HomeMy WebLinkAbout2006 CON Manhole Adjusting Inc. - Street Resurfacing 05-06 Change Order #1NOTE TO FILE NO ORIGINAL SIGNED AGREEMENT/ CONTRACT CHANGE ORDER WAS PROVIDED TO THE CITY CLERK'S OFFICE FOR THIS ITEM. NTF CONTRACT CHANGE ORDER NO. 1 DATE: 5/16/06 PROJECT: National City Street Resurfacing Project, FY 05-06 Specification No, 04-09 TO: John Corcoran, President Manhole Adjusting, Inc. 9500 Beverly Rd. Pico Rivera, CA 90660 DESCRIPTION OF CHANGE: This change order is written to add work to item numbers 3, 10 thru 15, 18, 20, and 22 thru 26 to the contract Mobilization 2 Item Traffic Control Asphalt Rubber & Aggregate 1- Membrane (ARAM) 4 Type If Slurry Unit LS LS Current Contract Adjusted Contract (CO #1) Bid Sty Unit Price Amount gly Unit Price Am 1 134,36(1.00 $34,285.00 I $34,360.00 $3 SY 5 Asphalt Rubber Hot Mix Gap Graded 6 Leveling Course including Crack Cleaning, Speed ! lumps & Misc. Patch 7 Cold Milling Adjust Manholes to Grade SY I $71,825.00 $71,825.00 I $71,825.00 Si 168,533 $4.80 $808,958.40 171,668 $4.80 $82 20,069 52 92 $58,601.48 20,069 $2.92 55 SF SF SF Adjust Valve Cans/Hand-holes to Grade 10 R&R Cross Gutter Elf New Cross Gutter 1,335,886 $0.945 $1,262,412.27 1,135,88 $0.945 $1,26 6 693.394 $0.70 $485,375.80 693,394 SO 70 S48 715,307 50.234 3167,381.84 715,307 $0.234 $16 $646.00 $78,812 00 122 $646.00 $7 $212 00 $51,728.00 244 5212.00 $5 EA 122 E.A1 244 12 R&R Sidewalk 13 R&R Asphalt Curb 1.4 LR&1 Curb and Gutter 15 New Curb and Gutter 16 Traffic Stripping _17 Reinstall Traffic Loops 18 New Alley Apron 19 R&R Alley Apron SF SF SF LF LF LF LS 1,200 S48.30 $57,960.00 1,329.68 $48.30 $6. 2,159 S38.65 S84,836.75 3,005.95 $38.65 $11. 1,615 525.35 540,940.25 4126 $25.35 $I 0, 160 $25.35 S4,056.00 118 525.35 218 $111.00 $24,198.00 525.74 $111.00 S51 24 $80.90 $1,941.60 23.55 S80.90 20 New Pedestrian Ramps 1 21 Demolish Concrete Strips Subtotals EA 27 SF 200 ESA2 SF 30 SF 35 $47,900 00 $47,900 I 547,900 00 S480.00 $I 2,960.00 129 5480.00 $61 S39.85 $7,970.00 269 I $39.85 SI( 565.20 $1,956.00 30 $65.20 $1 53,740.00 $7,480.00 4 $3,740.00 $44.60 $1,561.00 35 $44.60 $3,313,214.39 53.521 Page I (t; CONTRACT CHANGE ORDER NO. 1 Current Contract Item Delete Streets No. 23,25,27,28,29 and 31. Unit I,S Rid Qty Unit Price Amount Adjusted Contract (CO AIL ty Unit Price Amount (S499,455.40-S499,455.40 Add Streets No. Al, B1, Cl, DI and El. Add Streets No. F1, GI and HI Remove and Replace deteriorated asphalt concrete on E.19th St. and Coolidge Ave. next to Paradise Creek Park Add Street No. I1, JI and K1 Previous Subtotal Total C.O. Amount LS DISCUSSION: LS LS LS S291,655.48 4151,917.60 S291,655.48 S151,917.60 526,255.00 S26,255.00 S320,062.58 S3,313,214.39 S320,062.58 S3,521,695.69 S3,812,130.95 S498,916.56 Line Item No. 3 has been increased to provide compensation to the contractor for an additional 3,135 square yards of Asphalt Rubber and Aggregate Membrane (ARAM). Line Item No. 10 has been increased to provide compensation to the contractor for an additional 129.68 square feet of Removal and Replacement of Cross Gutter. Line Item No. II has been increased to provide compensation to the contractor for an additional 846.95 square feet of New Cross Gutter. Line Item No. 12 has been increased to provide compensation to the contractor for an additional 2,511 square feet of Remove and Replace Sidewalk. Line Item No. 13 has been decreased due to the deletion of 42 linear tcct of Remove and Replace