HomeMy WebLinkAbout2007 CON Project Design Consultants - 2nd Amendment AgreementAMENDMENT TO AGREEMENT
FOR
CITY OF NATIONAL CITY
AND PROJECT DESIGN CONSULTANTS
The parties to this Second Amendment to Agreement PROJECT DESIGN
CONSULTANTS, hereinafter "Contractor", and the CITY OF NATIONAL
CITY, a municipal corporation herein called "CITY".
RECITALS
WHEREAS, Contractor and City are parties to an agreement dated
February 7, 2006 for consultant services; and
WHEREAS, the parties desire to amend the agreement to extend the
services for additional services and fees stated in the attached letter; and
NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE
AS FOLLOWS:
1. That the agreement between the CITY OF NATIONAL CITY and
PROJECT DESIGN CONSULTANT, dated February 7, 2006, is hereby
amended by amending the scope of work thereof, as set forth in the
attached Exhibit "A".
2. All other terms, covenants and conditions contained in the original
agreement shall remain in full force and effect and shall be applicable
to this amendment.
Dated:
March 6
, 2007
CITY 0 TIONAL
CITY PROJECT D SIGN CONSULTANTS
By: vim _ By:
Ron Morrison ame) �� e
Mayor ( s�/7 e PV/c t
(Titl
By:
( ame)Gf-v
(Title)
APPR A� TOJORM:
�ORM:
George iser, III
City Attorney
r
PROJECT DESIGN CONSULTANTS
Tut 13 STREET. Sore $00 6,1E235.1,.;7 TPf.
SAN Dim°, CA 92.1
n1q.2 4.0:49 FAX
CPivp.T'I JECTlESIC>. CO\1
File: BD-GEN
F07-67
February 15, 2007
1'agc 1 of 2
EXHIBIT 'A' - SCOPE OF WORK
AMENDMENT TWO
NATIONAL CITY BLVD/FOUNTAIN PLAZA IMPROVEMENTS
The following is a sun -unary of the scope of work for Amendment 2 to the National City
Rlvd/Fountain Plaza Improvement Contract with Project Design Consultants (PDC). A detailed
cost breakdown is shown in Attachment "C".
1. ADDITIONAL CONTRACT SERVICES
A. Geophysical And Soil Gas Suivevs:
I. Obtain encroachment permit to collect soil gas samples at 11 locations.
2. Mark out sidewalks for USA
3. Perform geophysical survey on six City Blocks along National City Blvd.
(Four on the east side between 8th and 12th Avenue and two on the west
side between Plaza and 12th)
4. Collect and rush analyze 11 soil gas samples at three feet below grade.
5. Prepare addendum report summarizing results
FIXED FEE $ 15,000
B. Additional Design Surveys: The original contract included aerial mapping and
design surveys for the sidewalk and medians for National City Blvd and 9th Ave
from National City Blvd to the alley between National City Blvd and A Street.
Following the public workshops it was decided to extend the 9th street
improvements east to A Street requiring additional design surveys and mapping.
In addition, additional design surveys were needed along the right-of-way
between 7th Avenue and 12th Avenue to check compliance with ADA.
FIXED FEE $ 4,000
R:IN'P'\,CO\TRAC r.F07 r07.d7SCP-AMD2.doc
SA\ VIF70 • PHOENIX • TIi1IECUI.A • BAKERSFIEI.D
r
PROJECT DESIGN CONSULTANTS
File: BD-GEN
F07-67
February 15, 2007
Page 2 of 2
C. Additional Public Outreach: The original scope of work included two public
workshops to refine and finalize the project elements. Because of the interest in
the project, additional public outreach effort was required. The effort included the
preparation, attendance and follow up of four additional meetings with interest
groups and two council hearings. The additional meetings required the
preparation of additional alternatives and changes to the proposed design.
FIXED FEE $ 32,200
D. Preparation of The General Provisions of the Specifications: The original scope
included only the preparation of the technical provisions of the specifications.
Because of the state and federal funding, PDC prepared the General Provisions
incorporating the Federal and Caltrans requirements into the City of National City
format.
FIXED FEE $ 10,100
E. Additional Construction Services: The original scope included limited
construction services. PDC's role has grown to include construction management
by a subconsultant and construction staking. The expanded role will require
additional project management involvement in the construction phase during the
eight month construction period as well as attendance at construction meetings as
required and the developing, designing and processing of construction changes.
FIXED FEE $ 5,350
TOTAL FIXED FEE CONTRACT AMOUNT $ 66,650
R:l WP:CONTRACT\FO71FO7-67SCP-AMD2.1oc
ATTACHMENT C
NATIONAL CITY BOULEVARD
CITY OF NATIOANL CITY, CA
ADDITIONAL CONTRACT SERVICES
PROJECT DESIGN CONSULTANTS
Servo Senior Sericr 2-Man
Project Project Pend
CIVIL P rojed Landscape Landsraoe Landscape LANDSCAPE Survey/Mop Survey Leighton 8
TASK
Manager Engineer Processor ENGINEERING Manager Architect Arcttoct Designer ARCHITECTURE Tech II Crew Assoc.
