HomeMy WebLinkAbout2004 CON Kleinfelder Inc - Testing Inspection Services Fire Station Change Order #1DESIGN AGREEMENT CHANGE ORDER NUMBER ONE DATE: December 2, 2004 PROJECT: National City Fire Station TO: Kleinfelder, Inc. DESCRIPTION OF CHANGE: This agreement change order has three components: 1. The first component of the change order is being written to include two services that were listed in the original Kleinfelder, Inc. contract as optional extras, but not included in the original amount approved by City Council for the contract. These additional services total $16,750. 2. The second component of the change order is being written to add $3,033 of additional work associated with contaminated soils discovered during the earthwork portion of the project. 3. The third component of the change order is for $1,800 of soil compaction testing associated with the relocation of the ultraviolet water treatment underground vault and the relocation of a sewer line. DISCUSSION: The following is a discussion of each component in the same order as listed above: 1. The original Kleinfelder proposal for the project included as optional extras retaining walls and reinforced concrete paving inspection and testing. These are considered special inspection services. At the time the contract with Kleinfelder was executed construction had not yet started and it was decided by the City that the inspection services to the degree specified within the proposal would not be necessary. However since we now have experience with the contractor it has become clear that in order to achieve the quality product that we expect we must perform these inspection services. A copy of the original Kleinfelder Inc. scope of work from the contract is attached to this change order. 2. During the earthwork portion of the project a large area of soil was uncovered that had the appearance of being contaminated with hydrocarbons. In accordance with the County of San Diego Environmental Health guidelines, excavation stopped and the material was tested. The testing ultimately revealed that the soil could be exported and disposed of as non -hazardous material. 3. During the construction of the project it was decided that the ultraviolet water treatment underground vault and a sewer line had to be relocated after they were already installed. A change order to perform the work was issued to the contractor. As part of the relocation work soil testing was required to ensure that the subgrade for the vault was stable and compact, and the backfill around the tank was compacted correctly. DESIGN AGREEMENT ADJUSTMENT: As a result of this change order the design agreement is adjusted as follows: 1. The price is increased in the amount of $21,583 from the current contract price of $54,000 to a new contract price of $75,583. 2. The time is unchanged. All work will be completed by April 2005 This change order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work as described herein. APPROVED BY: CITY OF NATIONAL CITY KLEINFELDER, INC. By: t‘ Stephen M. Kirkp City Engineer By: c r 1 By: January 27, 2004 Proposal No. 39852 Steven M. Kirkpatrick Principal Civil Engineer City of National City Engineering Department 1243 National City Boulevard National City, California 91950-4397 Subject: Proposal to Provide Testing Laboratory Services Project: National City Fire Department Headquarters Station 34 333 E. 16th Street National City, California 91950 Dear Mr. Kirkpatrick INTRODUCTION EXHIBIT "A" We are pleased to submit our proposal to provide Testing Laboratory services for the subject project. In preparing this proposal we have utilized '`project plans Bid Set dated 1/5/04, and specifications dated 1/5/04, both prepared by Jeff Katz Architecture. A construction schedule was not available at the time we prepared this proposal. SCOPE The scope of services we are proposing includes: • Soil testing and observation during earthwork for structures; • Lead -based paint abatement oversight; • Asbestos abatement oversight and as -requested air monitoring; • As -requested geotechnical consulting; • Compaction testing for utility trench backfill and paved area construction; O Structural cast -in -place concrete testing and special inspection; • Structural masonry testing and special inspection; 9 Field welding and high -strength bolting special inspection; Built-up roofing observation; Preparation of final special inspection report; Preparation of final "A' 5 ' iraded" report; and Preparation of compaction test summary, 2rSt)14Pu2i.doc ('unvris;tu 2004 IUcinlcldcr, Inc I'aor'_' January 27, 2004 The following are "Optional Extra" services we are offering should they be requested: © Sampling, testing, and observation of portland cementconcrete paving; • Testing and special inspection of masonry retaining walls; and • Special inspection of shop welding. FEES/BUDGET Fees for our services will be charged on a time -and -materials basis at the rates currently under contract