Loading...
HomeMy WebLinkAbout2005 CON Dokken Engineering - Capacity Improvements Plaza BlvdFebruary 14, 2005 Dokken Engineering 9665 Chesapeake Drive, Suite 435 San Diego, CA 92123 Attention: Mr. Kirk Bradbury, Project Manager SUPPLEMENTAL AGREEMENT NO. 3 Project: Plaza Boulevard Widening, Engineering Specifications No. 99-9 Subject: Supplemental Agreement No. 3 — Develop a Visual Impact Assessment for the Plaza Boulevard Widening Project, Update Project Drawings and Cost Estimates per the VIA, and Incorporate the Visual Impact Analysis into the Draft Environmental Document This is Supplemental Agreement No.3 to the original agreement dated February 12, 2002 between the City of National City and Dokkcn Engineering, the consultant to provide civil engineering services for the Plaza Boulevard Widening Project, Specification No.99-9. This supplemental agreement provides for an additional not -to -exceed $ 43,650 for a) Developing a Visual Impact Assessment (VIA) for the Plaza Boulevard Widening project; b) Updating design drawings, right-of-way requirements drawings, construction cost estimates and right-of-way acquisition cost estimates per the VIA; and c) Incorporating the VIA into the draft Environmental Document for the project. The purpose of a) Developing a Visual Impact Assessment is to comply with the determination by Caltrans that a VIA is required for the project. The purpose of b) Updating design drawings, right-of- way requirements drawings and cost estimates per the VIA is to properly account for revisions to the project footprint and project cost changes as a result of the VIA. The purpose of c) Incorporating the VIA into the draft Environmental Document is fulfill the request by Caltrans that a VIA be included within the draft Environmental Document. Details of the scope of work and cost estimates for this supplemental agreement are shown on the attached Exhibit "A". Proposed Contract Amendment No. 3: Original Contract: Amendment No. 1: Amendment No. 2: Amendment No. 3: Revised Contract Amount: Prepared by n Daneshfar City Project Manager Acceptance by: rk Bra i bury onsultant Project Mj,`ager Date: 3A $309,701 $ 14,148 $123,388 $ 43,650 $ 490,887 Date: yioloc Reviewed by: Stephen Kir . rick City Engine Approve Nick Innzun Mayor of City of National city Date: 3 Date: x DOKKEN ENGINEERING w w w. do k k enengi nee ri n g.e nm February 14, 2005 Din Daneshfar, P.E. City of National City Department of Public Works 1243 National City Boulevard National City, CA 91950-4301 EXHIBIT 'A' RE: Plaza Boulevard Widening Project Request for Agreement Amendment No. 3 — Develop Visual Impact Assessment Dear Mr. Daneshfar: Dokken Engineering is under agreement with the City of National City to develop preliminary design plans, environmental documents and cost estimates for the widening of Plaza Boulevard between Highland Avenue and Euclid Avenue. This letter has been written to request Agreement Amendment No. 3 for unexpected effort in support of the project. This letter documents the additional services required of Dokken Engineering in support of the project. The additional effort is due to the determination by Caltrans to require the preparation of a Visual Impact Assessment (VIA) in support of the project's environmental