Asphalt Curb that was not needed. Line hem No. 14 has been increased to provide compensation to the contractor for an additional 307.74 linear feet of Remove and Replace Curb and Gutter. Page 2 CONTRACT CHANGE ORDER NO. 1 Line Item No. 15 has been decreased due to deletion of 0.45 linear feet of Remove and Replace Curb and Gutter that was not needed. Line Item No. 17 has been increased to provide compensation to the contractor for an additional 102 Reinstall Traffic Loops. Line Item No. 18 has been increased to provide compensation to the contractor for an additional 69 square feet of New Alley Apron. Line Item No. 20 has been increased to provide compensation to the contractor for an additional 2 New Pedestrian Ramps. New Items Added Change Order No. 1 The lump sum price for Line Item No. 22, Delete Street Sections No's. 23,25,27,28,29 and 31 which were deleted due to replacement of old water lines by Sweetwater Authority and SUGE under -grounding of power lines which realizes a savings of $499,455.40, which was credited from the Contractor to the City. The total amount shown includes overhead and markup per Exhibit A. The lump sum price for Line Item No. 23, Add streets No. Al, B1, Cl, D1, and El is added at the City's request to provide compensation to the contractor for additional street resurfacing with rubberized asphalt. See Exhibit A. The lump sum price for Line Item No. 24, Add streets No. Fl, G1 and III is added at the City's request to provide compensation to the contractor for additional street resurfacing with rubberized asphalt. See Exhibit A. The lump sum price for Line Item No. 25 Remove and Replace Deteriorated Asphalt Concrete Pavement on E.19"' St. and Coolidge Ave. next to Paradise Park is added at the City's request to provide compensation to the contractor for additional street resurfacing. The lump sum price includes labor, equipment, and materials per Exhibit A. The lump sum price for Line Item No. 26, Add streets No. II, JI and K1 is added at the City's request to provide compensation to the contractor for additional street resurfacing with rubberized asphalt. See Exhibit A. CONTRACT ADJUSTMENT: As a result of this change order the contract price is adjusted as follows: I. The contract price is increased in the amount of $498,917 from the current contract price of $3,313,214 to a new contract price of S3,812,131. Page 3 CONTRACT CHANGE ORDER NO. 1 2. There is no increase in contract time. The contract completion date was previously established as Tuesday, November 14, 2006. This change order shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Manhole Adjusting, Inc. will not be entitled to damages or additional payment for delays as described in the 1997 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. RECOMMENDED FO PPROVAL BY: Alberto 7riego,"Ass APPROVED BY: Engineer D e Mr. John Corcoran, President Date Manhole Adjusting, Inc. Ms. Maria Elena Corcoran Date Manhole Adjusting, Inc. Stephen NI. Kirkpatrick, City Engineer Date Page 4 EXHIBIT A National City Street Resurfacing Project, FY 05-06 Subj; Bid Item Summary; deleted/added streets 1. Deleted Streets. Two -Layer System As of 3/25/08 Street Location and Limits Bid item 3 ARAM S.Y. 4.80/s.y. 5 ARHM S.F. .945/s.f. 7 Cold Mill S.F. .234/s.f. No. 23, Division St (Harbison Ave to City Limits 2200 10580 19800 18711 4320 1010.88 No. 25, Plaza Blvd (City Limit to Paradise Valley Rd 8700 32180 80300 58983.5 12060 2822.04 No. 