CONTRACT CHANGE ORDER C/O Number: 016
TO (Contractor): Jaynes Corporation C/O Initiation Date: September 10, 2005
111 Elm Street 4th Floor Project: National City Public Library
San Diego, California 92101 Contract No.: 1028
REASON FOR CHANGE:
1. COR #232: Metal Corner Guards at Staff Entrance, Repair Broken Tile Stone.
This added work is due to owner added protection/repairs of damage to Stone tile at Staff
Entrance,
2 COR #232: Corner Guards in Children's Area and Outside Custodial Room
This added work is due to owner added protection/repairs of damage to interior drywall corners in
Childrens and Custodial areas.
3. COR #232: Repair and Paint Damaged Corners
This added work is due to owner added protection/repairs of damage to interior drywall corners
throughout the building interior.
4. COR #232: AC Ramp at Loading Area in Parking Lot
This ramp was added to enable staff to move deliveries in parking lot, over the curb. This was not
called for in the original drawings.
5. COR #233: Additional Wood Shelving in AV Shelves
The change was due to the AV collection out growing the existing storage shelve space.
6. COR #232: Add Concrete Paving at Front Entrance
The additional concrete pavement is due to the continued use of the landscape area at the entrance
by patrons walking over and destroying the plantings.
7. Strip and Seal Restroom Tile Floors.
This is additional work to seal and protect the tile floors in the library restrooms. This will provide
better wearing surface and prolong life of flooring. This was not specified in the original plans.
8. COR #232: Re -Key Restroom Locks for Separate Key.
This is an owner request to have the restrooms keyed to a individual key for safety and security
reasons.
9. COR #232: Additional Stack Lighting for Adult Collection
This change was an Owner request in order to provide improved lighting in and around the work
tables and book stacks located in the middle of the main collection area. This is supplemental to the
original lighting plan for the project.
10. COR #232: Add Light Switches at Nine (9) Locations
This change was an Owner request in order to provide manual override to light sensors and to
Provide switches in rooms were none were previously installed by contract.
11. COR #232: Add Door Pulls and Thumb Turn at Friends Bookstore
This is an owner to revise the door pulls and to add a thumb turn lock to the door. The existing
Pull hinders turning the key and the thumb turn is an added security measure.
12. COR #230: Add Projection Screen Valance at Computer Room
This is an owner requested architectural upgrade to the screen in Computer room. The added cover
Provides protection against vandalism to the screen.
13. COR #232: Add Glass Panel Door into Teaming Center
This added glass panel provides improved visibility and security for staff working in Literacy area
CONTRACT CHANGE ORDER C/O Number: 016
TO (Contractor): Jaynes Corporation C/O Initiation Date: September 10, 2005
111 Elm Street 4th Floor Project: National City Public Library
San Diego, California 92101 Contract No.: 1028
REASON FOR CHANGE (cont'd):
14. COR #232: Add Lockset for Door to Family Literacy
This was an Owner added upgrade adding security for the Literacy Room from access from the 2"
Floor landing.
15. COR #232: Add Window Coverings in Rooms 234 and 235
This modification was generated because of the western exposure sunlight and heating factor. The
added coverings provide a much improved working environment for staff. These rooms did not
call out to receive covering in the original project plans.
16. COR #232: Add UV Filters for Fluorescent Fixtures in LHR
This modification was an owner to provide additional protection for damaging UV rays emitted
from the fluorescent fixtures to the LHR collections.
17. COR #231: Add Five (5) Fire Pull Box Stations
This additional work was added due to NC Fire Dept. request to have the pull boxes at five (5)
exiting locations. This is a fire, life, safety upgrade form the original plans.
18. COR #232: Add Security Mirrors in LIIR and AV Collection Areas
These items were an owner request to provide additional security and visibility in these areas.
19. COR #232: Add End Panel to Shelving in Literacy Room
This proposal request was an owner request to provide an end panel for the shelve at room
entrance that did not call to receive one on the original plans.
20. COR #204: Add Stainless Steel Escutcheons at Stair
The added work was an esthetic upgrade at the main radius staircase. The fitted wood cap had
openings around each rail support that did not have an appealing esthetic look. The escutcheons
hide the support penetration of the wood cap. No detail was provided in the plans to cover these
penetrations.