document. Below describes details of the additional services required. The attached table itemizes the additional fees requested. Prepare a Visual Impact Assessment On November 1, 2004, Caltrans informed National City and Dokken Engineering that a VIA will be required for the Plaza Boulevard Widening project. The VIA must follow the guidelines outlined in the publication "Visual Impact Assessments for Highway Projects", Federal Highway Administration (FHWA), March 1981. The following VIA components will be developed by Dokken Engineering in collaboration with Caltrans District 11 Landscape Architecture staff. • Define the project setting and viewshed • Identify key views for visual assessment • Analyze existing visual resources and viewer response • Depict the visual appearances of project alternatives • Assess the visual impacts of project alternatives • Propose methods to mitigate adverse visual impacts In order to complete the above VIA components, the following tasks are anticipated: 1. Attend Meetings with Caltrans Design Staff 2. Attend Meetings with National City Staff 3. Prepare Meeting Agendas, Meeting Minutes, Exhibits 4. Prepare Visual Impact Assessment Report 9665 CHE APEAKE DRIVF, SUITE 435 U SAX Dii :o, CA 921123-1.367 TEL:858-514-8377 FAX:858-514-8608 5. Prepare Visual Impact Report Graphics Please see the attached Cost Proposal Summary for the actual hours necessary for the development of a Visual Impact Assessment. Update Design Drawings, Right -of -Way Requirements Drawings, and Cost Estimates per the Visual Impact Assessment The VIA includes recommendations for areas adjacent the proposed widened Plaza Boulevard for planting, irrigation and hardscape improvements to provide visual mitigation for the proposed roadway widening. The areas recommended for use as visual mitigation areas were not previously identified in design drawings and right-of-way requirements drawings. The design drawings and right- of-way requirements drawings will be updated per the recommendations in the VIA. Also, the project construction cost estimates and right-of-way acquisition cost estimates will be updated accordingly. The following tasks are anticipated to update the project drawings and cost estimates per the VIA. 1. Update Design Drawings and Right -of -Way Requirements Drawings per the VIA 2. Update Construction Cost Estimates and Right -of -Way Cost Estimates per the VIA Please see the attached Cost Proposal Summary for the estimated hours necessary to revise the design drawings, right-of-way requirement drawings and cost estimates. Update the Environmental Document with the Visual Impact Assessment Per Caltrans guidance, the draft Environmental Document will be updated by EDAW to reflect the findings of the Visual Impact Assessment. The draft Environmental Document will be updated to be consistent with the Visual Impact Assessment. The following task is anticipated to include the findings of the VIA within the draft Environmental Document. 