Loading...
HomeMy WebLinkAbout2005 CON HMS Construction Inc. - Change Order #1 Calmoor Traffic SignalNOTE TO FILE NO ORIGINAL SIGNED AGREEMENT/ CONTRACT I CHANGE ORDER (No coil OF cHnNGF- ofCoe� WAS Q. t. C.., V too ) WAS PROVIDED TO THE CITY CLERK'S OFFICE FOR THIS ITEM. RESOLUTION NO. 2005 — 94 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NO. ONE WITH HMS CONSTRUCTION, INC. IN THE AMOUNT OF $4,970 FOR REMOVAL AND REPLACEMENT OF A BLOCK WALL TO MEET FEDERAL AMERICANS WITH DISABILITIES ACT ("ADA") COMPLIANCE AT THE SWEETWATER ROAD AT CALMOOR STREET AND FAIRLOMAS DRIVE TRAFFIC SIGNAL IMPROVEMENT PROJECT WHEREAS, the contract for the Sweetwater Road at Calmoor Street and Fairlomas Drive Traffic Signal Improvement Project was awarded to HMS Construction, Inc. on August 3, 2004, by the adoption of Resolution No. 2004-141; and WHEREAS, there is an existing block wall on the north side of the project where a traffic signal pole will be installed leaving a shortage of space between the wall and the pole for wheelchair access per ADA standards which requires the removal and replacement of the block wall. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 1 with HMS Construction, Inc. in the amount of $4,970 for the removal and replacement of a block wall on the north side of the Sweetwater Road at Calmoor Street and Fairlomas Drive Traffic Signal Improvement Project. PASSED and ADOPTED this 17ui day of May, 2005. Nick Ini[ina,'D7fayor ATTEST: Mic ael R. D a, City Clerk APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on May 17, 2005, by the following vote, to -wit: Ayes: Councilmembers lnzunza, Morrison, Natividad, Parra, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA h A, lerk of the City Ci of National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2005-94 of the City of National City, California, passed and adopted by the Council of said City on May 17, 2005. City Clerk of the City of National City, California By: Deputy C 00ti- 3y AEETING DATE City of National City, California COUNCIL AGENDA STATEMENT May 17, 2005 AGENDA ITEM NO. 6 7 ITEM TITLE Resolution of the City of National City approving Change Order Number One to HMS Construction, Inc. for Sweetwater Rd. at Calmoor St. and Fairlomas Drive Traffic Signal Installation, Spec. No. 03- 10, in the amount of $4,970 for removal and replacement of a block wall to meet Federal Americans with Disabilities Act compliance, and authorizing the City Engineer to approve and sign the change order. PREPARED BY Alberto Griego DEPARTMENT Engineering 336-4386 EXPLANATION On August 3, 2004, by resolution No. 2004-141, the City Council awarded a contract in the amount of $125,190 to HMS Construction, Inc. for the Sweetwater Rd. at Calmoor St. and Fairlomas Drive Traffic Signal Installation, Specification No. 03-10. There is an existing block wall on the North East side of the project where a traffic signal pole will be installed leaving a shortage of space between the wall and the pole for wheelchair access per ADA standards. Engineering staff is recommending the approval of a change order to HMS Construction, Inc. in the amount of $4,970 for the removal and replacement of the existing block wall and concrete sidewalk panels at pole location "E" in order to increase the width to 48" between the block wall and the pole and satisfy ADA standards. The total amount of Contract Change Order Number One is $4,970, increasing the current cost of the project from $125,190 to $130,160, which is below the total estimated budget for the project of $156,487.50. Environmental Review __ N/A Financial Statement The total budget for the project was estimated to Funding is available through Account Number this change order. Approved By: be $156,487.50. Finance Director 109-409-500-598-6161 and 307-409-500-598-6035 for Account No. STAFF RECOMMENDATION Adopt the Resolution. BOARD./COMMI N/A. N RECOMMENDATI N ATTACHMENTS ( Listed Below ) I. Resolution 2. Contract Change Order No. One Resolution No. o 005- 3. Proposal from HMS Construction, Inc. changeorderhnis ..200'cci. C'ZGa��3