DESCRIPTION 5180 530 S65 TOTAL $150 $110 5100 S95 TOTAL 595 5195 TOTAL Additional Design Surveys TOTAL
Geophysical and Sod Gas Surveys
4.7 Additional Pubic Outreach 16 40 S 8.08C
7 11 Preparation of General Prvdsions 20 40 20 S 10100
11.2 Additional Ccnstrudwn Support Services 5 20 $
14
3.5
TOTAL
3 500
104
0
5
0
10
51
36 S 24.120
5
5 1.850
2C
S 4.000
S15 000
S 4,000
5 15,000
S 32,200
S 10.100
S 5.350
S 21.680 $ 25,970 $ 4 00C 515,000 5 66.650
PROJECT DESIGN CONSULTANTS
File: 3265.00
February 20, 2007
Mr. Din Dansehfar
CITY OF NATIONAL CITY
Engineering Department
1243 National City Boulevard
National City, CA 91950
SUBJECT: Amendment Two
Dear Din:
7ni B STRFFT, SUITE Roo
SAN DIEGO, CA 92101
619.2)3.6471 IEL
619.234.0349 FAX
W W W.PROJFCTDF.SIGN.COM
Project Design Consultants (PDC) is requesting, Amendment Two to the existing contract for
the National City Boulevard Streetscape and 9' Street Fountain Plaza Improvements project
to include the following services for the totals shown below:
Geophysical and Soil Gas Surveys
Additional Design Surveys
Additional Public Outreach
Preparation of General Provisions
Additional Construction Services
Total Amount
$ 15,000 (Fixed Fee)
$ 4,000 (Fixed Fee)
$ 32,200 (Fixed Fee)
$ 10,100 (Fixed Fee)
$ 5.350 (Fixed Fee)
S 66,650 (Fixed Fee)
Attached is Exhibit A. the scope of work for each item along with a detailed cost breakdown
in Attachment "C".
All teens and conditions of PDC's original agreement dated February 7, 2006 will apply.
Sincerely,
Gordon K. Lutes, PE
Senior Vice President
Attachments
Gregory M. Shields, PE
Principal/CEO
,At. UII.GO • 1.11OL ,IX • ILMLCLLA • BAKERSFIELD
R:\ W P' CONTRACT,FOT,F07-6A.TR-AMD2.doc
RESOLUTION NO. 2007 — 36
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
AUTHORIZING THE MAYOR TO EXECUTE AMENDMENT TWO TO
THE CURRENT AGREEMENT WITH PROJECT DESIGN CONSULTANTS
IN THE AMOUNT OF $66,650 TO PROVIDE ADDITIONAL DESIGN SERVICES
FOR THE NATIONAL CITY BOULEVARD STREETSCAPE
AND 9TH STREET FOUNTAIN PLAZA IMPROVEMENTS
WHEREAS, on February 7, 2006, the City Council adopted Resolution No. 2006-
13, which authorized an Agreement with Project Design Consultants (PDC) to provide the
design services for the National City Boulevard Streetscape and 9th Street Fountain Plaza
Improvements Project in the amount of $442,846; and
WHEREAS, on March 6, 2007, the City Council approved Amendment No. 2 to
amend the Scope of Work to be performed to include construction management and inspection
services and construction staking services, in the not to exceed amount of $195,000; and
WHEREAS, the City and PDC desire to amend the Scope of Work to be
performed pursuant to the Agreement dated February 7, 2006, to include additional design
services, in the amount of $66,650.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the Mayor to execute Amendment No. 2 to the February 7, 2006
Agreement between the City and Project Design Consultants to expand the Scope of Work to
be performed pursuant to the Agreement to include additional design services for the National
City Boulevard Streetscape and 9th Street Fountain Plaza Improvements Project, in the amount
of $66,650. Said Amendment No. 2 to Agreement is on file in the office of the City Clerk.
PASSED and ADOPTED this 6th day of March,
62
ATTEST
Mich el R. Dalla, C' Clerk
APPROVED AS TO FORM:
arm
George H. Eiser, III
City Attorney
Ron Morrison, Mayor
Passed and adopted by the Council of the City of National City, California, on March 6,
2007 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Natividad, Parra, Ungab.
Nays: None.
Absent: Zarate.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
City CI♦ark of the City of National City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a hill, true and correct copy of
RESOLUTION NO. 2007-36 of the City of National City, Califomia, passed and adopted
by the Council of said City on March 6, 2007.
City Clerk of the City of National City, Califomia
By:
Deputy
City of National City, California
COUNCIL AGENDA STATEMENT
MEETING DATE March 6, 2007
7
AGENDA ITEM NO.
(T TEM TITLEResolution of the City Council of National City authorizing the Mayor to execute Amendment Two to
the current agreement with Project Design Consultants in the amount of $66,650 to provide additional design
services for the National City Boulevard Streetscape and 9Th Street Fountain Plaza Improvements (Funding is
through Community Development Commission).
Din Daneshfar Engineering 4387
PREPARED BY DEPARTMENT EXT.