21. COR #229: Add Weather Seals to Windows in Librarian's Office
This was an owner requested item due to a loud howling noise being heard in librarian's office. The
problem was traced to a design issue with the specified seals around door to patio. The originals
were replaced with the upgraded seals.
22. COR #226: Add Door Hardware at Door # 1231)
The original plans did not call for locksets. These have been added to provided the owner desired
security for this door opening.
23. COR #232: Re -Programming to Light Controls (Owner Request)
This added scope of work was required due to the revised business hours of library operations. 'File
lighting controls had to be modified for the new timetable.
24. COR #232: Jayne's Labor, (3) Days for Paint, Drywall Repairs in COR #232
This individual item identifies the contractor labor to perform the drywall and painting repairs
requested by CNC.
25. COR #232: Jayne's Admin., Overhead, Markup and Bond Costs for COR #232
This item identifies the contractor's associated Admin., Overhead, Markup and Bond Cents Mr COR :'232.
CONTRACT CHANGE ORDER CEO Number: 016
TO (Contractor): Jaynes Corporation C/O Initiation Date: September 10, 2006
111 Elm Street 4th Floor Project: National City Public Library
San Diego, California 92101 Contract No.: 1028
A Change Order is hereby recommended for the following work in the amount identified in this document:
DESCRIPTION OF CHANGES:
1. COR #232: Metal Corner Guards at Staff Entrance, Repair Broken Tile Stone .......S 1,025.00
2. COR #232: Corner Guards in Children's Area and Outside Custodial Room..........$ 170.00
3. COR #232: Repair and Paint Damaged Corners .$ 0.00
4. COR #232: AC Ramp at Loading Area in Parking Lot S 3,000.00
5. COR #233: Additional Wood Shelving in AV Shelves S 6,987.00
6. COR #232: Add Concrete Paving at Front Entrance ...5 1,575.00
7. Strip and Seal Restroom Tile Floors S 2,500.00
8. COR #232: Re -Key Restroom Locks for Separate Key S 500.00
9. COR #232: Additional Stack Lighting for Adult Collection $ 57,971.00
10. COR #232: Add Light Switches at Nine (9) Locations S 4,500.00
11. COR #232: Add Door Pulls and Thumb Turn at Friends Bookstore $ 550.00
12. COR #230: Add Projection Screen Valance at Computer Room $ 1,951.00
13. COR #232: Add Glass Panel Door into Learning Center S 2,319.00
14. COR #232: Add Lockset for Door to Family Literacy S 350.00
15. COR #232: Add Window Coverings in Rooms 234 and 235 .....S 3,055.00
16. COR #232: Add UV Filters for Fluorescent Fixtures in LHR S 1,024.00
17. COR #231: Add Five (5) Fire Pull Box Stations S 2,659.00
IS. COR #232: Add Security Mirrors in LI IR and AV Collection Areas S 315.00
19. COR #232: Add End Panel to Shelving in Literacy Room S 578.00
20. COR #204: Add Stainless Steel Escutcheons at Stair S 2,644.00
21. COR #229: Add Weather Seals to Windows in Librarian's Office S 1,410.00
22. COR #226: Add Door Hardware at Door # 123D S 811.00
23. COR #232: Re -Programming to Light Controls (Owner Request) S 250.00
24. COR #232: Jayne's Labor, (3) Days for Paint, Drywall Repairs in COR #232. S 1,050.00
25. COR #232: Jayne's Admin., Overhead, Markup and Bond Costs for COR #232$ 8,090.00
REASON FOR CHANGE: Owner Requested Electrical, Shelving and Architectural Additions,
Modifications and Revisions. (See Attached)
COST RECONCILIATION:
One Hundred Five Thousand Two Hundred Eighty -Four Dollars & 00/100: $ 105,284.00
Costs were reviewed by the Construction Manager and the City and negotiated to the satisfaction of the
City. The foregoing increase in price is in full settlement of all entitlements directly or indirectly arising out
of this change.
Construction Contract Accounting Summary:
The Original Contract Amount $ 11,476,444.00
Net change by previously authorized Change Orders $ 823,397.00
Revised Contract Amount due to previous Change Orders $ 12,299,841.00
With this Change Order request the Contract amount increases by $ 105,284.00
New Revised Contract Amount $ 12,405,125.00
Change in Contract Time: Zero (0) Calendar days
Contract Completion Date: May 23, 2005
Recommended for Approval by:
CONSTRUCTION MANAGER / deb, inc. DATE
Martin Gabey; Project Manager
PROJECT ARCHITECT REPRESENTATIVE DATE
Gregory Ny; President (C.A.I.)
