HomeMy WebLinkAbout2006 CON Portillo Concrete - Highland Ave Medians Phase I Change Order #1CONTRACT CHANGE ORDER NO. 1
DATE: 7/18/06
PROJECT:
TO:
IIighland Avenue Medians Phase I-F. 8th Street to ii. I6`h Street
Improvements Project
Specification No. 05-05
Mario Portillo, President
Portillo Concrete, Inc.
3528 Harris St.
Lemon Grove, CA 91945
DESCRIPTION OF CHANGE:
This change order is written to add work to item numbers 7 thru 10, 12 thru 17, 19 thru
21, 24 thru 26, and add items 38 and 39 to the contract
Current Contract Adjusted Contract
(CO #1)
No Item__
I Mobilization
2 Traffic Striping and Signage
(including paint and protective
coatinic s)
LS
LS
L_ 3 Traffic Control LS
4 Pollution Control Measures LS
5 Clearing and Grubbing LS
6 Irrigation Service r_ LS
7 Adjust Manhole to Grade - EA_
8 Removal of Street Section
— (approx. 5" A.C.! 6" PCC) SF
Bid Qtv Unit Price
1 92,000.00
1 25,000.00
50,000.00
Amount
92,000.00
25,000.00
50.000.00
15,000.00 15,00(1.00
7
6846
9 Removal of Street Section 10,215
L(a�rox. 5" A.C) _ t_ SF _
10 Remove and Replace Existing f 4,800
_ Street Section (Dig OutsL — 1 SF i
1 1 TFxcavation and Export of Soil at 675
Medians CY_
17— — — ---- TON 1,150 T
1 112" A.C. Overly S
13 8" Type "B" Median Curb LF - 2,724
1-14 1' Wide Median Curb LF 1 967
j 15 A.C. Backfill adjacent to 1 TON 100
Median Curb S
16 — Crushed Miscellaneous Base CY 77
17 Cold Mill Existing Pavement SF 82,500
18 r Trench and Resurface for 254
-
Irrigation Line I F ,1 Subtotal — -- --- 1
Qt.). Unit Price {, Amount
1 92,000.00 92.000.00
1 25,000.00
1
1
50,000.00
15.000.00
25,000.0H
50.000.00
15,000.00
25,000.00 21,000.00 1 25,000.00 _ 25,0011.00
8.600.00 8,600.00 1 8,600.00 18,600 00
2511.0(1'h 1,750.00 13 250.00 3,250.00
4.00 I 27,384.00 8488 4.00 33,952.00
1.00
18.0(1
49.00
10,215.00 10,594
86,400.0Id 6827
33,071.00 675
81.00 93,150.00 1637
25.00 ' 68,100.00 2,501
25.00 24,175.00 1050
200.00 20,000.00 124.3
210.00 16,17(1.00
0.33 27,225.00
100.00 I 25,400.00 254
40
52,40(1
1.00 10,594.00
18.00 122,886.00
49 00 33,075.00
141,001,
132,597.00
25.00 I 62,525.00
25.00 26,250.00
200.00T 24,860.00
210.00
0.33
100.0
8,400.011 ;
17,292.011 1
0 25.400.00 1
r5716,68100H
Page 1
CONTRACT CHANGE ORDER NO. 1
No ltew
19 - Re lace Type 2 Detector Loop
20 i Concrete paving w/ top seeded
aggregate
21 Concrete paving - std gray w/ SF
2x2 grid
222 Concrete mow curb-6" wide LF
23 Steel post bollard EA
24 Class "A" Top Soil CY
25 Root Barrier - Horizontal EA
I26 Root Barrier - Vertical LF
77 Tree - 36" Box EA
28
Current Contract
Unit Bid Qty
EA 60
SF 4050
Unit Price
350
King Palm - 18 Foot Brown Trunk
Height
EA
29 King Palm - 24 Foot Brown Trunk
30 tHeight
Shrubs - 5 Gallon
3 I Shrubs/Groundcover - 1 Gallon
32 Groundcover - Flats
33 - Mulch
3-4 Complete Automated Irrigation
*System
35 Soil Testing — --
36_1 Maintenance (90 days)
- 3 7I Electrical Lighting systems
38 _PC'C Cap over Storm
39 Pedestrian Ramps
SuhtotaI — --
r Previous Subtotal from pat,.c 1
EA
210
Amount
21,000.00
14
10
610
46
1650
34
8
EA
EA
SF
CY
LS
LS
LS
LS
()rain - LS
EA
Iot;tl— --_—_— _
C.O. No. 1 Amount — — —
DISCUSSION:
412
4355
1700
51
1
1
10.00
40,500.00
(,.00
30.00
300.00
65.00
54.00
13.00
1,280.00
2,700.00
3,900.00
1,260.00
120.00
3,000.00
39,650.00
2,484.00
21,450.00 1607
43,520.00 34
21,600.00 8
Adjusted Contract
