HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #7 Foodland MarketCHANGE ORDER
C/O Number 7
To Healey Construction Co, California
Project: Foodland Market
Project Specification No.:06-04
CIO Initiation Date: March 26, 2007
A Change Order is hereby recommended for the following work in the amount identified in this
document:
DESCRIPTION OF CHANGE:
This change provides for the installation of two (2) twenty amp electrical circuits which will
provide power to the "MERCARDO" signs. The MERCARDO signs are provided by others
outside the scope of work of the Foodland Market contract. For greater public visibility, the
National City project team recommended illuminating the MERCADO signs The electrical work
includes two separate designated electrical circuits for each MERCARDO sign located on the
west -facing awning and the south -facing awning. The electrical circuits will meet current
electrical code standards and this change order will provide all labor, equipment, supports,
supervision, and permitting as needed for a complete and operable electrical system to the
proposed MERCADO signs. The electrical circuits will be from waterproof construction
including conduit, and pullboxes. The circuits will originate from Fooland Market's existing
electrical sub -panel located on the west facing interior building elevation. Also included in this
change order is the removal and disposal of abandoned steel rails located on top of the west -
facing awning. Disposal shall be in a legally permitted recycle center or landfill. The steel railing
system interferes with the MERCADO sign desired location on the west awning. The final item
in this change order is the illumination of the proposed tower clock.
REASON FOR CHANGE:
In order to provide greater visibility of the MERCADO sign and proposed clock tower. National
City Staff recommends that both the MERCADO signs and clock be provided with illumination
capabilities. The MERCADO sign is provided under a separate contract without electrical power.
The Foodland Market contract requires close cooperation and coordination between the
MERCADO sign installation and the work under contract. In order to save cost and expedite the
work, Healey Construction will provide the required power to light the MERCADO signs. This
change order will also add illumination to the proposed clock. Power for the clock is included in
the original contract and the cost now is minimal to upgrade the clock from a standard face to an
illuminated face.
COST RECONCILIATION
Costs were reviewed and negotiated to the satisfaction of the City. The work will be
compensated through the project budget. The cost includes all labor, equipment, supervision,
insurance, bonding and permitting to provide a complete working system for the illumination of
the MERCADO sign and tower clock. No additional contract time is required. (See attached
detailed breakdown).
Change Order No. 7
Construction Contract Accounting Summary:
The original Contract Amount (Base Bid)
Net change by previously authorized Change Orders
The Contract Amount prior to this Change Order
With this Change Order request the Contract cost is increased by
New Contract Amount
Change in Contract Time:
$ 290,326.00
$ 13,599.47
$ 303,925.47
$ 4,388.43
$ 308,313.90
0 Working Days
Contract Completion Date: April 27, 2007
Recom ded for Approval by:
7PR
CIT O MANEGER
Approved by:
HEALEY CONSTRUCTION CO.
COMM
DATE
DATE
LOPMENT COMMISSION DATE
yy1/11
5 - 6la F- U ¢-
Y OF NATIONAL CITY DA
VT
GINEERING DEPARTMENT
CC: Construction File
Inspector
vr,,,,,1, I,..IILL VVIIV I I\VV I 1 V1\ VV,
IYV. I IV/
r, J
Construction Estimate
File Name: Foodland Market.Change Order RFI No. 33.est Page 1
Qty Craft@Hours Unit Material
RFI No. 33 Labor Equipment Total
City of National City
Owner Addr: Office of City Clerk,
1243 National City Blvd
National City, CA
91950
Javier Saunders
Tel: (619) 236-1778
Fax: (619) 336-4217
Electrical Additions.
March 06, 2006
1. Move the Fire Alarm Bell
1.00--@.0000 --
0.00 0.00 0.00
100.00
2. Move the condute out of the area requiring the Graphic Art Work
1.00 __@.0000
0.00 0.00 0.00
100.00
3. Install 2 Designated circuts for each of the Lighted Mercado Signs.
1.00--@.0000 --
0.00 0.00
Total Only (Subcontract) Costs:
Subtotal:
1.00% Insurance:
5.00% Profit:
Estimate Total:
0.00 3,100.00
3, 300.00
3,300.00
33.00
166.65
3,499,65
„",,1 ��,U �n
j
Construction Estimate Page 1
File Name: Foodland Market.Change Order RFI No. 31.est
Qty Craft@Hours Unit Material Labor Equipment Total
RFI No. 31
City of National City
Owner Addr: Office of City Clerk,
1243 National City Blvd
National City, CA
91950
Contact: Dean
Tel: (619) 336-4380
Fax: (619) 336-4397
Internal Lighting for the Clock
February 13, 2006
Lighting
1.00
--@..0000
0.00 0.00 0.00 193.20
Total Only (Subcontract) Costs: 193.20
Subtotal: 193.20
1.00% Insurance: 1.93
15.00% Profit: 29.27
Estimate Total: 224.40
GVV! V,JUI111 IILnLLI V VIIJ I IIUV I IVIY VV.
iuo, I I U l r. Z
Construction Estimate Page 1
File Name: Foodland Market.Change Order RFI No. 34.est
Qty Graft@Hours Unit Material Labor Equipment Total
RFI No. 34
City of National City
Owner Addr: Office of City Clerk,
1243 National City Blvd
National City, CA
91950
Javier Saunders
Tel: (619) 236-1778
Fax: (619) 336-4217
March 06, 2006
Remove the Old Electrical & Lighting materials from the Awning in 2 Locations.
Labor to Remove & Dispose.
2.00 CC@8.000 --
10.00 512.00
50.00 572.00
Total Manhours, Material, Labor, and Equipment:
8.0 10.00 512.00 50.00 572.00
Subtotal: 572.00
1.00% Insurance: 5.72
15.00% Profit: 86.66
Estimate Total: 664.38