1. Update the draft Environmental Document per the VIA Please see the attached Cost Proposal Summary for the estimated hours necessary to update the draft Environmental Document per the VIA. Please review the attached Cost Proposal Summary and let us know if we may provide any additional information or answer any questions. Thank you for your consideration on our request for the execution of Amendment No. 3 to the agreement between the City of National City and Dokken Engineering for the Plaza Boulevard Widening project. An updated project schedule, dated February 14, 2005 is attached. Sincerely, Kirk Bradbury, P.E. Project Manager Attachments: Cost Proposal Sununary, Amendment No. 3, 2/14/05 Project Schedule, 2/14/05 EXHIBIT 'A' 2/14/2005 THE CITY OF NATIONAL CITY PLAZA BOULEVARD WIDENING PRELIMINARY DESIGN PLANS, ENVIRONMENTAL DOCUMENTS AND COST ESTIMATES COST PROPOSAL SUMMARY AMENDMENT NO. 3 COST PROPOSAL SUMMARY TOTALS: 0.0% $39,758 $3,892 $43,650 Plaza Boulevard Widening EXHIBIT 'A' 2/14/2005 FEE PROPOSAL DIRECT COSTS (LABOR NAME FUNCTION HOURS RATE AMOUNT Kirk Bradbury Project Manager 70 120 $51.00 $3,570.00 Gerard Lumabas, Jeremy LaHaye Associate Engineer, Civil /Structural $35.00 $4,200.00 Kristina Dominguez, Jeannie Pham Assistant Engineer, Civil /Structural 108 $26.25 $2,835.00 Eric Vaughan Detailer, Civil /Structural 74 $24.25 $1,794.50 Reina Sawyer Word Processing /Intern 6 $24.00 $144.00 TOTAL HOURS INDIRECT COSTS (OVERHEAD) OVERHEAD 378 TOTAL LABOR 183.00% $12,543.50 DIRECT COSTS Billed at Actual Cost TOTAL OVERHEAD $22,954,61 ITEM I QUANTITY UNIT UNIT COST AMOUNT $0.00 $0.00 FEE (PROFIT) PERCENTAGE TOTAL DIRECT COSTS $0.00 12% FEE $4,259.77 DOKKEN ENGINEERING TOTAL COST $39,757.88 :d 1 Z3,.. ."i N Plaza Boulevard Widening EXHIBIT 'A' 2/14/2005 FEE PROPOSAL DIRECT COSTS (LABOR NAME FUNCTION HOURS RATE AMOUNT Ray Hrenko Senior Associate 12 $52.88 $634.56 Marty WatsonNalarie Yruretagoyena Environmental Analyst 34 $22.22 $755.48 TOTAL HOURS INDIRECT COSTS (OVERHEAD) OVERHEAD 46 TOTAL LABOR 150.00% $1,390.04 DIRECT COSTS Billed at Actual Cost TOTAL OVERHEAD $2,085.06 ITEM QUANTITY UNIT UNIT COST AMOUNT Item 0 Unit $0.00 $0.00 FEE (PROFIT) PERCENTAGE TOTAL DIRECT COSTS $0.00 12% FEE $417.01 TOTAL COST $3,892.11 DOKKEN ENGINEERING wnw.4okk Oneneineerin 6.nnm EXHIBIT 'A' PROJECT FEE PROPOSAL City of National City Plaza Boulevard Widening Preliminary Design Plans, Environmental Documents and Cost Estimates Fees by Task and Person Tasks by Project Management, Preliminary Design Plans, Environmental Documents co and Cost Estimates Amendmentnn���No. 3 _ '"' ii n'. d Detailer, Civil /Structural '41,11 Word Processing/Intern j, T° - jjjj Senior Associate am s i- o Project Manager Fsociate Engineer, civil !Structura Assistant Engineer, Civil /Structural 1- ..-Y ^4'1/4i't m= . fM rt�"{ 31 ±ip 1e _^rr.k ... = ACTti al@ Attend Meetings with Ca'trans ign ff 1.02 Attend MePrepare etings withNationalMcity MIMI = Z-®- ' 1.031.01 Agendas, Minutes, Exhibits 0 20 1.04 Prepare Visual Impact Assessment Report P1 68 40 :liED 0 146 1.05 Prepare Visual Impact Report Graphics 8 20 40 66 134 a 134 TOTAL HOURS -TASKI 64 108 92 66 - $24.25 $1,600.50 $2,928.92 6 $24.00 S144.00 338 $11,203.50 0 $52.88 $0.00 0 $22.22 $0.00 0 336 $51.00 $35.00 $3,780.00 $6,917.40 $26.25 $2,415.00 $4,419.45 $0.00 $0.00 TOTAL DIRECT LABOR $3,264.00 $5,973.12 $11,203.50 $20,502.41 TOTAL MULTIPLIERS $263.52 $20,502.41 $0.00 $0.00 TOTAL FEES $1,108.45 $1,283.6• $820.1 $543.53 $48.90 $3,804.7 $0.00 $0.00 $0.0D $3,804.71 TOTAL COST - TASK I $10,345.57 $11,981. i• $7,654. 