Loading...
HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #8 Foodland MarketCHANGE ORDER To Healey Construction Co, California Project: Foodland Market Project Specification No.:06-04 C/O Number 8 C/O Initiation Date: May 4, 2007 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: This change order provides for: 1) the change in design of the proposed steel tower to the existing Foodland building structure from a wooden support system to a steel support system. and 2) relocation of both a rotating and mechanical vent on the roof in conflict with the screen let in braces. and tower connection to the existing truss system. The existing roof framing as show on drawing sheet A1.2 does not accurately reflect the existing roof geometry and location of the existing drainage swale. The project plans also require the contractor to remove and replace the roof system for impacts caused by the new tower construction. The contractor proposed to eliminate the wood framing supports and associated roof removal and substitute with a complete steel structural tower that sits elevated over the existing roof system. The change provides for the substitution of the wooden "paraellem" support beam with a W14X30 steel beam. The three (3) wooden cross support "paraellem" beams are substituted with TS5 steel beams. Connections will now be direct steel to steel connections, steel support to the existing masonry parapet, and steel post to existing truss support as shown on the shop drawings submitted on April 12, 2007 by Healey (subcontractor Western Steel). All material and labor, connections, welding, masonry connections and modifications, truss support modifications, roof repairs, incidents, supervision, and special inspection, will he provided by Healey Construction at no cost to the City in order to provide a complete steel tower system as submitted by Healey Construction in the Western Steel Shop Drawings dated April 12, 2007, sheets E1-E3, and sheets 1-14.This change will provide for a 64 working day time extension at no additional cost to the City and no additional extended overhead costs granted to Healey Construction. The total cost to the City for modifications of the tower support system is $0.00 (zero) dollars. The new contract completion date is August 08, 2007. The second item on this change order provides for the relocation of the rotating and mechanical vents on the roof that are in conflict with the screen let in brace and the steel tower support. The mechanical vent will be shorted to accommodate a let —in brace for the screen system. Work includes replacing the vent length and moving the base and electrical system. The rotating vent must also be removed to accommodate the new steel tower. Work includes material, labor, roof repair, roof repair warranty (5-years), coordination, and supervision. Total change order cost to move both the rotating and mechanical vents is $ 2,055.20 Change Order No. 8 REASON FOR CHANGE: The existing roof framing as show on drawing sheet Al .2 does not accurately reflect the existing geometry and location of the existing drainage swale. The contractor has stated that the roof would require extensive removal and replacement to provide the proper slope and drainage. A meeting was held at the project site to review the existing conditions with thc project Architect and Engineer. Healey construction proposed an elevated all steel structure that would keep the existing roof system as -is. Healey also indicated the cost differential would be minimal and would not exceed the cost between the use of wood members and steel members. Although the project plans require thc contractor to replace and remove the roofing as necessary, the acceptance of this change order will avoid a potential dispute between the roof replacement limits and costs. The replacement of the mechanical and rotating vent is necessary to avoid conflicts with the proposed screen structure let -in brace and the proposed steel tower. Alternatives