27, E. 30th St (Highland Ave to 'I-' Ave 02 City Limit) 8958 42988.8 80600 76167 • 14680 3435.12 No. 28, W. 8th St (Trolley RR 7C ing to I-5) 7785 37368 70060 68206.7 13580 3177.72 No. 29, E. 8th St (National City Blvd to 'D' Ave) 8744 41971.2 78690 74382.05 15480 3622.32 NO. 31, Highland Ave. (350' south E. 30th th Bridge) 2034 9763.2 18300 17293.5 3600 842.4 SubTotal 174811.2 309723.75 14910.48 2. Added Streets. TOTAL $499,445.40 (Estimated) System 2 Street Location and Limits Bid Item 3 ARAM S.Y. 4.80/s.y. 4 Slurry S.Y. 2.92/s.f. 6 Lv'g Crse S.F. 0.70/s.f. Al, 'B' Ave (E. 1st St to E. 4th SI) 4089 19627.2 4089 11939.88 36800 25760 B1, 'D' Ave (Division St to e. 4TH St.) 5556 26668,8 5558 16223.52 50004 35002.8 C1, 'E' Ave (E. 2nd St to E. 4th St) 2756 13228.8 2756 8047.52 24804 17362.8 D1, 'F Ave (E. 30th St to 750' south of E. 30th St) 2500 12000 2500 7300 22500 15750 El, E. 3rd St ('D' Ave to Highland Ave) 5645 27096 5645 16483,4 50805 35563.5 SubTotal 98620.8 59994.32 129439.1 288054.22 Plus Note No. 1: 3,601.26 TOTAL: $291,656.48 Notes: 1. Location 81, 'D' Ave. - Added Bid Item No Cold Plane 15930sJ.@0.2341s.f = $3601.26 /e EXHIBIT A National City Street Resurfacing Project, FY 05-06 Sub): Bid Item Summary; added streets 1. Added Streets, (Estimate) System 2 As of 3/25/08 Street Location and UmltS Bid Item 3 ARAM4 S.Y. 4.80/s 8kirry _ s.Y. 2.92/s.t 8 LVg Caw s.F. 0.70/s.f. F1, E. 1st St. (\National City BI to'B' Ave.) 2758 13228.8 2756 8047.2 _ _ 24800 17380 G1, E. 4th St. (Highland Ave. to 'L' Ave.) 5600 28880 5800 18352 50400 35280 HI, E. 12th St. (Palm Ave. to 'R' Ave.) 2480 11904 2480 7241.6 22320 15624 Sutotal 1 52012.8 I 31640.8 88284. TOTAL 2. Summary deleted/added streets. See attached. 51917.6 a. Six (6) deleted streets: -499445.4 "1 b. Five added streets: (estimate) 291655.48 c. Three additional streets: (estimate) 151917.6 Net Decrease: -55872.32 Notes: '1 Four streets deleted to SD G&E work. Two deleted due to contract work o longer applicable (Locations 25 & 31). // CMS • National City Street Resurfacing Porject, Spec. No. 04-09 Subj: Estimate Extra Work at E. 19th St. & Coolidge Ave. 4/17/2008 Description UNITS Cost/ Unit Total 13-Apr 14-Apr 1. Labor , Foreman 8 8 80 4110 Operator 8 18 55 1320 Laborer 24 24 45 2180 Harold Smith 3 0 80 180 Mlko 3ltva e 4 60 800 2. Equipment 3/4T PU 8 8 15 240 IT UitWTac Trick 8 8 15 240 CAT C8534C 8 8 75 800 TX850 Skip Loader 8 8 75 600 10 cy End Dump 20 12 75 2400 Greyhound AC Paver 0 8 150 1200 CAT CB2240 0 8 70 560 3. Material AC 201 75 15075 4. Other Dump Fees 10 0 80 600 TOTAL 28255 As of 5/1/2006 National City Street Resurfacing Project, Spec. No. 04-09 Subj: Estimate three (3) added street locations 4/20/06 1. Estimate costs added streets. Street Location and Limits Bid Item 3 ARAM 4.8 4 Slurry 2.92 8 LYg Crse 0.7 S.Y. 4.80/s.y. S.Y. 12.92/s.y. S.F. 0.70/s.f. I I, E. 4th Avenue: from National City Blvd. to Highland Ave. 13,579 $ 65,179.20 13,579 $39,650.68 122,211 $85,547.70 from 'L' Avenue to'M'Avenue 1,922 $ 9,225.60 1,922 $5,612.24 $12,108.60 17,298 J1, 'F' Ave., from E. 1st St. to E. 4th St. 4,416 $ 21,196.80 4,416 $12;894.72 $27,820.80 39,744 K1, 'G' Ave., horn e. 2nd St. to E. 4th St. 2,912 $ 13,977.60 2,912 $8,503.04 $18,345.60 26,208 Area Subtotal 22,829 22,829 205,461 Price Subtotal $ 109,579.20 $66,660.68 $143,822.70 Total $320,062.58 .11 /1 RESOLUTION NO. 2006 — 94 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER NUMBER ONE WITH