Approves b
COPGTTjACTOR/ Jaynes Corporation
Rick Cohen; Senior Vice President
DATE
OWNER/ City Of National City DATE
Steve Kirkpatrick; City Engineer
RESOLUTION 2006 — 204
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NO. 16 WITH JAYNES CORPORATION
IN THE COMBINED TOTAL AMOUNT OF $105,284,
WHICH IS BEING PAID BY REMAINING STATE BOND FUNDS
FOR VARIOUS ADDITIONS AND UPGRADES
TO THE NATIONAL CITY PUBLIC LIBRARY
WHEREAS, the contract for the National City Public Library Project, Specification
No. 1028, was awarded to Jaynes Corporation on February 10, 2004, by the adoption of
Resolution No. 2004-19; and
WHEREAS, the construction of the new library was made possible largely
through a grant from the State of California; and
WHEREAS, the budget for the project includes a contingency account to fund
unforeseen conditions, and although the new National City Public Library was completed and
has been open since August of 2005, there still remains a balance in the contingency account;
and
WHEREAS, library patrons, library staff and library maintenance personnel have
identified items that could be added/upgraded to the building to increase service to the
community, which can now be implemented using the remaining balance in the contingency
account.
WHEREAS, each cost has been negotiated with the contractor and represents a
cost similar to what would have been received had these items of work been identified on bid
day.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the City Engineer to execute Change Order 16 with Jaynes
Corporation in the combined total amount of $105,284 for various additions and upgrades to the
National City Public Library, using the remaining state bond funds.
PASSED and ADOPTED this 3rd day of October, 2006.
ATTEST: i APPROVED AS TO FORM:
1+2
Michael Dalla, City jClerk
George H. Eiser, Ill
City Attorney
Passed and adopted by the Council of the City of National City, California, on October
3, 2006, by the following vote, to -wit:
Ayes: Councilmembers Inzunza, Morrison, Natividad , Parra, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY:
NICK INZUNZA
Mayor of the City of National City, California
C�rk of the i of ational
Cit
y, ty ty, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2006-204 of the City of National City, California, passed and
adopted by the Council of said City on October 3, 2006.
City Clerk of the City of National City, California
By:
Deputy
caoo6-9
>STAFF RECOMMENDATION
Adopt the Resolution
BOARD / COMMISSION RECOMMENDATION
N/A
City of National City, California
COUNCIL AGENDA STATEMENT
MEETING DATE October 3, 2006
4
AGENDA ITEM NO.
ITEM TITLE Resolution of the City Of National City Approving Change Order Number 16 with Jaynes
Corporation in the combined total amount of $105,284 for various additions and upgrades to the National
City library; using the remaining state bond funds and authorizing the City Engineer to sign the change
order.
PREPARED BY Stephen Kirkpatrick DEPARTMENT Engineering EXT. 41R3
EXPLANATION
The construction of the library was made possible largely through a grant from the State of California. The grant
was based upon a budget put together for the design, construction, and furnishings/equipment for the library. The
budget included a contingency amount to fund unforeseen conditions. The project is complete and the library
opened in August of 2005, however there is still balance remaining in the contingency account. Now that the
library has been open a year, library patrons, library staff, as well as library maintenance personnel have identified a
few things that could he added/upgraded to the building to increase service. The remaining balance in the
contingency allows us to address these issues.
There are 25 components to change order number 16 totaling $105,284. Each cost has been negotiated with the
contractor and represents a cost similar to what would have been received had these items of work had been
identified on hid day.
Attached to this report is the change order cover sheet indicating the work, the negotiated cost for the work, and the
explanation of why the change is necessary. The documentation supporting the negotiated cost (which is attached
to the actual change order) has not been included in this report due to the volume of material. It is available for
review at the City Engineer's Office.
(._
CEnvironmental Review x N/A
MIS Approval
Financial Statement
Approved By:
The cost of change order number 16 is $105,284. Funds are budgeted tor this
change order in the project account numbers 241-409-500-598-1583 and 242-409-500-59
Account No.
Finance
actor
83.
ATTACHMENTS ( Listed Below )
1. Resolution
2. Change Order No. 16
Resolution No. -270 tr 'J
Caoo 4- q
cct6
A-200 (Rev, 7/03)