HomeMy WebLinkAbout2004 CON HMS Construction - Traffic Signal R Ave and Division Change Order #1CONTRACT CHANGE ORDER NO. 1 ORIGINAL DATE: August 31, 2004 PROJECT: TO: Division Street and R Avenue Traffic Signal Installation, Specification No. 02-1 Michael High, President HMS Construction, Inc. 1225 Linda Vista Drive San Marcos, CA 92069 DESCRIPTION OF CHANGE: This change order is written to increase the original bid quantities of line item 20. Original Contract Adjusted Contract No Item Unit Bid Q Unit Price Amount Adjusted �y Unit Price Amount 1 Mobilization 1LS $800.00 $800.00 1 $800.00 $800.00 2 Traffic Control 1 LS $3,780.00 $3,780.00 1 $3,780.00 $3,780.00 3 Install Traffic Detector Loops 31 EA $165.00 $5,115.00 31 $165.00 $5,115.00 Install Controller Unit 1 EA $475.00 $475.00 1 $475.00 $475.00 5 Install 2-inch Conduit 300 LF $11.00 $3,300.00 300 $11.00 $3,300.00 6 Install 3-inch Conduit 200 LF $13.20 $2,640.00 200 $13.20 $2,640.00 7 Install 4-inch Conduit 280 LF $17.20 $4,816.00 280 $17.20 $4,816.00 8 Install Type 5 Pull Boxes 12 EA $295.00 $3,540.00 12 $295.00 $3,540.00 9 Install Type 170E Controller 1 EA $11,900.00 $11,900.00 1 $11,900.00 $11,900.00 10 Install Type III Signal and Lighting Service Pedestal 1 LS $2,800.00 $2,800.00 1 $2,800.00 $2,800.00 11 Install Type 1-A (10') Pole as Specified on Plans 1 EA $2,801.00 $2,801.00 1 $2,801.00 $2,801.00 12 Install Type 1-A (10') Pole as Specified on Plans 1 EA $3,600.00 $3,600.00 1 $3,600.00 $3,600.00 13 Install Type 1-A (10') Pole as Specified on Plans 1 EA $3,600.00 $3,600.00 1 $3,600.00 $3,600.00 �4 Install Type 26-4-80 Pole as Specified on Plans. 1 EA $11,000.00 $11,000.00 1 $11,000.00 $11,000.00 Page 1 CONTRACT;CHANGE ORDER NO.;. Original Contract Adjusted Contract No Item Unit Bid Qty Unit Price Amount Adjusted Qty Unit Price Amount 15 Install Type 26-4-80 Pole as Specified on Plans. 1 EA $11,600.00 $11,600.00 1 $11,600.00 $11,600.00 16 Install Type 15 Pole as Specified on Plans. 1 EA $3,850.00 $3,850.00 1 $3,850.00 $3,850.00 17 Install Emergency Vehicle Pre-Emption Equipment 1 LS $9,100.00 $9,100.00 1 $9,100.00 $9,100.00 18 Install Type I Pedestrian Barricades 2 EA $325.00 $650.00 2 $325.00 $650.00 19 Remove and Replace 3" of Asphalt on 8" of Base 1750 SF $2.50 $4,375.00 1750 $2.50 $4,375.00 20 Traffic Striping 1 LS $8,000.00 $8,000.00 1 $9,158.85 $9,158.85 21 Remove and Replace Sidewalk 70 SF $7.00 $490.00 70 $7.00 $490.00 22 Install Street Name Signs 2 EA $860.00 $1,720.00 2 $860.00 $1,720.00 TOTALS $99,952.00 $101,110.85 DISCUSSION: Line Item No. 20 is being added to the contract to provide compensation to the contractor for supplying extra stop bars needed for additional safety to pedestrians. CONTRACT ADJUSTMENT: As a result of this change order the contract price is adjusted as follows: 1. The contract price is increased in the amount of S1,158.85 from the current contract price of S99,952.00 to a new contract price of $101,110.85. 2. The contract time is increased by forty-one (41) working days. The contract completion date was previously established as Friday, June 30, 2004. The new contract completion date is therefore established as Friday, August 27, 2004. This change order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above HMS Construction, Inc. will not be entitled to damages or additional payment for delays as described in the 1997 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 2 CONTRACT CHANGE ORDER NO. 1 RECOMMENDED FOR APPROVAL BY: Stephen M. Kirkpatrick Acting Director of Public Date Works/Engineering APPROVED r. Michael High, Pre HMS Construction Date Mr. Ronald Schneider, Vice President Date HMS Construction, Inc. Nick Inzunza, Mayor Date Page 3 RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on November 16, 2004, of the DIVISION STREET AND "R" AVENUF, TRAFFIC SIGNAL INSTALLATION, Work of improvement or portion of work of improvement under construction or alteration. on the premises located at Division Street and "R" Avenue, National City, CA 91950 Street Address City State Zip Code The undersigned owns the following interest or estate in said property: City of National City Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with HMS. CONSTRUCTION, INC. Name of Original Contractor The following work and material were supplied: Foreman, AC (finisher), Saw -Cutter, Operator and Laborers, Equipment: Bob Cat, Utility Trucks, Concrete Truck, and Crane. General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A Joint tenants, tenants in common, or other owners Dated: , 2004; Signature of Owner Nick Inzunza, Mayor City of National City, 1243 National City Blvd., National City, CA 91950 I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on , 2004, at , California. Signature: NICK INZUNZA, MAYOR FORMS/N00097-10 MEETING DATE City of National City, California COUNCIL AGENDA STATEMENT November 16, 2004 AGENDA ITEM NO. 5 ITEM TITLE Resolution of the City of National City authorizing the Mayor to approve Contract Change Order No. 1 in the amount of $1,158.85, accept the work and authorize the filing of a Notice of Completion for the Division Street and "R" Avenue Traffic Signal Installation PREPARED BY Alberto Griego EXPLANATION 336-4386 DEPARTMENT See attached Public Works/Engineering J Environmental Review X N/A Financial Statement 1 The total cost of the project is $101,110.85 for construction. Approved By: Finance Director i (9✓4- $125,000.00 was budgeted for this