MANHOLE ADJUSTING, INC. FOR THE NATIONAL CITY RESURFACING PROJECT FY 2005/2006, IN THE AMOUNT OF $498,917 TO RESURFACE AN ADDITIONAL FIFTEEN STREET SECTIONS, AND FOR INCREASED REPLACEMENT OF CONCRETE SIDEWALK, PEDESTRIAN RAMPS AND RUBBERIZED ASPHALT PAVEMENT ON ORIGINAL STREETS WHEREAS, on October 4, 2005, the City Council adopted Resolution No. 2005- 217, which awarded a contract to Manhole Adjusting, Inc. for the National City Street Resurfacing Project; and WHEREAS, due to deteriorated conditions of the existing streets and sidewalks additional concrete sidewalk, pedestrian ramps and rubberized asphalt pavement replacement was necessary; and WHEREAS, six streets had to be deferred from resurfacing due to emergency work planned by Sweetwater Authority and SDG&E; and WHEREAS, fifteen residential street sections that have been identified as having a low pavement condition index due to deteriorated pavement were added to the project; and WHEREAS, although the cost of construction has increased dramatically since the original agreement was approved, Manhole Adjusting, Inc. is willing to accept additional work at the contract price, therefore, it is recommended that the additional streets be included at this time to take advantage of the cost savings. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the City Engineer to execute Change Order No. 1 to resurface an additional fifteen street sections, and for increased replacement of concrete sidewalk, pedestrian ramps and rubberized asphalt pavement on original streets PASSED and ADOPTED this 16th day of May, 2006. ATTEST: MichelDalla, Clerk APPROVED AS TO FORM: George H. Eiser, Ill, City Attorney Passed and adopted by the Council of the City of National City, California, on May 16, 2006, by the following vote, to -wit: Ayes: Councilmembers Inzunza, Morrison, Natividad, Parra, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: NICK INZUNZA Mayor of the City of National City, California A City C -rk of the ty of ational City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2006-94 of the City of National City, California, passed and adopted by the Council of said City on May 16, 2006. City Clerk of the City of National City, California By: Deputy C'd005-G\ wtEETING DATE May 16, 2006 City of National City, California COUNCIL AGENDA STATEMENT 20 AGENDA ITEM NO. / JTEM TITLE Resolution of the City of National City approving Change Order Number One with Manhole Adjusting, Inc. for National City Street Resurfacing Project FY 05-06, in the amount of $498,917 to resurface an additional fifteen streets sections and for increased replacement of concrete sidewalk, pedestrian ramps and rubberized asphalt pavement on original streets and authorizing the City Engineer to sign the change order. PREPARED BY Alberto Griego DEPARTMENT Engineering Ext. 4380 EXPLANATION See Attached. Environmental Review X N/A Financial Statement The total budget for the project was estimated to be S498,917, increasing the curratii •ost of the project from $3,313,214 to S3,812,131. The total budget for the project was estimated to be $3,943,000. Funding for this Change Order is available through Account No. 109-409-500-598-6035 and 3iLkichilatt1 598-6035. STAFF RECOMMENDATION Adopt the Resolution. BOARD / COMMISSION RECOMMENDATION N/A ATTACHMENTS ( Listed Below ) I. Resolution 2. Status Report and Location Map Contract Change Order No. One a -zoo no) Resolution No. -=iCOl r 4. Exhibit A