Loading...
HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #10 Foodland MarketCHANGE ORDER 'ro Healey Construction Co, California Project: Foodland Market Project Specification No:06-04 CIO Number 10 C/O Initiation Date: July 31, 2007 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: This change order provides for a time extension of 59 working days for the time from Juno 29, 2007 to September 14, 2007 for work placed in abeyance on the steel tower and screen structure. The addition of 59 working days extends the contract completion date to October 31, 2007. On June 20, while bolting the supports for the steel tower on the existing masonry parapet wall it was discovered the existing masonry parapet wall is of partially unreinforced masonry construction and not solid grouted. This created a changed condition that required redesign of the tower and steel structures hold-down connection to the existing parapet wall. As a result, the work to the tower has been put on abeyance in order to conduct a rebar survey of the parapet wall, redesign the connection details, obtain City Building Department approval, and gain City Council approval. This change provides for a time extension of 59 working days. This change order in the amount of S 2,527.44 will compensate the contractor for all costs associated with the time extension. Costs include storage bin, restroom rental, fencing, supervision, labor, and all field and office overhead costs, A follow up change order will compensate the contractor for work from June 20, 2007 to June 28, 2007 and new work to accommodate a revised tower and screen detail connection to the parapet wall. REASON FOR CHANGE: On June 20, during preparation of the base supports for the steel tower, details sheet 1 and 5E3 of the shop drawings, the contractor discovered the wedge bolts were not developing the required strength. A section of the masonry parapet wall was exposed to determine the cause of the poor bolt strength. It was discovered that the existing parapet masonry wall is of partially unreinforced masonry construction and not of solid masonry construction. Subsequently, the City requested that a ground penetrating radar survey of the parapet wall be conducted and the engineer of record redesign the connection details to safely transfer the loads and reflect the partially unreinforced masonry construction. This change order will compensate the contractor for a time extension for an additional 59 working days. Although minor work was able to continue on the roofing repair, and slurry seal, the installation of the tower and screen steel structures are the critical path for project completion. RECEIVED i? 13 2007 Deve:• mmissicn Change Order No. 10 COST RECONCILIATION: Construction Contract Accounting Summary: The original Contract Amount (Base Bid) Net change by previously authorized Change Orders The Contract Amount prior to this Change Order With this Change Order request the Contract cost is increased by New Contract Amount $ 290,326.00 $ 24,416.86 $ 314,742.86 $ 317,270.30 Change in Contract Time: 59 Working Days Contract Completion Date: October 31, 2007 Recommended for Approval by: -g /Z 7 DAT Approved by: HEALEY CO ' UCTJON CO. DATE COMMU,VELOPMENT COMMISSION DATE .ITY l AT NAL TY DATE ENG ' EERING DEPARTMENT CC: Constriction File Inspector 514tr/07 J 44/0 Construction Estimate Page 1 Qty Craft@Hours Unit Material Labor Equipment Total City of National City Owner Addr: Office of City Clerk, 1243 National City Blvd National City, CA 91950 Changes related to shutdown by City of National City June 28, 2007 4 July 02, 2007 ( Monday ) Remove Fencing as requested by Javier David Brothers 1.00 CC@2.260 -- 28.25 176.28 0.00 204.53 Equipment. Boom Lift. (600S/A $325 a day plus insurance 15% tax & 0.775% Total $433.69 a day ) 2.50--@.0000 -- 0.00 0.00 525.09 Coronado Mobil Storage. Storage Container. ($85.00 a month ) 2.50--@.0000 Diamond Environmental Services. Porter Potty. ($91.00 a month ) 2.50--@.0000 -- National Construction Rentals. Fencing. 1.00 CC@2.825 0.00 0.00 0.00 0.00 28.25 220.35 Total Manhours, Material, Labor, and Equipment: 5.1 56.50 525.09 240.12 240.12 257.07 257.07 700.60 949.20 396.63 1,722.89 2,176.02 Subtotal: 2,176.02 1S crD 'jz6.'�'J 5,9g0/5 Overhead: (341(ii 180 : ; _ � - To 5":221502. 1C9'.49Wtlfrafit: 9 1P tNs�Pr+.� Estimate Total: L,VI r, VA-tJ 2,y,