with the City. As always, no charges will be assessed for vehicle, mileage, standard test equipment, or routine project administration. For budgeting purposes we have prepared an Estimated Budget based on a brief review of the referenced documents. Our budget does not include costs for overtime, retesting, or reinspection. Our budget also does not include travel and per diem costs associated with shop welding inspection not within 50 miles of one of our 60 offices. LIMITATIONS Materials testing and observation services provided by Kleinfelder will be performed in accordance with generally accepted procedures practiged within the site area. It should be noted even with diligent monitoring construction defects alight occur. In all cases the contractor is solely responsible for the direction and quality 'of the work, adherence to plans and specifications, and repair of defects regardless of when they are found. We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you have any questions or require additional information pertaining to this proposal, please contact the undersigned at 858-320-2211. Sincerely, KLEINFELDER, INC. /447 Ronald C. Thomson eq Lord, CEG Operations Manager Environmental Services Manager RCT:rulm cc: 1-toward Mills Rudolph and Sletten Enclosures: Estimated Budget P- 9582/SI)!4P(12.doc a�;c ; or 2 lanuilry 27, 2004 1 IBIT "B" ESTIMATED $LI.DQET National City FIRE DEPARTMENT National City, California 02010 Lead Abatement Labor included as part of the Asbestos Abatement oversight. If Abatement contractor chooses to abatc lead separately, oversight labor will be a change order. 02015 Asbestos Abatement Includes 20 hours of Asbestos- and Lead-certifiednspector's labor; Up to 3 air -sampling pumps for air monitoring; and Laboratory analysis. 02200 Earthwork for Structures and Pavements Includes 120 hours soil testing and observation; 20 hours Senior Engineer review and consultation; 16 hours footing inspection; Laboratory testing; and Final "As -Graded" report. 02225 Excavating, Backfilling, & Compacting for Utilities Includes 120 hours compaction testing; Laboratory testing; and Preparation of compaction test summary report. 02510 Asphalt Concrete Paving Includes 16 hours field testing; and Laboratory testing. 03301 Concrete Work Includes 80 hours sampling, testing, and special inspection; 16 hours sample pick-up; and 100 concrete compression tests. 04220 Concrete Masonry Units Includes 80 hours special inspection; 4 hours sample pick-up; and Laboratory testing. 05120 Structural Steel — Field Includes 80 hours field welding special inspection; and 10 hours non-destructive weld testing. 07500 Membrane Roofing Includes 48 hours observation 0.00 $ 2,000.00 $ 15,000.00 $ 10,000.00 $ 1,500.00 $ 9,000.00 $ 7,000.00 $ 6,200.00 $ 3,300.00 Total Estimated Budget $ 54,000,00 Copyright 2004 Kleincldcr. inc I'tn!c I of 2 ianu w V 27, 2004 ESTIMATED BUDGET National City FIRE DEPARTMENT National City, California Optional Extras 02.514 Portland Cement Concrete Paving Includes 40 hours sampling, testing, and observation; 8 hours sample pick-up; and 40 concrete compression tests. 04220 Concrete Masonry Units — Retaining Walls Includes 160 hours testing and special inspection; 6 hours sample pick-up; and Laboratory testing. 05120 Structural Stecl — Shop Includes 40 hours shop welding special inspection; and 8 hours non-destructive weld testing. 12,500.00 $ 3,300.00 P-395S2/SD14PU25 doc i:opyright 2004 Klcinfcidcr. Inc Page 2 of 2 January 27, 2004 City of National City, California COUNCIL AGENDA STATEMENT MEETING DATE December 21, 2004 AGENDA ITEM NO. 10 ITEM TITLE Resolution of the City of National City approving Change Order Number One with Kleinfelder Inc. which includes three components of additional special inspection services necessary to insure compliance by the construction contractor with the plans and specifications for the Fire Station project in the total amount of $21,583, and authorizing the City Engineer to sign the change order. PREPARED BY Stephen Kirkpatrick DEPARTMENT Engineering EXT. 4383 EXPLANATION Please see the attached change order, which full details the additional services requested from Kleinfelder, Inc. and the reasons the services are necessary to help insure the success of the project. J Environmental Review (-Financial Statement N/A MIS Approval Approved By: Change Order one is for $21,583. Funds are budgeted for this change order in project account number 250-409-500-598-1588. Including this change order there is approximately $314,000 remaining in the contingency budget for this project. Account No. STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION N/A Ina ce Director ATTACHMENTS ( Listed Below ) 1. Resolution 2. Change Order Number one Resolution No. 200 A-200 (Rev. 7/03) RESOLUTION NO. 2004 — 237 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY APPROVING CHANGE ORDER NUMBER ONE WITH KLEINFELDER, INC., WHICH INCLUDES THREE COMPONENTS OF ADDITIONAL SPECIAL INSPECTION SERVICES NECESSARY TO INSURE COMPLIANCE BY THE CONSTRUCTION CONTRACTOR WITH THE PLANS AND SPECIFICATIONS FOR THE FIRE STATION PROJECT IN THE TOTAL AMOUNT OF $21,583 WHEREAS, the contract to provide testing laboratory services for the National City Fire Department was awarded to Kleinfelder, Inc. on March 2, 2004, by the adoption of Resolution No. 2004-35; and WHEREAS, a change order is necessary to extend the scope of the work to include retaining walls and reinforced concrete paving inspection and testing, and soils inspections. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. One with Kleinfelder, Inc. in the total amount of $21,583 for additional retaining walls and reinforced concrete paving inspection and testing, and soils inspections for the construction of the fire station project. PASSED and ADOPTED this 21st day of December, 2004. ATTEST: -44,104 IA Mic ael R. Dalla, City Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on December 21, 2004, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Parra, Zarate. Nays: None. Absent: Councilmember Natividad. Abstain: None. AUTHENTICATED BY: NICK INZUNZA CiClerk of the Citof National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2004-237 of the City of National City, California, passed and adopted by the Council of said City on December 21, 2004. City Clerk of the City of National City, California By: Deputy DESIGN AGREEMENT CHANGE ORDER NUMBER ONE DATE: December 2, 2004 PROJECT: National City Fire Station TO: Kleinfelder, Inc. DESCRIPTION OF CHANGE: This agreement change order has three components: 1. The first component of the change order is being written to include two services that were listed in the original Kleinfelder, Inc. contract as optional extras, but not included in the original amount approved by City Council for the contract. These additional services total $16,750. 2. The second component of the change order is being written to add $3,033 of additional work associated with contaminated soils discovered during the earthwork portion of the project. 3. The third component of the change order is for $1,800 of soil compaction testing associated with the relocation of the ultraviolet water treatment underground vault and the relocation of a sewer line. The total of the three change orders is $21,583.00. DISCUSSION: The following is a discussion of each component in the same order as listed above: 1. The original Kleinfelder proposal for the project included as optional extras retaining walls and reinforced concrete paving inspection and testing. These are considered special inspection services. At the time the contract with Kleinfelder was executed construction had not yet started and it was decided by the City that the inspection services to the degree specified within the proposal would not be necessary. However since we now have experience with the contractor it has become clear that in order to achieve the quality product that we expect we must perform these inspection services. A copy of the original Kleinfelder Inc. scope of work from the contract is attached to this change order, 2. During the earthwork portion of the project a large area of soil was uncovered that had the appearance of being contaminated with hydrocarbons. In accordance with the County of San Diego Environmental Health guidelines, excavation stopped and the material was tested. The testing ultimately revealed that the soil could be exported and disposed of as non -hazardous material. 3. During the construction of the project it was decided that the ultraviolet water treatment underground vault and a sewer line had to be relocated after they were 1 already installed. A change order to perform the work was issued to the contractor. As part of the relocation work soil testing was required to ensure that the subgrade for the vault was stable and compact, and the backfill around the tank was compacted correctly. DESIGN AGREEMENT ADJUSTMENT: As a result of this change order the design agreement is adjusted as follows: 1. The price is increased in the amount of $21,583 from the current contract price of $54,000 to a new contract price of $75,583. 2. The time is unchanged. All work will be completed by April 2005 This change order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work as described herein. APPROVED BY: CITY OF NATIONAL CITY KLEINFELDER, INC. By: By: Stephen M. Kirkpatrick City Engineer By: EXHIBIT "A" 1,i-IE. i'J,1 L!'