HomeMy WebLinkAbout2007 CON Koch Armstrong - Change Order #1 Street Resurfacing Project FY 06-071)A'I'E:
PROJECT:
CONTRACT CHANGE ORDER NO. 1
10/ 16il07
National City Street Resurfacing Project, FY 06-07
Specification No. 06-03
John Armstrong, President
Koch -Armstrong General Engineering, Inc.
P.U. Box 1190
Lakeside, CA 92040
DESCRIPTION OF CHANCE:
Ibis change order is written to add work to item numbers 3, 4, 6, 8 through 12. 15 and 16
to the contract.
ltcm_
1 \'lobiliiation
�Traffic Control
Current Contract
_-r- + Unit 1 Hid Qtv Unil Price I Amount
LS I S27.200.00 S27.200.00
LS
3 ' :asphalt Rubber & Aggregate SY
Membrane (AR!>,''1)
4 -ELps II Slarry I SY I 23,855
Asphalt Rubber I -lot rvtix Clap I SF 1 140,471
L
6 Leveling Course including SF 121,863
crack cleaning, speed humps &
misc. etch — __-
7 1 Cold Millini
$41.600.00 1 S41,600.00
8 Adjust Manholes to Grade
1 9 1 Adjust Valve Cans/Hand-holes
to Grade
10 R&RSidewalk ---- SF 617
11 R&R Curb and Gutter i LE 13
12 i R & R Cross Gutter — SF 64
! ! l'ral'ii trillpit L.S 1 1
LI Rcm,t ill l-rallic 1 oLps —_ 1.;1-1 '8
L 15 1 Demo and install ped. ramps EA 1
• 16 Demo and install alley apron SF 1
39,463
SF 43.2I;
EA 14
EA 33
r^ i
S6.20 i S244,670.60
•
Adjusted Contract
(CO #1)
gtv Unit Price I Amount
1 S27,200.00 S27.200.00
1 S41.600.00 ; S41.600,00
44,727 1 $6.20 S277,307.40
$2.80 ! S66,794.00 1 29,119 S2.80 I S81,533.20
51.171 $164,351.07 I 140.471 51.17 5164.351.07
50.66 j 80,429.58 169,231 50.66 5111,692.46�
$0.3 7
S331.00
S156.00
S 15.988.81
43,213
$4,634.00 25
S5,148.00 38
S0.37 S15.988.81
5331.00
$11.00 $6,787.00 1047
S156.00
S8,275.00
$5,928.00
S11.00 $11,517.00
S100.00 ! $1,300.00 126 1 $45.00* $5,670.00
S72.00 I $4,608.00 1905 1 $20.00* 1 $38,100.00 I
518,3200 S18,320.00 1 S18.320.00 1 518,320.00
544000 1 S12,320.00 28 5440.001 512,320.00�
-r 2 $2,720.00 1 $5440.00 1
1117 S34.50 ! S38,536.50
I $694,151.06 1
S863,779.44 -1
Page 1
CONTRACT CHANGE ORDER NO. 1
DISCUSSION:
Line Iteur No. 3 has been increased to provide compensation to the contractor for an
additional 5.264 square yards of Asphalt Rubber and Aggregate Membrane (ARAM).
Line Item No. 4 has been increased to provide compensation to the contractor for an
additional 5.264 square yards of Type 2 Slurry.
Line Item No. 6 has been increased to provide compensation to the contractor for an
additional 47.368 square feet of Leveling Course.
Line ltern No. 8 has been increased to provide compensation to the contractor for an
additional 11 each of Adjust Manholes to Grade.
Line Item No. 9 has been increased to provide compensation to the contractor for an
additional 5 each of Adjust Valve Cans/I lndholes to Grade.
Line item No. 10 has been increased to provide compensation to the contractor for an
additional 430 square feet of Remove and Replace Sidewalk.
Line Item No. 11 has been increased to provide compensation to the contractor lbr an
additional 1 1 3 linear feet of Remove and Replace Curb and Gutter.
Line Item No. 12 has been increased to provide compensation to the contractor for an
additional 1.841 square feet of Remove and Replace Cross Gutter.