5 $5,072.94 $456.42 $35,510.6 $0.00 $0.00 $4#0.00 $35,510.61 {{ }°?fit 1'(PDAfl O S ®"" ItT e -; eeel ". it '""x /�' " 2 i k "_.LL°r $& 4 $i##f 1t 8 1f.r-:• is 8 >;[ '�' kk$ $ !.'k' 22 ��,3,#ftP �' r `� 0 i e.,.:. ,@ • �.i6. i a �;9I' pate i ign rrawmgsa • •ig to -'ay •equirements 201 Drawings per VIA 22 t p. ate • nstruetmn Cast snmate and --i"' cqu s ,on 2.02 Cast Estimate per VIA 2 4 8 14 0 14 TOTAL HOURS - TASK 2 4 8 $35.00 16 $26.25 8 $24.25 0 $24.00 36 0 $52.88 0 $22.22 0 36 HOURLY RATE $51.00 TOTAL DIRECT LABOR $204.00 $280.00 $420.00 $194.00 $0.00 $1,098.00 $0.00 $0.00 $0.00 $1,098.00 TOTAL MULTIPLIERS $373.32 $512.40 $758.60 $355.02 $0.00 $2,009.3 $0.00 $0.00 $0.00 $2,009.34 TOTAL FEES $69.28 $95.09 $142.63 $65.88 $0.OD $372.8t $0.00 $0.00 $0.00 $372.88 TOTAL COST - TASK 2 $646.60 $887.49 $1,331.23 $614.90 $0.00 $3,480.2 $0.00 $0.00 $0.00 $3,480.22 5 a IpteY #t{i I l l`r 1A1B i ti !4'.,,$AiI, 2UNIEMTPEfO,ifA �,-. _ , «,} ag 6 12 34 3 #{ 46 .xvtwrtt-c:. 701 Update the Draft Enwronmental Document per VIA 52 TOTAL HOURS -TASKS 0 0 0 6 12 34 46 52 HOURLY RATE $51.00 $35.00 $26.25 $24.25 $24.00 $52.88 $2222 TOTAL DIRECT LABOR $102.00 $140.00 $0.00 $0.00 $0.00 $242.00 $634.56 $75548 $1,390.04 $1,632.04 TOTAL MULTIPLIERS $186.66 $256.20 $0.00 $0.00 $0.00 $442.86 $951.84 $1,133.22 $2,085.06 $2,527.92 TOTAL FEES $34.64 $47.54 $0.00 $0.00 $0.00 582.18 5190.37 5226.64 $417.01 $499.20 TOTAL COST -TASKS 8323.30 544374 $0.00 $0 00 $0.00 $767.04 $1,776.77 $2,11534 $3,892.11 $4,659.16 TOTAL PROJECT HOURS 70 120 108 74 6 378 12 34 46 424 TOTAL DIRECT LABOR TOTAL MULTIPLIERS $3,570.00 56,533. 10 $4,200.00 87,68600 52 835.00 55188.05 51,794 50 $3,28394 $144.00 8263.52 512 543 50 5634.56 52295461 8951-84 $755.48 $1,390.04 $13,933.54 $1,133 22 82,085.06 $25,039.67 FEES $3312.32 �� 43,649.99 TOTAL PROJECT COST 11,315.47 $11 3i5.47 $13,312.32 $43,649.99 Prepared by Dokken Engineering 2J 14/05 PLAZA BOULEVARD SCHEDULE THROUGH CONSTRUCTION (ASSUMES A VIA IS REQUIRED AND ASSUMES ACCELERATED REVIEW AND REVISION PERIODS) ID Task Name Duration Start Finish % Complete Predecessors 1 Schedule Through Construction 1355 days Mon 5/12/03 Fri 7/18/08 48% 2 Environmental Approval 619 days Mon 5/12/03 Thu 9/22/05 76% 3 Caltrans Comments on Tech Studies & EA/IS 4 edays Mon 5/12/03 Fri 5/16/03 100% 4 EDAW Revises Tech Studies & EA/IS 23 edays Mon 5/19/03 Wed 6/11/03 100% 3 5 National City Review 14 edays Wed 6/11/03 Wed 6/25/03 100% 4 6 EDAW Revises Tech Studies & EA/IS 7 edays Wed 6/25/03 Wed 7/2/03 100% 5 7 Caltrans Review 30 edays Wed 7/2/03 Fri 8/1/03 100% 6 8 EDAW Revises Tech Studies & EA/IS 14 edays Fri 8/1/03 Fri 8/15/03 100% 7 9 Caltrans Reviews & Approves for FHWA Submittal 7 edays Fri 8/15/03 Fri 8/22/03 100% 8 10 FHWA Review 158 edays Fri 8/22/03 Tue 1/27/04 100% 9 11 Caltrans Independent Review of FHWA comment 50 edays Tue 1/27/04 Wed 3/17/04 100% 10 12 Coordinate with Caltrans Design for Additional Traffic Studies 245 days Fri 3/12/04 Thu 2/17/05 94% 13 Meet with Caltrans Design to Determine Additional Traffic Studies 66 edays Fri 3/12/04 Mon 5/17/04 100% 14 Determine Additional Traffic Studies Required 30 edays Mon 6/21/04 Wed 7/21/04 100% 13 15 Perform Additional Traffic Studies per