_ (COtt1
Qty Unit Price Amount
40 350 14,000.00
4,415 10.00 44,150.00
212 6.00
15,600.00
14
10
500
39
1,272.00
30.00 420.00
300.00 _ 3,000.00
65.00 I 32,500.001
54.0-0- 2,106.00
T 13.0u I 20,891.00
1,280.00 ' 43.520.00 1
2,700.00 j 21,600.00
3,900.00 j 15.600.00 1
38.00 15,656.00 j _ 412
7.60 33,098.00 4355
0.59 1,003.00 1700
65.00 3,315.00 51
128,700.0 128,700.00 - 1 0 __
1,100.00 1,100.00T 1 -
1 1,000.00 11,000.00
106,000.0 106,000.00
01
b I.159.000.00
Line [tern No. 7 has been increased to provide compensation
additional six (6) Manhole Adjusted to Grade.
Line Item No. 8 has been increased to provide compensation
additional 1.642 square tact of Removal of Street Section (appro
Line Rein No. 9 has been increased to provide compensation
additional 379 square feet of Removal of Street Section (approx.
1
1
1
38.00
7.60
0.59
65.00
15,656.00
33,098.00
1,003.00
128, 700.0
0
1,100.00 1
11,000.00
1
106,000.0
0
1,500.00
2,500.00
3,315.00
128,700.00
1,100.00
11,000.00
106,000.00
to the contractor for an
to the contractor for an
x. 6" PC(:).
to the contractor for an
5" A.C.
1,500.000
10,000.00
S510,431.tt0
S716,681.00
S1,227,112.00
563,112.00
Pave 2
CONTRACT CHANGE ORDER NO. 1
Line Item No. 10 has been increased to provide compensation to the contractor for an
additional 2,027 square feet of R.emove and Replace Existing Street Section (Dig Outs).
Line Rem No. 12 has been increased to provide compensation to the contractor for an
additional 487 tons of 1 '/" A.C. Overlay due to unevewicss of the existing pavement and
to level the roadway.
Line hem No. 13 has been decreased due to the deletion of 223 linear feet of 8" type "B"
Median Curb that was not needed.
Line Item No. 14 has been increased to provide compensation to the contractor for an
additional 83 linear tc.et of 1. Ride Median Curh.
Line Item No. 15 has been increased to provide compensation to the contractor for an
additional 24.3 tuns of A.C. facktill adjacent to Median Curh.
Line Item No. 16 has been decreased due to deletion of 37 cubic yards of Crushed
Miscellaneous Base that was not needed.
Line Item No. 17 has been decreased due to deletion of 30,100 square feet of Cold Mill
of Existing Pavement that was not needed.
Line Item No. 19 has been decreased due to deletion of 20 Replace Detector Loops that
\were not needed.
Line Item No. 20 has been increased to provide compensation to the contractor for an
additional 365 square feet of Concrete paving w/top seeded aggregate.
Line hem No. 21 has been increased to provide compensation to the contractor for an
additional 2 square feet of Concrete paving-std gray w!2x2 grid.
1.inc Rem No. 24 has been decreased due to the deletion of 110 cubic yards of Class "A"
Top Soil that was needed.
Line Item No. 25 has been decreased due to the deletion of 7 wets of Root Barrier -
Horizontal that were not needed.
Line Rein No. 26 has been decreased due to the deletion of 43 linear feet of Root Baffler -
Vertical that were not needed.
Page 3
CONTRACT CHANGE ORDER NO. 1
New Items Added Change Order No. 1
The lump sum price for Line Item No. 38, PCC Cap over Storm Drain is added at the
City's request to provide compensation to the contractor for added protection to an
abandoned stortn drain crossing the median across from the stairway to the Price
Breakers Store.