project in Account Nos. 109-409-500-598-6560, 109-409-500-598-6559, 109- 409-500-598-6558 Account No. STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION N/A ATTACHMENTS ( Listed Below ) 1. Resolution 3. Notice of Completion 2. Contract Final Balance hms Resolution No. -2,C)eLk^1-ac i9•99) RESOLUTION 2004 — 205 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY APPROVING CHANGE ORDER NO. 1 IN THE AMOUNT OF $1,158.85, ACCEPTING THE WORK AND AUTHORIZING THE FILING OF A NOTICE OF COMPLETION FOR THE DIVISION STREET AND "R" AVENUE TRAFFIC SIGNAL IMPROVEMENTS PROJECT (Engineering Specification No. 02-1) BE IT RESOLVED by the City Council of the City of National City, California, as follows: It appearing to the satisfaction of the Engineering Department that all work required to be done by HMS CONSTRUCTION, INC., Engineering Department Specification No. 02-1, for the Traffic Signal Improvements Project on Division Street and "R" Avenue has been completed, the City Council of National City hereby accepts said work and authorizes the filing of a Notice of Completion and orders that payment for said work be made in accordance with said contract. BE IT FURTHER RESOLVED that Change Order No. 1 in the amount of $1,158.85 is hereby approved. PASSED and ADOPTED this 16th day of November, 2004. NiCk Inz`unza, Mayor ATTEST: e-a Michael Dalla, C' y Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on November 16, 2004, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Ungab. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA CitClerk of the City of National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2004-205 of the City of National City, California, passed and adopted by the Council of said City on November 16, 2004. City Clerk of the City of National City, California By: Deputy EXPLANATION By Resolution No. 2003-155 The City Council of the City of National City awarded a contract in the amount of $99,952 to HMS .Construction Inc., for the Division Street and R Avenue Traffic Signal Improvements. Contract Change Order No. 1 was done to include stripping of a new stop bar and changing the stripping material to thermo plastic paint, which is longer lasting to road wear and weather, instead of normal stripping paint. This was due to an error in the original plan. A final inspection was completed and the work was found to be in accordance with the plans and specification. Therefore we recommend the approval of Contract Change Order Number 1, the acceptance of the work and the filing of a notice of completion for the Division Street and R Avenue Traffic Signal Installation. The current project cost of $99,952 is increased by $1,158.85 by this change order, to a final cost of $101,110.85. City of National City Office of the City Clerk 1243 National City Boulevard, National City, California 91950-4397 Michael R. Della, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 November 29, 2004 Gregory J. Smith Assessor / Recorder / County Clerk County of San Diego Post Office Box 1750 San Diego CA 92112-4147 Dear Mr. Smith: We are submitting the following document in duplicate for recording: NOTICE OF COMPLETION: Division Street and "R" Avenue Traffic Signal Installation. Please note the recording information on the duplicate copy provided, and return it to the Office of the City Clerk. Sincerely, aktq V°V`I Martha L Alvarez, CMC Deputy City Clerk /mla Enclosure cc: PW/ENG File No. C2003-56 ® Recycled Paper PLEASE COMPLETE THIS INFORMATION. RECORDING REQUESTED BY: CITY CLERK OF NATIONAL CITY 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 AND WHEN RECORDED MAIL TO: CITY CLERK OF NATIONAL CITY 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 7t, THE ORIGINAL OF THIS DOCUMENT WAS RECORDED ON DEC 10, 2004 DOCUMENT NUMBER 2004-1163297 GREGORY J. SMITH, COUNTY RECORDER SAN DIEGO COUNTY RECORDERS OFFICE TIME: 8.52 AM NOTICE OF COMPLETION: DIVISION STREET AND "R" AVENUE TRAFFIC SIGNAL INSTALLATION (Please fill in document title(s) on the this line) THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION RESO 2004-205 (Additional recording fee applies) FILE C2003-56 6/94 Rec.Fonn /R25 C. )CrC RECORDING REQUESTED BY WHEN RECORDED MAIL TO: NAME: CITY OF NATIONAL CITY ADDRESS: 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on November 16, 2004, of the DIVISION STREET AND "R" AVENUE TRAFFIC SIGNAL INSTALLATION, Work of improvement or portion of work of improvement under construction or alteration. on the premises located at Division Street and "R" Avenue, National City, CA 91950 Street Address City State Zip Code The undersigned owns the following interest or estate in said property: City of National City Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with HMS CONSTRUCTION, INC• Name of Original Contractor The following work and material were supplied: Foreman, AC (finisher), Saw -Cutter, Operator and J,ahorers, Equipment. Bob Cat,1ltility Trucks, Concrete Truck, and Crane General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A Joint tenants, tenants in coz�rnon, or other oyfners Dated: November 16 , 2004; Signature of Oder l\Tick h zu'Tfza, Mayor City of National City 1243 National City Blvd., National City, CA 91950 I, the undersigned, say: I have read the foregoing Notice of Completion and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on November 16 , 2004, at National City , California. Signature: NICK INZUNZA, MAYOR FORMS/N00097- I 0