Caltrans Design 151 days Wed 7/21/04 Thu 2/17/05 92% 16 Provide National City with Amendment Request 19 edays Wed 7/21/04 Mon 8/9/04 100% 14 17 Receive National City NTP for Additional Traffic Studies 1 eday Tue 8/10/04 Wed 8/11/04 100% 16FS+1 day 18 Revise Traffic Studies for 0.5% Growth/Grove Street/Horizon Year 2030 26 edays Thu 8/12/04 Tue 9/7/04 100% 17FS+1 day 19 National City Review 7 edays Tue 9/7/04 Tue 9/14/04 100% 18 20 LLG Address National City Review Comments 1 eday Tue 9/14/04 Wed 9/15/04 100% 19 21 Caltrans Review 21 edays Wed 9/15/04 Wed 10/6/04 100% 20 22 LLG Address Caltrans Review Comments 14 edays Wed 10/6/04 Wed 10/20/04 100% 21 23 Caltrans Review 18 edays Thu 10/21/04 Mon 11/8/04 100% 22FS+1 day 24 LLG Address Caltrans Review Comments 31 edays Mon 11/8/04 Thu 12/9/04 100% 23 25 Caltrans Review 5 edays Thu 12/9/04 Tue 12/14/04 100% 24 26 LLG Address Caltrans Review Comments 30 edays Tue 12/14/04 Thu 1/13/05 100% 25 27 Caltrans Approves Traffic Studies 35 edays Thu 1/13/05 Thu 2/17/05 50% 26 28 Develop Visual Impact Assessment (VIA) 83 days Mon 11/1/04 Thu 2/24/05 93% 29 Determine a VIA is Required 0 edays Mon 11/1/04 Mon 11/1/04 100% 30 Prepare Draft VIA 45 days Mon 11/15/04 Mon 1/17/05 100% 31 Conduct VIA Kick -Off Meeting 0 edays Mon 11/15/04 Mon 11/15/04 100% 32 Dokken Prepare Draft VIA 25 edays Mon 11/15/04 Fri 12/10/04 100% 31 33 Caltrans Reviews and Assists with VIA 28 edays Fri 12/10/04 Fri 1/7/05 100% 32 34 Dokken Revise Draft VIA 10 edays Fri 1/7/05 Mon 1/17/05 100% 33 35 Agency Review Draft VIA 5 days Mon 1/17/05 Mon 1/24/05 100% PLAZA BOULEVARD SCHEDULE Page 1 2/14/05 THROUGH CONSTRUCTION Schedule thru Const_18.mpp PLAZA BOULEVARD SCHEDULE THROUGH CONSTRUCTION (ASSUMES A VIA IS REQUIRED AND ASSUMES ACCELERATED REVIEW AND REVISION PERIODS) ID Task Name Duration Start Finish % Complete Predecessors 36 Agency Review Draft VIA 7 edays Mon 1/17/05 Mon 1/24/05 100% 30 37 Prepare Final VIA 8 days Mon 1/24/05 Thu 2/3/05 100% 38 Respond to Agency Review of Draft VIA 7 edays Mon 1/24/05 Mon 1/31/05 100% 36 39 Prepare Final VIA 3 edays Mon 1/31/05 Thu 2/3/05 100% 38 40 Agency Review Final VIA 5 days Thu 2/3/05 Thu 2/10/05 100% 41 Agency Review Final VIA 7 edays Thu 2/3/05 Thu 2/10/05 100% 37 42 Prepare Final Approval VIA 7 days Thu 2/10/05 Mon 2/21/05 64% 43 Respond to Agency Review of Final VIA 7 edays Thu 2/10/05 Thu 2/17/05 100% 40 44 Prepare Final Approval VIA 4 edays Thu 2/17/05 Mon 2/21/05 0% 43 45 VIA Approval 3 edays Mon 2/21/05 Thu 2/24/05 0% 42 46 Revise Draft ED per Traffic Revisions 74 days Mon 11/8/04 Fri 2/18/05 99% 47 EDAW Revises Tech Studies & ENIS 29 edays Mon 11/8/04 Tue 12/7/04 100% 23 48 Caltrans and National City Review 66 edays Tue 12/7/04 Fri 2/11/05 100% 47 49 EDAW Revises Tech Studies & EMS 7 edays Fri 2/11/05 Fri 2/18/05 90% 48 50 Revise Draft ED per Visual Impact Assessment 20 days Fri 2/18/05 Fri 3/18/05 0% 51 EDAW Revises Tech Studies & ENIS 11 edaysl Fri 2/18/05 Tue 3/1/05 0% 40,49 52 Caltrans and National City Review 10 edays Tue 3/1/05 Fri 3/11/05 0% 51 53 EDAW Revises Tech Studies & ENIS 7 edays Fri 3/11/05 Fri 3/18/05 0% 52 54 Caltrans Reviews & Approves for FHWA Submittal 7 edays Fri 3/18/05 Fri 3/25/05 0% 49,53,45 55 FHWA Review/Approval for Public Circulation 