied, delivered,
etc. than originally anticipated. For more detail regarding the amount of increase
please see the attached Carrier Johnson letter
DESIGN AGREEMENT ADJUSTMENT:
As a result of this change order the design agreement is adjusted as follows:
1. The price is increased in the amount of $12,900 from the current contract price of
$1,099,198 to a new contract price of $1,112,098.
2. The time is unchanged. The contract completion date was previously established as
Wednesday, June 1, 2005.
This Change Order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work as described herein.
APPROVED BY:
CITY OF NATIONAL CITY
CARRIER JOHNSON
By: By:
—�k ��
Stephen M. Kirkpa i � GordonGo
Acting Director of Public Princi
Works/Engineering
By: '4-
Michael Joh son
Principal
September 21, 2004 sent by PDF
Mr. Stephen Kirkpatrick
Assistant Director of Public Works
City of National City, Engineering Department
1243 National City Boulevard
National City, CA 91950
RE: City of National City Public Library
Finish Enhancement Services Proposal
Dear Steve,
This proposal is offered to cover additional design services related to upgrading the finishes
for a couple of key building features. This approach is preferred in lieu of making the items
part of a Public Art campaign. The two items that the library would like enhanced
artisitically are:
1. The central chandelier element. The thought is to provide more color or
illuminated surfaces to make the element visually more dramatic. We have met
with the lighting designer and are pursuing two concepts.
2. The exterior feature wall at the entry. The intent is to provide a written quote in
several languages that will be etched into the stone veneer surface.
Based on the discussions to date, we propose to work on an hourly basis to a not to exceed
amount of $8,400.00 including design and construction administration services. We
estimate this design work will be completed within 30 days so it can be priced and
incorporated into the work. Our understanding is the work would be performed by Jaynes
Corp by Change Order. We can perform the work as an amendment to our base contract
or use a separate job number (4486.03) to identify the effort.
Please provide us written authorization so we can continue proceeding with the work. Since
the chandelier will need to be installed in early 2005, time is of the essence. Please let us
know if you have any questions, or if you need anything else.
Sincerely,
CARRIER JOHNSON
Kevin L Krumdieck,
Senior Project Manager
P:\4486.00\ProjMgmt\Fees & Contracts\4486.03 Finish enhancements\Fee proposal - Finish Enhancements.doc
NATIONAL CITY LIBRARY
ENHANCED FINISHES LABOR ESTIMATE 9/22/04
Chandelier alternatives:
Initial work: Meeting with subcontractor and NCL to discuss how to upgrade and develop alternatives,
research on materials for both concepts, lighting fixture research with lighting companies to find appropriate
materials, study model and section sketches, 2nd meeting with NCL.
Project Designer 18 hr @ $95.00 $1,710
Senior Project Manager 6 hr @ $145.00 $ 870
Job Captain/ Model maker 6 hr (a. $80.00 $ 480
SUBTOTAL $3,060 max
Follow-up work: Material selection with subcontractor involvement, final color and pattern selection meeting
with NCL, sample review, shop drawing recheck, field coordination with mounting heights and light fixture
aiming adjustments.
Project Designer
Senior Project Manager
Job Captain
Const Administration
Electrical consultant
SUBTOTAL
Quote wall alternatives:
12 hr @ $95.00 $1,140 '
2 hr @ $145.00 $ 290
10 hr @ $80.00 $ 800
10 hr @ $90.00 $ 900
4hr(a1$135.00 $ 540
$3,670 max
Quote Layout studies, meeting with NCL to select final layout, Document preparation for contractor, submittal
review, mockup review.
Project Designer
Senior Project Manager
Const Administration
SUBTOTAL
Meeting time:
10 hr @ $95.00 $ 950
1 hr @ $145.00 $ 145
4 hr (a $90.00 $ 360
$ 1455 max
Meetings as they arise are very hard to predict. Anticipate 2 extra meetings with Owner or contractor to
resolve design issues.
C:ITEMPUabor estimate attachment.doc
AR CHITEC T UR'
INTERIOR DESt(.
PLANNIN-
MI<:NAtI. C. IOMNCUN A...
'MIEL'AM r. ARfREN Fl
u[RORAR r. Luwrr 110E
FRAN, A. WOO, -
5101 TMAO AVENIiF
SAN 0 .O (.11 ifORAHA
rant
rr1 Ate 214 2{s)
IAX AI9 2)96227
zADIF MiCIIELTON
hLITE IDA
IHVINE f Al}FQR[11A
r>rI, z
rE 9R•1 95i ))S3
FA% Raa 9fS 21)?
Mr. Stephen Kirkpatrick
Assistant Director of Public Works
City of National City, Engineering Department
1243 National City Boulevard
National City, CA 91950
RE: City of National City Public library
Project Expenses Fee Increase Proposal
Dear Steve,
This propokal is offered to cover additional project expenses beyond those anticipated
when the project was started. It is likely that both the (Basic Services and FF&E
Services fees will need augmentation based on the current status and future expenses
anticipated_ it was noted in our contracts that the fees for expenses were estimates
',that may need augmentation as the project moves to completion.
Currently, we have $1,416 left in 44B6.01 (Basic services) and $537 teft in 4486.02
(FF&E)_ Both efforts should complete by May 2005 so we have 9 -10 months sett.
We expect the expenses could nin approximately $600 per month through May 05
(56,000) which suggests we will need approximately $4,500 more tor 4486,01. We
still need to do CD printing and CA processing on the FFEtE package which we
estimate may take another i3,000_ That would suggest we will need another $2,500
for 4486.02. tam not sure if it is easier for you to issue a single amendment for both
of these amounts ($7,000) or if you prefer to issue us separate authorizations by the
project or contract numbers.
Please authorize us to increase the fee limits accordingly. We will continue to bill the
expenses as they occur_ We suggest an amendment be issued and we will modify
our invoicing appropriately. Cali if you have questions.
Sincerely,
CARRIER IQHNSON
L
Kevin I. Krurndieck,
Senior Project Manager
cc: Chuck Lockwood -CI