Line item No. 15 has been increased to provide compensation to the contractor for an
additional 2 each of Demolish and Install Pedestrian Ramps.
Line Item No. 16 has been increased to provide compensation to the contractor for an
additional 1,117 square feet Demolish and Install Alley Apron.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of S169,628.38 from the current
contract price of S694,I5I.06 to a new contract price of S863,779.44.
2. there is no increase in contract time. The contract completion date was
previously established as Tuesday, November 27, 2007.
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment. profit, overhead. and all incidentals for performing
the work described above. Koch -Armstrong General Engineering, Inc. will not be entitled
Page 2
CONTRACT CHANGE ORDER NO. 1
to damages or additional payment for delays as described in the 1997 edition of the
Standard Specifications for Public Works Construction, Section 6-6.3, for performing the
work as described above.
RECOMMENDED FOR APPROVAL BY:
Alberto nccr
:1PPROVED BY:
Chris Arntg. President
Koch -Armstrong (General Engineering, Inc.
Monty Koch
Koch -Armstrong General Engineering, Inc.
G0'-f7-o7
Date
/0—/7-07
Date
o. -
Marvain baki. City Engineer Date
Page 3
RESOLUTION NO. 2007 — 237
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NUMBER ONE WITH KOCH-ARMSTRONG
GENERAL ENGINEERING, INC. FOR THE NATIONAL CITY
RESURFACING PROJECT, FY 2006/07, IN THE AMOUNT OF $169,628
FOR THE PAVING OF TWO ADDITIONAL STREET
WHEREAS, on April 5, 2007, the City Council adopted Resolution No. 2007-62
awarding a contract to Koch -Armstrong General Engineering, Inc. in the amount of $694,152 for
the construction of the National City Street Resurfacing Project; and
WHEREAS, recently the California Integrated Waste Management Board
(CIWMB) awarded a grant to the City in the amount of $150,000 for the use of crumb rubber
from used tires in the rubberized asphalt for the National City Resurfacing Project; and
WHEREAS, as a result of being award the grant funds, two additional city streets
were paved to improve road conditions: N Avenue from East 81h Street to the south end of East
9'h Street due to deteriorated pavement condition and two broken concrete cross gutters, and F
Avenue from East 24'h Street to East 26'h Street due to the Toss of the wearing surface of the
asphalt.
NOW, THEREFORE, BE IT RESOLVED that the City Council hereby authorizes
the City Engineer to execute Change Order Number One with Koch -Armstrong General
Engineering, Inc. in the amount of $169,628 for the paving of two additional streets as part of
the National City Street Resurfacing Project, FY 2006/07.
PASSED and ADOPTED this 16th day of Octo
Ron Morrison, Mayor
ATTEST:
Mic ael R. Dalla, ity Clerk
APPROVED AS TO FORM:
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, Califomia, on October
16, 2007 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Natividad, Parra, Ungab, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
City itterk of the City of National City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2007-237 of the City of National City, California, passed and
adopted by the Council of said City on October 16, 2007.
City Clerk of the City of National City, California
By:
Deputy
g.00r1-1�
City of National City, California
COUNCIL AGENDA STATEMENT
MEETING DATE October 16, 2007
AGENDA ITEM NO.
4
ITEM TITLE Resolution of the City Council of National City approving contract Change Order Number One to
Koch -Armstrong General Engineering, Inc. for the National City Resurfacing Project, FY 06-07, in the amount of
$169,628 for two additional streets being paved and various items, and authorizing the City Engineer to approve and
sign the change order. (Funding for this project is provided by a grant from the Califomia Integrated Waste
Management Board and Traffic Congestion Relief Fund)
PREPARED BY Alberto Griego DEPARTMENT Engineering' 4386
EXPLANATION
Please see attached.
Environmental Review X N/A
MIS Approval
Financial Statement
See attached Financial Statement Explanation.
Approved By%:
Finance Director
Account No.
STAFF RECOMMENDATION
Ado • t the Resol
/ COMMlSSf6N RECOM ' NDATION
N/A
ATTACHMENTS (Listed Below) Resolution No. ' OO'1 • a 3 `1
1. Resolution
2. Contract Change Order Number One
Col
A-200 (Rev. 7/03)