HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #5 Foodland MarketCHANGE ORDER CIO Number 5 To Healey Construction Co, California C/O Initiation Date: February 1, 2007 Project: Foodland Market Project Specification No.:06-04 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: Relocate one-half inch (1/2") electrical conduit and service located on the roof parapet wall interfering with the proposed tower and screen supports. The total length of conduit and electrical service relocation is approximately 160 linear feet. REASON FOR CHANGE: The contract drawings do not show the electrical conduit on the parapet wall. To construct the screening supports and tower supports the electrical conduit must be relocated. COST RECONCILIATION: Costs were reviewed and negotiated to the satisfaction of the City. The work will be compensated through the project hudget.(See attached detailed breakdown). Construction Contract Accounting Summary: The original Contract Amount (Base Bid) Net change by previously authorized Change Orders The Contract Amount prior to this Change Order With this Change Order request the Contract cost is increased by New Contract Amount Change in Contract Time: Contract Completion Date: Recommended or Approval by: TY PROJECT ANEGE DA 74h7 T $ 290,326.00 $---9711.39 S 300,037.39 $ 1,208.84 S 301,246.23 0 Working Days April 27, 2007 Change Order No. 5 Approved by: HEALEY CONSTKUCTION CO. DATE TY D L PMENT CTI'Y OF NA • ' AL CITY ENGINEER 0 EPARTMENT CC: Construction Pile Inspector -di-o7 OMMISSION DATE (.2.4.- DATE Construction Estimate Page 1 File Name: Foodland Market.Change Order RFI No. 22.est Qty Craft@Hours Unit Material Labor Equipment Total RFI No. 22 City of National City Owner Addr: Office of City Clerk, 1243 National City Blvd National City, CA 91950 Contact: Dean Tel: (619) 336-4380 Fax: (619) 336-4397 Relocate Existing conduit to roof deck sleepers. December 26, 2006 Electrical 1.00—@.0000 Supervision 1.00 CC@1.000 0.00 0.00 0.00 1,075.99 0.00 63.90 0.00 63.90 Total Manhours, Material, Labor, and Equipment: 1.0 0.00 63.90 0.00 63.90 Total Only (Subcontract) Costs: 1,075.99 Subtotal: 1,139.89 1.00% Insurance: 11.40 5.00% Profit: 57.56 Estimate Total: 1,208.85