Loading...
HomeMy WebLinkAbout2005 CON Bond Blacktop - Slurry Seal Project Change Order #1CONTRACT CHANGE ORDER NO. 1 DATE: 2/10/05 PROJECT: National City Slurry Seal Project, FY 03-04, Specification No. 03-1 TO: Edward Dillon, President Bond Blacktop Inc. P.O. Box 616 Union City, CA 94587 DESCRIPTION OF CHANGE: This change order is written to increase work item number 5 to the contract (shown below). Al Current Contract Adjusted Contract (CO #1) No Item Unit Bid Qty Unit Price Amount Bid Qty Unit Price Amount 1 Mobilization LS 1 $5,000.00 $5,000.00 1 $5,000.00 $5,000.00 2 Ti atfic Control LS 1 $4,000.00 $4,000.00 1 $4,000.00 $4,000.00 3 Clearing and Grubbing LS 1 $500.00 $500.00 1 $500.00 $500.00 4 Unclassified Excavation CY 20 $24.15 $483.00 20 $24.15 $483.00 5 Remove and Replace Street Section SF 22783 $1.95 $44,426.85 27328 $1.95 $53,289.60 6 Crack Seal LS 1 $15,645.0 0 $15,645.00 1 $15,645.00 $15,645.00 7 Slurry Seal Type I SF 668251 $0.044 $29,403.04 668251 $0.044 $29,403.04 8 Traffic Striping LS 1 $15,645.0 0 $15,645.00 1 $15,645.00 $15,645.00 9 Remove and Replace Curb and Gutter LF 34 $61.95 $2,106.30 34 $61.95 $2,106.30 Totals $117,209.19 $126,071.94 DISCUSSION: The increase in square footage of line item number 5 was needed due to deteriorating conditions in the base/sub-base of the pavement encountered during crack sealing operations and demolition of the existing pavement. CONTRACT ADJUSTMENT: As a result of this change order the contract price is adjusted as follows: 1. The contract price is increased in the amount of $8,862.75, from .the current contract price of $117,209.19 to a new contract price of $126,071.94. 2. The contract time is increased by five (5) working days. The contract completion date was previously established as Wednesday, January 26, 2005. Page 1 CONTRACT CHANGE ORDER NO. 1 The new contract completion date is therefore established as Wednesday, February 2, 2005. This change order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Bond Blacktop, Inc. will not be entitled to damages or additional payment for delays as described in the 1997 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. RECOMMENDED FOR APPROVAL BY: Alberto Gne_o, Associa CivjkEn.'neer APPROVED BY: Pcithij Mr. Edward Dillon, President Bond Blacktop, Inc. 4/5)35 Date Stephen M. Kiatrick, City Engineer Dat ic/6s— Page 2 City of National City, California COUNCIL AGENDA STATEMENT AilEETING DATE March 1, 2005 AGENDA ITEM NO. ITEM TITLE Resolution of the City of National City approving Change Order Number 1 for National City Slurry Seal Project in the amount of $8,862.75, Spec. No. 03-1 for the removal and replacement of an additional 4,545 square feet; and authorizing the City Engineer to sign the change order PREPARED BY Alberto Griego DEPARTMENT' Engineering 336-4386 9 EXPLANATION The City of National City is currently doing the slurry seal of several streets in the city to maintain and extend the life of existing pavements. City staff is recommending that the item for removal and replacement of street section be extended for another 4,545 square feet due to deteriorating conditions in the base/sub-base of the pavement encountered during crack sealing and demolition. The total amount of Contract Change Order Number 1 is $8,862.75, increasing the current cost of the project from $117, 209.19 to $126,071.94. Environmental Review Financial Statement X N/A The total cost of Change Order One is $8,862.7 This amount is within the estimated budget for Funding is available through Account Number STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSIOIYRECOMMENDATION N/A. ATTACHMENTS ( Listed Below ) 1. Resolution 2. Contract Change Order No. 1 A-200 i9:99, 5. this project of $150,000. / 109-409-500-598-6102 V A Approved By: Finance Director ccount No. Resolution No. 7 3. Invoice from Bond Blacktop bond RESOLUTION NO. 2005 — 42 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NO. 1 WITH BOND BLACKTOP, INC. IN THE AMOUNT OF $8,862.75 FOR REMOVAL AND REPLACEMENT OF AN ADDITIONAL 4,454 SQUARE FEET OF STREET SECTIONS DUE TO DETERIORATING CONDITIONS (ENGINEERING SPECIFICATION 03-01) WHEREAS, the contract for the National City Street Slurry Seal Project was awarded to Bond Blacktop, Inc. on April 6, 2004, by the adoption of Resolution No. 2004-47; and WHEREAS, Change Order No. 1, in the amount of $8,862.75, will provide for removal and replacement of an additional 4,454 square feet of street sections due to deteriorating conditions. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 1 with Bond Blacktop, Inc. in the amount of $8,862.75 to provide for removal and replacement of an additional 4,454 square feet of street sections due to deteriorating conditions. PASSED and ADOPTED this 1st day of March, 2005. ATTEST: /Li el Dalla, Cit Clerk APPROVED AS TO FORM: �..-.� George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on March 1, 2005, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: By: NICK INZUNZA Ci Clerk of the Cit yJ'of National City, California Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2005-42 of the City of National City, California, passed and adopted by the Council of said City on March 1, 2005. City Clerk of the City of National City, California By: Deputy