21 edays Fri 3/25/05 Fn 4/15/05 0% 54 56 Public Review 32 edays Fri 4/15/05 Tue 5/17/05 0% 55 57 Public Meeting 0 edays Wed 5/4/05 Wed 5/4/05 0% 565S+13 days 58 EDAW Prepares Preliminary Final ENIS 14 edays Tue 5/17/05 Tue 5/31/05 0% 56 59 Caltrans and National City Review 10 edays Tue 5/31/05 Fri 6/10/05 0% 58 60 EDAW Revises Preliminary Final ENIS 11 edays Fri 6/10/05 Tue 6/21/05 0% 59 61 Caltrans Reviews & Approves for FHWA Submittal 10 edays Tue 6/21/05 Fri 7/1/05 0% 60 62 FHWA Review 21 edays Fri 7/1/05 Fri 7/22/05 0% 61 63 EDAW Prepares Final ENIS 11 edays Fri 7/22/05 Tue 8/2/05 0% 62 64 Caltrans and National City Review 10 edays Tue 8/2/05 Fri 8/12/05 0% 63 65 EDAW Revises Final EA/IS 11 edays Fri 8/12/05 Tue 8/23/05 0% 64 66 Caltrans Reviews & Approves for FHWA Submittal 6 edays Tue 8/23/05 Mon 8/29/05 0% 65 67 National City Signs MND 10 edays Mon 8/29/05 Thu 9/8/05 0% 66 68 FHWA Review/Approval 21 edays Mon 8/29/05 Mon 9/19/05 0% 66 69 FHWA Signs FONSI 3 edays Mon 9/19/05 Thu 9/22/05 0%' 68 70 Combined Project Study Report/Project Report (PSR/PR) 342 days Mon 8/9/04 Tue 11/29/05 82% PLAZA BOULEVARD SCHEDULE Page 2 2/14/05 THROUGH CONSTRUCTION Schedule thru Const_18.mpp PLAZA BOULEVARD SCHEDULE THROUGH CONSTRUCTION (ASSUMES A VIA IS REQUIRED AND ASSUMES ACCELERATED REVIEW AND REVISION PERIODS) ID Task Name Duration Start Finish % Complete Predecessors 71 Provide National City with Amendment Request 1 eday Mon 8/9/04 Tue 8/10/04 100% 72 Receive National City NTP for Additional for PSR/PR 30 edays Tue 8/10/04 Thu 9/9/04 100% 71 73 Prepare Administrative Draft PSR/PR 44 days Thu 9/9/04 Wed 11/10/04 100% 72 94 Agency Review Administrative Draft PSR/PR 56 days Fri 11/12/04 Mon 1/31/05 100% 95 Agency Review Preliminary PSR/PR 80 edays Fri 11/12/04 Mon 1/31/05 100% 73FS+3 days 96 Prepare Draft PSR/PR 52 days Fri 12/17/04 Mon 2/28/05 72% 97 Respond to Agency Review of Preliminary PSR/PR 21 edays Mon 1/31/05 Mon 2/21/05 80% 94 98 Develop Draft Design Exception Fact Sheet for Corner Sight Distance 40 edays Fri 12/17/04 Wed 1/26/05 100% 99 Caltrans Review of Draft Fact Sheet 22 edays Wed 1/26/05 Thu 2/17/05 50% 98 100 Revise Draft Design Exception Fact Sheet 4 edays Thu 2/17/05 Mon 2/21/05 0% 99 101 Prepare Draft PSR/PR 7 edays Mon 2/21/05 Mon 2/28/05 0% 97 102 Agency Review of Draft PSR/PR 43 days Mon 2/28/05 Thu 4/28/05 0% 103 Agency Review of Draft PSR/PR 59 edays Mon 2/28/05 Thu 4/28/05 0% 100,101 104 Prepare Final PSR/PR 20 days Thu 4/28/05 Thu 5/26/05 0% 105 Respond to Agency Review of Draft PSR/PR 21 edays Thu 4/28/05 Thu 5/19/05 0% 102 106 Prepare Final PSR/PR 7 edays Thu 5/19/05 Thu 5/26/05 0% 105 107 Agency Review Final PSR/PR 44 days Thu 5/26/05 Wed 7/27/05 0% 108 Agency Review Final PSR/PR 62 edays Thu 5/26/05 Wed 7/27/05 0% 104 109 Prepare Final Approval PSR/PR 20 days Wed 7/27/05 Wed 8/24/05 0% 110 Respond to Agency Review of Final PSR/PR 21 edays Wed 7/27/05 Wed 8/17/05 0% 107 111 Prepare Final Approval PSR/PR 7 edays Wed 8/17/05 Wed 8/24/05 0% 110 112 Agency Review of Final Approval PSR/PR 68 days Wed 8/24/05 Mon 11/28/05 0% 113 Agency Review of Final Approval PSR/PR 61 edays Wed 8/24/05 Mon 10/24/05 0% 109 114 Respond to Agency Review of Final Approval PSR/PR 14 edays Mon 10/24/05 Mon 11/7/05 0% 