EXPLANATION
See attached explanation.
(Environmental Review X N/A
MIS Approval
Financial Statement
See attached Statement.
Approved By: dmr,ni h �h,l
900/11
Account No.
STAFF RECOMMENDATION
Adopt the Resolution.
frttiVi
BOARD / COMMISSION RECOMMENDATION
N/A
ATTACHMENTS ( Listed Below )
(....1. Resolution
A-200 (Rev. 7/03)
Resolution No. a o o n- 3 6
2. Amendment Two to Contract Agreement
RE: Resolution of the City Council of National City authorizing the Mayor to
execute Amendment Two to the current agreement with Project Design
Consultants in the amount of $66,650 to provide additional design services
for the National City Boulevard Streetscape and 9Th Street Fountain Plaza
Improvements (Funding is through Community Development Commission).
Background
On February 7, 2006 the City Council by Resolution Number 2006-13 approved a
contract agreement between the City of National City and Project Design
Consultants (PDC) to provide the design services for the National City Boulevard
Streetscape and 9Th Street Fountain Plaza Improvements project in the amount
of $442,846.
The proposal for Amendment One ($195,000) to the current contract with PDC
has been included in tonight's City Council agenda for approval to incorporate
the construction staking/engineering services into the original contract. With the
approval of Amendment One the PDC's total contract amount will increase from
$442,846 to $637,846.
Outline of Proposed Amendment Two
The following outlines the additional design services which were added due to
community inputs and additional meetings during the design phase:
1. Additional Design Work
After the execution of the original contract with PDC firm the following design
work was required:
A. Following the public workshops it was decided to extend the 9th Street
improvements east to "A" Avenue requiring additional design surveys
and mapping.
B. Because of the interest in the project, additional public outreach effort
was required. The effort included the preparation, attendance and
follow up of four additional meetings with interest groups and two city
council meetings. The additional meetings required the preparation of
additional alternatives and changes to the proposed design.
C. Because of the state and federal funding. PDC prepared the General
Provisions incorporating the Federal and State requirements into the
City of National City format.
The•PDC's proposed fixed fee for the additional design services (Amendment
Two) is $66,650 (see attached Exhibits "A" for the scope of work). With the
approval of this Amendment the total contract amount will increase from
$637,846 to $704,496.
1
Finance Statement
The amount of original state grant funds allocated for the project was $2,000,000
through the State's Pilot Smart Growth Incentive Program. The total funds
budgeted through Community Development Commission for the project was
$2,335,154. The total budget for the entire project was $4,335,154.
The total awarded contract amount to Portillo Concrete (Contractor) to perform
construction was $3,298,308. The total awarded contract to PDC firm to provide
design services was $442,846. The amount for the proposed Amendment One
was $195,000. With the approval of the Amendment One the total funds
approved for the project will be $3,936,154.
The total estimated construction cost approved by Resolution No. 2007-4 that
included surveying, construction engineering, material testing, and contingency
items was $3,892,308.50. This amount included the proposed lowest bid amount
($3,298,308.50), approximately 2% ($66,000) for surveying, approximately 2%
($66,000) for material testing, approximately 4% ($132,000) for construction
engineering, and approximately 10% ($330,000) for contingencies.
With the proposed additional cost ($66,650) for Amendment Two the total
approved amount will be increased from $3,936,154 to $4,002,804. With this
amendment the remaining amount in the approved budget will be $332,350
which will be available for material testing fees ($66,000) and other potential
costs ($266,350).
Staff Recommendation
It is recommended that the current contract agreement with PDC be amended to
include the proposed additional services.
Project Schedule
A pre -construction meeting was held on January 31, 2007. A notice to proceed
has been issued with a construction commencement date of February 20, 2007.
According to the project specifications the construction should be completed on
October 22, 2007.
2
Financial Statement
The total cost for added work is $66,650. Funding is available through
Community Development Commission (CDC) in the Account No. 900911. The
total estimated construction cost approved by Resolution No. 2007-4 that
included surveying, construction engineering, material testing, and contingency
items was $3,892,308.50. This amount included the proposed lowest bid amount
($3,298,308.50), approximately 2% ($66,000) for surveying, approximately 2%
($66,000) for material testing, approximately 4% ($132,000) for construction
engineering, and approximately 10% ($330,000) for contingencies.
5
City of National City
Office of the City Clerk
1243 National City Boulevard, National City, CA 91950-4397
Michael R. Della, CMC - City Clerk
(619) 336-4226 Fax: (619) 336-4229
March 19, 2007
Mr. Gordon K. Lutes
Senior Vice President
Project Design Consultants
701 B Street, Suite 800
San Diego, CA 92101
Dear Mr. Lutes,
On March 6, 2007, Resolution No. 2007-36 was passed and adopted by
the City Council of National City, authorizing execution of Amendment Two
to a contract with Project Design Consultants.
We are enclosing for your records a certified copy of the above Resolution
and a fully executed copy of the contract.
Michael R. Dalla, CMC
City Clerk
Enclosure
cc: Engineering Department