_hi;E1:� January 27, 2004 Proposal No. 39852 Steven M. Kirkpatrick Principal Civil Engineer City of National City Engineering Department 1243 National City Boulevard National City, California 91950-4397 Subject: Proposal to Provide Testing Laboratory Services Project: National City Fire Department Headquarters Station 34 333 E. 16th Street National City, California 91950 Dear Mr. Kirkpatrick: INTRODUCTION t .,a 40 We are pleased to submit our proposal to provide Testing Laboratory services for the subject project. In preparing this proposal we have utilized 'project plans Bid Set dated 1/5/04, and specifications dated 1/5/04, both prepared by Jeff Katz Architecture. A construction schedule was not available at the time we prepared this proposal. • 40 SCOPE The scope of services we are proposing includes: • Soil testing and observation during earthwork for structures; • Lead -based paint abatement oversight; • Asbestos abatement oversight and as -requested air monitoring; e As -requested geotechnical consulting; • Compaction testing for utility trench backfill and paved area construction; • Structural cast -in -place concrete testing and special inspection; • Structural masonry testing and special inspection; • Field welding and high -strength bolting special inspection; • Built-up rooting observation; • Preparation of final special inspection report; • Preparation of final "A$ ,traded" report; and • Preparation of compaction test summary. I'-395R7/Sr)I 4P025.cdor Pace 1 ur 2 3 lauuaFy 27, 20(14 • The following are "Optional Extra" services we arc offering should they be requested: • Sampling, testing, and observation of portland cement concrete paving; ® Testing and special inspection of masonry retaining walls; and • Special inspection of shop welding. FEES/BUDGET Fees for our services will be charged on a time -and -materials basis at the rates currently under contract with the City. As always, no charges will be assessed for vehicle, mileage, standard test equipment, or routine project administration. For budgeting purposes we have prepared an Estimated Budget based on a brief review of the referenced documents. Our budget does not include costs for overtime, retesting, or reinspection. Our budget also does not include travel and per diem costs associated with shop welding inspection not within 50 miles of one of our 60 offices. • LIMITATIONS Materials testing and observation services provided by Kleinfelder will be performed in accordance with generally accepted procedures practiced within the site area. It should be noted even with diligent monitoring construction defects might occur. In all cases the contractor is solely responsible for the direction and quality 'of the work, adherence to plans and specifications, and repair of defects regardless of when they are found. We appreciate the opportunity to submit this proposal and look forward to working with you on this project. If you have any questions or require additional information pertaining to this proposal, please contact the undersigned at 858-320-2211. Sincerely, KLEINFELDER, INC. "444) Ronald C. Thomson eqt. Lord, CEG Operations Manager Environmental Services Manager RCT:mlm cc: Howard Mills Rudolph and Sletten Enclosures: Estimated Budget P-395S2!Sr)r41'(125.duc Paw:. ?. c)f 2 January 27, 2004 IBIT "13" ESTIMATED 1311DGET National City FIRE DEPARTMENT National City, California 02010 Lead Abatement Labor included as part of the Asbestos Abatement oversight. If Abatement contractor chooses to abate lead separately, oversight labor will be a change order. 02015 Asbestos Abatement $ 2,000.00 Includes 20 hours of Asbestos- and Lead-certifiednspector's labor; Up to 3 air -sampling pumps for air monitoring; and Laboratory analysis. 02200 Earthwork for Structures and Pavements $ 15,000.00 Includes 120 hours soil testing and observation; 20 hours Senior Engineer review and consultation; 16 hours footing inspection; Laboratory testing; and Final "As -Graded" report. 02225 Excavating, Backfilling, & Compacting for Utilities Includes 120 hours compaction testing; Laboratory testing; and - Preparation of compaction test summary report. 02510 Asphalt Concrete Paving $ 1,500.00 Includes 16 hours field testing; and Laboratory testing. 03301 Concrete Work Includes 80 hours sampling, testing, and special inspection; 16 hours sample pick-up; and 100 concrete compression tests. 04220 Concrete Masonry Units Includes 80 hours special inspection; 4 hours sarnple pick-up; and Laboratory testing. 05120 Structural Steel — Field Includes 80 hours field welding special inspection; and 10 hours non-destructive weld testing. 07500 Membrane Roofing Includes 48 hours observation $ 0.00 $ 10,000.00 $ 9,000.00 $ 7,000.00 $ 6,200.00 $ 3,300.00 Total Estimated Budget $ 54,000.00 l'-395,52151)14 )025 doe Page I of ('opyrigh12(1041Ueinfcldcr, inc .lanuary 27, 2004 ESTIMATED BUDGET National City FIRE DEPARTMENT National City, California Optional Extras 02514 Portland Cement Concrete Paving Includes 40 hours sampling, testing, and observation; 8 hours sample pick-up; and 40 concrete compression tests. 04220 Concrete Masonry Units — Retaining Walls Includes 160 hours testing and special inspection; 6 hours sample pick-up; and Laboratory testing. 05120 Structural Steel — Shop Includes 40 hours shop welding special inspection; and 8 hours non-destructive weld testing. 4,250.00 $ 3,300.00 P-395VISDI4P025.doc t'op_yright 2004 IClcinfcldcr, Inc. I';rgc 2 of 2 January 27, 2004