113 115 PSR/PR Approval 21 edays Mon 11/7/05 Mon 11/28/05 0% 114 116 PSR/PR Approval Date 1 eday Mon 11/28/05 Tue 11/29/05 0% 115 117 Cooperative Agreement (PS&E Oversight) 173 days Thu 4/28/05 Tue 12/27/05 0% 118 Caltrans Prepares Draft Cooperative Agreement 32 edays Thu 4/28/05 Mon 5/30/05 0% 102 119 National City Review of Draft Cooperative Agreement 32 edays Mon 5/30/05 Fri 7/1/05 0% 118 120 National City and Caltrans Negotiate Draft Cooperative Agreement 31 edays Fri 7/1/05 Mon 8/1/05 0% 119 121 Proposed Final Cooperative Prepared 30 edays Mon 8/1/05 Wed 8/31/05 0% 120 122 National City Approves Cooperative Agreement 15 edays Mon 11/28/05 Tue 12/13/05 0% 121,115 123 Caltrans Approves Cooperative Agreement 14 edays Tue 12/13/05 Tue 12/27/05 0% 122 124 Project Design (Plans Specifications, and Estimate (PS&E) 330 days Mon 9/19/05 Mon 12/25/06 0% 68 139 Right of Way Appraisal and Acquisition 453 days Tue 5/17/05 Fri 2/9/07 0% PLAZA BOULEVARD SCHEDULE Page 3 2/14/05 THROUGH CONSTRUCTION Schedule thru Const_18.mpp AdEETING DATE April 5, 2005 City of National City, California COUNCIL AGENDA STATEMENT AGENDA ITEM NO. 5 ITEM TITLE A Resolution of the City Council of National City approving Supplemental Agreement Number Three with Dokken Engineering for $43,650 to provide additional engineering services (developing a Visual Impact Assessment) for the Capacity Improvement of Plaza Boulevard project, and authorizing the Mayor to execute the Supplemental Agreement PREPARED BY Din Daneshfar DEPARTMENT Public Works/Engineering 336-4387 EXPLANATION See attached explanation. ♦ Environmental Review X N/A Financial Statement Approved By: Finance Director The amount for the Supplemental Agreement No. Two is $43,650. Funding is available through Account Nos. 312-409-500-598-6569 and 307-409-500-598-6569. yiovie,4 a.i r414 ✓ .472307Account No STAFF RECOMMENDATION Adopt the Resolution. 1 BOARD / COMMIS - 1 c N RECOMMENDATION N/A ATTACHMENTS ( Listed Below ) 1. Resolution Resolution No. ZOO Si 2. Proposed Supplemental Agreement No. Three A-200 (9•99) A Resolution of the City Council of National City approving Supplemental Agreement Number Three with Dokken Engineering for $43,650 to provide additional engineering services (developing a Visual Impact Assessment) for the Capacity Improvement of Plaza Boulevard project, and authorizing the Mayor to execute the Supplemental Agreement On April 16, 2002, a contract was awarded to Dokken Engineering for providing professional services regarding the Capacity Improvements on Plaza Boulevard from Highland Avenue to Euclid Avenue, Specification No. 99-9 for the amount at $309,701. On January 7, 2003, the Supplemental Agreement Number One was approved to prepare additional parking analysis and floodplain study along Plaza Boulevard for the amount at $14,148. On September 7, 2004, the Supplemental Agreement Number Two was approved to prepare additional parking analysis and floodplain study along Plaza Boulevard for the amount at $123,388. This is Supplemental Agreement Number Three to the original contract agreement between the City of National City and Dokken Engineering, the consultant, to provide additional civil engineering services. I'he major components of the extended project scope is