FFE DESIGN AGREEMENT CHANGE ORDER NUMBER ONE
DATE: November 1, 2004
PROJECT: National City Municipal Library
TO: Gordon R. Carrier
Carrier Johnson
1301 Third Avenue
San Diego, CA 92101
DESCRIPTION OF CHANGE:
This design agreement change order has two components:
1. The first component of the change order is being written to increase the Contract
Documents section of the design agreement by $9,800.
2. The second component of the change order is being written to increase the allowed
Reimbursable Expenses section of the design agreement by $2,500.
Item
Original Agreement
Amount
Adjusted
Agreement
amount with
this change
Design Development
$16,000
$16,000
Contract Documents
$30,000
39,800
Bidding and Installation
$15,000
$15,000
Reimbursable Expenses
$1,800
$4,300
Total
$62,800
$75,100
DISCUSSION:
The following is a discussion of each component in the same order as listed above:
1. Additional electrical engineer design work associated with the selection of
audiovisual equipment for the library. It is necessary to have the electrical engineer
produce FFE bid documents for the most current A/V equipment that is compatible
and able to integrate with the buildingas designed. For a more detailed breakdown
of the costs please see the attached Carrier Johnson letter dated April 30, 2005.
2. Expenses have been incurred on the project at a rate higher than anticipated. This
is due to both escalating prices, and more things needing to be copied, delivered,
etc. than originally anticipated. For more detail regarding the amount of increase
please see the attached Carrier Johnson letter.
DESIGN AGREEMENT ADJUSTMENT:
As a result of this change order the design agreement is adjusted as follows:
1. The price is increased in the amount of $12,300 from the current contract price of
$62,800 to a new contract price of $75,100.
2. The time is unchanged. The contract completion date was previously established as
September 1, 2005.
This Change Order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work as described herein.
APPROVED BY:
CITY OF NATIONAL CITY
CARRIER JOHNSON
By: (1/11A. By:
Stephen M. Kirkpat Gordo
Acting Director of .lic Pri
Works/Engineering
By:
Michael Johnson
Principal
CARRIER JOHNSON
ARCHITECTURE
INTERIOR DESIGN
PLANNING
WILLIAM C. BOCKEN AIA
DEBORAH P. ELLIOTT IIDA
FRANK A. WOLOON
1301 THIRD AVENUE
SAN DIEGO CALIFORNIA
92101
TEL 619 239 2353
FAX 619 239 6227
2600 MICHELSON DR
SUITE 400
IRVINE CAI IFORNIA
92612
TEL 949 955 2353
FAX 949 955 2377
April 30, 2004
Mr. Stephen Kirkpatrick
Assistant Director of Public Works
City of National City, Engineering Department
National City, CA 91950
RE: City of National City Public Library
Audiovisual Equipment Design Services Proposal
Dear Steve,
This proposal is offered to cover additional design services related to Audiovisual Equipment
selection. This work is not part of the basic electrical design services and was not included in
our FF&E services. Typically, it is best to wait to do the detailed design once construction
has started so that the most current equipment can be specified. You really have two
choices at this point. You could retain a design engineer (Johnson) to provide traditional
bidding documents, or retain a design/procure/install firm to provide the complete
installation. We are not sure what latitude you have with the procurement process.
Johnson Engineers has performed some of the design work, at my request, to complete the
construction documents to keep the project on track. They have generically planned for the
necessary wireways and power needs for this equipment. We have also made allowances for
the equipment cost in the FF&E budgeting to date by using Johnson Engineers knowledge
from similar projects. Attached is Johnson Engineers fee proposal for producing the bidding
documents for your review. Recognizing this may be an unanticipated cost for you, we
propose to absorb our coordination cost for this work within our existing FF&E contract
amount. We can solicit a design/install proposal from a firm such as Anderson Audiovisual if
you feel you have that latitude as an alternative.
We will need this consultant to be in place when we start the FF&E CD documents in August.
It may be smart to start them sooner in case final equipment selection requires any
adjustments to outlet locations. Please !et us know if you have any questions regarding the
submitted information, or if you need anything else.