were investigated and it was determined the most cost effective method is to relocate the vents from interfering with the proposed work. COST RECONCILIATION: The tower steel frame design change from wooden beams to an all steel frame design is a no cost change to the City. This change will provide for a 64 working day time extension at no additional cost and no additional extended overhead costs to the City. The rotating and mechanical vent costs were reviewed and negotiated to the satisfaction of the City. The work will be compensated through the project budget. The cost includes all labor, equipment, supervision, insurance, bonding and permitting to provide a complete working system for the relocation of the vents (see detailed breakdown). Construction Contract Accounting Summary: The original Contract Amount (Base Bid) Net change by previously authorized Change Orders The Contract Amount prior to this Change Order With this Change Order request the Contract cost is increased by New Contract Amount Change in Contract Time: S 290,326.00 $ 17,987.90 $ 308,313.90 $ 2,055.20 S 310,369.10 64 Working Days Contract Completion Date: August 08, 2007 Recommended for Approval by: CIT OJE GER DATE Change Order No. 8 Approved by: H EALEY CONST I CTION CO. DATE COMM k/yo? ELOPMENT COMMISSION DATE Y OF NATIONAL CIT .NGINEERING DEPARTMENT CC: Construction File Inspector n OA E 11 !vv. i I)o r. L Construction Estimate Page 1 File Name: Foodland Market.Change Order RFl No. 21.est Qty Craft@Hours Unit Material Labor Equipment Total RFI No. 21 City of National City Owner Addr: Office of City Clerk, 1243 National City Blvd National City, CA 91950 Contact: Dean Tel:, (619) 336-4380 Fax: (619) 336-4397 Move Mercanical Exaust Fan. December 27, 2006 Disassemble Cut & Reassemble Piping (or Replace if needed ) 1.00 CC@4.000 -- 52.80 256.00 13.73 322.53 Move Machine 1.00 CC@4,000 147.60 256-00 30.00 433.60 Move Electrical 1.00--@.0000 0.00 0.00 0.00 272.40 Total Manhours, Material, Labor, and Equipment: 8.0 200.40 512.00 Total Only (Subcontract) Costs: 5 `lo Nov041.4n (ImFvr Subtotal: 1.00% Insurance: 15.00% Profit:. tSX)aat++> Estimate Total: 43.73 756.13 272,40 /3.6Lr 1,82815-3 I, 64z. 10.29 z 1t3.42 -- F w.4 -1,14n of M No. t 17 b r. J Construction Estimate Page 1 File Name: Foodland Market.Change Order RFI No. 20.est Qty Craft@Hours Unit Material Labor Equipment Total RFI No. 20 City of National City Owner Addr: Office of City Cleric, 1243 National City Blvd National City, CA 91950 Contact: Dean Tel: (619) 336-4380 Fax: (619) 336-4397 Move Rotating Vent. = = _.___. ..-ECG aG.J December 26, 2006 Remove Fan 1.00 CC@1.000 -- 0.00 63.90 13.68 77.58 Cut in & Install New Fan 1.00 CC@3.500 -- 151.10 224.00 28.50 403.60 Patch Hole ( Backing, Plywood & Roofing Material 1.00 CC@4.000 -- 28.50 256.00 0.00 284.50 Total Manhours, Material, Labor, and Equipment: 8.5 179.60 543.90 Subtotal: 1.00% Insurance: 15.00% Profit: 42.18 765,68 765.68 7.66 116,00 Estimate Total: 889.34 Letter of Transmittal WE ARE SENDING YOU is Attached Under separate cover via items: Shop Drawings Co nv of Letter Prints Change Order Plans _ Samples Harris & Associates Program Managers Construction Managers Civil Engineers the following Agreements ,c 4 k 0� ,Wr6 � ` y il X , ..« rw , 311-410 .4- C t-,Ac. 02-o rs,2 t4, 'j - 4 c/a{& t AJA-Ls 'St 6 /..) &0 a 1 1-intoi 5f 41 o"I zi- CA- +-46 C 02. u i, - t-E- 5,41ltv) 62441.J4 L_S THESE ARE TRANSMITTED as checked below: 1 For Approval _ For Your Use/Records _ As Requested _ For Review and Comment REMARKS: COPY TO FOR BIDS DUE Approved as Submitted _ Approved as Noted _ Returned for Corrections _ For Signature Resubnut , Copies for Approval Submit _ Copies for Distribution Return Corrected Prints fk,_ttit% EzWTL� J crNt<. Fes- su,,z 200 Prints returned after loaned to us (TLV SE atJ .sL>(D (2C,--( it/-+J dIJ Lc 02(�c tyt(� ID C-08iS''i%t lvw Or C-0 Jos — �"l j}„t/S 750 B Street, Suite 1800, San Diego, California 92101 (619) 236-1778 FAX (619) 236-1179