due to recent requirement from the California Department of Transportation (Caltrans) for developing a Visual Impact Assessment (VIA) for the Plaza Boulevard Widening project. Minor changes are needed on the street design plans in order to accommodate the City's current Community/Private Development projects along Plaza Boulevard. This supplemental agreement provides for an additional not -to -exceed amount at $43,650 for: 1) Providing additional Coordination with Caltrans Design Section 2) Developing a Visual Impact Assessment 3) Updating design drawings, right-of-way requirements drawings, and cost estimate 4) Incorporating the VIA into the draft Environmental Document for the project. 5) Providing Filipino Village Project Coordination to Meet Community Development Improvements along Plaza Boulevard 6) Providing SANDAL Progress Reports and Status Meetings 7) Revision of Schedule and Billing Rates Details of the extended scope of work, cost estimates, and schedules for this supplemental agreement are included in the attached Exhibit "A". The proposed cost to complete this work is $43,650 which will increase the total contract amount to $490,887. RESOLUTION NO. 2005 — 59 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE SUPPLEMENTAL AGREEMENT NO. 3 WITH DOKKEN ENGINEERING TO PROVIDE ADDITIONAL ENGINEERING SERVICES FOR THE CAPACITY IMPROVEMENT OF PLAZA BOULEVARD PROJECT WHEREAS, the City desires to employ a consultant to provide additional engineering services for the Capacity Improvement of Plaza Boulevard Project; and WHEREAS, the City has determined that Dokken Engineering is qualified by experience and ability to perform the services desired by the City, and is willing to perform such services. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National City that the Mayor is hereby authorized to execute Supplemental Agreement No. 3 with Dokken Engineering to provide additional engineering services for the Capacity Improvement of Plaza Boulevard Project. Said Agreement is on file in the Office of the City Clerk. PASSED and ADOPTED this 5th day of April, 2005. ATTEST: Michael Dall, City Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on April 5, 2005, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Jerk of the By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2005-59 of the City of National City, California, passed and adopted by the Council of said City on April 5, 2005. City Clerk of the City of National City, California By: Deputy City City f National City, California City of National City Office of the City Clerk 1243 National City Boulevard, National City, CA 91950-4397 Michael R. Della, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 April 19, 2005 Kirk Bradbury Project Manager Dokken Engineering 9665 Chesapeake Drive Suite 435 San Diego CA 92123 Dear Mr. Bradbury, On April 5, 2005, Resolution No. 2005-59 was passed and adopted by the City Council of the City of National City, authorizing the Mayor to execute Supplemental Agreement No. 3 with Dokken Engineering. We are forwarding a certified copy of the above Resolution and one fully executed original agreement. Sincerely, %"U y t Lam, Martha L Alvarez Deputy City Clerk /mla Enclosure cc: Engineering File No. C2002-21 ® Recycled Paper