Sincerely,
CARRIER JOHNSON
\1-kvAt4Qb
Kevin L Krumdieck,
Senior Project Manager
Attachments: JCE fee proposal 10/10/03
w w.carrIerinhnwn cnm
C..F. CARRIER ARCHI EC1
#
Pow
Light
Multi
Common
Data Networking
onsulting Engineers, Inc.
Date: October 10, 2003 JCE Project No. 01067.03
Subject : City of National City
New Library
Mr. Kevin Krumdieck, A.T.A.
San Diego, Ca. 92101
Dear Kevin:
We are pleased to offer our engineering services for the above project. We propose to do the electrical
design for the project which has a scope as follows:
♦ Meeting Room # 120
•
•
Meeting Room #129
Entry #101
Computer Lab #225A
Distance Learning Room #237
AIV system including: LCD projection and monitoring,
Smart Sympodium, Distributed sound systems and
assisted listening system, AJV system control, Lectern
interface.
Mobile media cart with 50" TV and VCR
Plasma kiosk
A/V system including: LCD Projector & mounting,
Smartboard, and a Distributed sound system.
Interface room equipment with existing owner video
conference system, audio system, 32" monitor/TV and local
controls_
The above work to done as an addenda to the existing project now designed.
Note: Electronic copies of specifications, details or wiring diagrams for data, and multimedia systems
will not be provided and will remain the property of Johnson Consulting Engineers.
Our fee for the above work is: $9,800
If you have any questions on the above, please contact us at our office. Please return one signed copy
of this proposal as an indication of your acceptance and notice to proceed.
Sincerely,
Johnson Consulting Engineers, Inc.
President
Approved: Dated:
O.'Proposals°Carrier Johnson'National City Library - Multimiolia fee.wpd
12875 EIFCCKPRINTEP PLACE Slit rE 300 • Pownv, CAIFUaNIP 920E4 m TEL 958-679-4030 FAX 858-513-0559 - EMAIL iceinc@JCE-1NC-com
ARCNiT(CTt}R'
INTERIOR DEM;
PLANNIN
Mit. HAF{. C. Ie.NcuN ni..
WI!LTAM c.00CNENpr-
O2P0RAtf !. IJ110T1 I10/
FAAMV A. WCLJc5
101 ?HIV° AVGNtiF
Shro DUG() 4uti4:RMIA
97101
1'11 AO 214 2151
FAX bl411% c227
46n1? ti1CI11 O1
Sarre auD
IHVINE r A. lr(3RplA
9241?
TO. 949 '1)S 2)?3
in% 949 4,S 25)?
Mr. Stephen Kirkpatrick
Assistant Director of Pubic Works
City of National City, Engineering Department
1243 National City Boulevard
National City, CA 91950
RE: City of National City Public Library
Project Expenses Fee increase Proposal
Dear Steve,
This propokal is offered to cover additional project expenses beyond those anticipated
when the project was started_ It is likely that both the Basic Services and FF &E
Services fees will need augmentation based an the current status and future expenses
anticipated_ It was noted in our contracts that the fees tot expenses were estimates
'that may need augmentation as the project moves to completion.
Currently; we have S1,416 left in 4486.01 (Basic services) and S537 left in 4486.02
(FFS&E)_ Both efforts should complete by May 2005 so we have 9 -10 months left.
We expect the expenses could run approximately $600 per month through May 05
($6,000) which suggests we will need approximately $4,5O0 more for 4486.01. We
still need to do CD printing and CA processing on the FF&E package which we
estimate may take another 13,000_ That would suggest we will need another $2,500
for 4486.02. I am not sure if it is easier for you to issue a single amendment for both
of these amounts ($7,000) or if you: prefer to issue us separate authorizations by the
propect or contract numbers.
Please authorize us to increase the fee limits accordingly. We will continue to bill the
expenses as they occur_ We suggest an amendment be issued and we will modify
our invoicing appropriately. Calf if you have questions.
Sincerely,
CARRIER 10t$1SOI4
L
Kevin L Krumclieck,
Senior Project M.anager
cc: Chuck I or_kwood -CJ