The lump sum price for Line Item No. 39, Pedestrian Ramps is added at the City's
request to provide compensation to the contractor for 4 pedestrian ramps meeting the
ADA requirements that were not considered in the original contract.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of S63,112 from the current
contract price of $1,159.000 to a new contract price of $1,222,112.
2. The contract time is increased by five (5) working days. The contract completion
date was previously established as Monday July 10, 2006. The new contract
completion date is therefore established as Friday, July 14, 2006.
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work described above. Portiilo Concrete, Inc. will not be entitled to damages or
additional payment for delays as described in the 1997 edition of the Standard
Specifications for Public Works Construction, Section 6-6.3, for performing the work as
described above.
RECOMMENDED F PPROVAL BY:
Alberto (irieQo.: sso
APPROVED HY:
Mr. Mario Portiilo, President
Portiilo Concrete. Inc.
tnecr
Page 4
q(oid
Date
CONTRACT CIIANC:E ORDER NO. 1
`07
Ishint Portillo. Secretary Date
Portillo Concrete, Inc.
hen Ni. Kirkpatrick, City E S eer
Page 5
RESOLUTION NO. 2006 — 130
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NUMBER ONE TO PORTILLO CONCRETE, INC.
FOR HIGHLAND AVENUE MEDIANS PHASE I - EAST 8TH STREET
TO EAST 16TH STREET IMPROVEMENT PROJECT, SPEC. NO. 05-05,
IN THE AMOUNT OF $63,112 FOR ADDITIONAL WORK
ON VARIOUS ITEMS AND ADDITIONAL FOUR (4)
NEW AND PEDESTRIAN RAMPS
WHEREAS, the contract for the National City Highland Avenue Medians Phase I
- East 8th Street to East 16th Street Improvement Project was awarded to Portillo Concrete, Inc.
on December 20, 2005, by the adoption of Resolution No. 2005-268; and
WHEREAS, after the contract was awarded, it was noted that additional removal
and/or replacement of street sections to correct an uneven surface and areas of pavement
deterioration; and
WHEREAS, the capping of an abandoned storm drain and the addition of four (4)
new pedestrian ramps have been recently added to the project.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the City Engineer to execute Change Order No. 1 with Portillo
Concrete, Inc. in the amount of $63,112 for additional removal and/or replacement of street
sections, capping of an abandoned storm drain, and the addition of four (4) new pedestrian
ramps for the National City Highland Avenue Medians Phase I - East 8th Street to East 16th
Street Improvement Project.
PASSED and ADOPTED this 18th day of July, 2006.
ATTEST:
Mich el Dalla, i Clerk
APPROVED AS TO FORM:
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on July 18,
2006, by the following vote, to -wit:
Ayes: Councilmembers: Inzunza, Morrison, Natividad, Parra, Zarate,
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY:
NICK INZUNZA
Mayor of the City of National City, California
a
City CIrk of the City ofNational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2006-130 of the City of National City, California, passed and
adopted by the Council of said City on July 18, 2006.
City Clerk of the City of National City, Califomia
By:
Deputy
caoos-0
City of National City, California
COUNCIL AGENDA STATEMENT
July 18, 2006
MEETING DATE
11
AGENDA ITEM NO.
Resolution of fhe City oFNational City approving Change Order Number One to Fortillo
JTEMMiTLEInc. for Highland Avenue Medians Phase I- E.8'" St. to E. 16th St., Spec. No. 05-05, in the amount of
$63,112 for additional work on various items and additional four (4) new Pedestrian Ramps, and authorizing
the City Engineer to approve and sign the change order. Funding for this project is provided by Community
Development Commission.
PREPARED BY Alberto Griego DEPARTMENT Engineering Ext. 4386
EXPLANATION
See attached Explanation
J
Environmental Review _xx N!A
Financial Statement
The total budget fotlthe project was estimated to be $1,506,700. Funding for this Change Order
is available through Community Development Commission Account Number 900210.
Account No.
STAFF RECOMMENDATION
Adopt the esolution tolvtj
BOAR 9 O MI ION R COMMENDITTION
N/A
ATTACHMENTS ( Listed Below )
1. Resolution
2. Contract Change Order No. One
Resolution No. `).00(r - 1,.L0
A-200 (9/80)
Ccporti 110