HomeMy WebLinkAbout2007 CON Koch Armstrong - Change Order #2 Street Resurfacing Project FY 06-07CONTRACT CHANGE ORDER NO. 2
DATE: 10/ 16/07
PROJECT: National City Street Resurfacing Project, PY 06-07
Specification No. 06-03
TO:
John Armstrong, President
Koch -Armstrong General Engineering, Inc.
P.O. Box 1 190
Lakeside, CA 92040
DESCRIPTION OF CHANGE:
This change order is written to add item numbers 17 to 23 to the contract for paving City
hall Upper Parking Lot .
Item
Current Contract
Unit
I LS
Bid Qtv I Unit Price
S27.200.00
l''afl ie Control LS
3 .Asphalt Rubber & .Aggregate
:Membrane (ARAM)
I ! Type 11 Slurry
Asphalt Rubber Hot Mix (iap
Graded
SY 11.727
S41,600.00
S6.20
Amount
$27.200.00
S41,600.00
$277,307.40
Adjusted Contract
(CO #2)
Unit Price ! Amount
1
1
44.727
29.119
S2.80
$81.533.20 29.119
SF
li I..e\cling Course including crack
cleaning, speed humps Fi, misc.
patch
7 (..old \lillinu
,Adjust !Manholes to Grade
I
140.171
169.231
$1.17
$164.351.07
140.471
$27.200.00
S41,600.00
S6.20
$2.80
S1.17
S27200.00
$11.600.00
S277,307..10
S81,533.20
S164,351.07
$0.66
S 111,692.46 169,231
Adjust Vale Cans/Hand-holes to
(Grade
10
i1
12
13
14
15
R&R Sidewalk
Sr 43.213
S0.37
$15,988.81 1 43.213
1{�1
?5
$331 00
$8.275.00 25
R&R Curb and Gutter
R & R Cross Gutter
Traffic Stripping
Reinstall Traffic Loops
Demo and install ped. ramps
16 Demo and install alley apron
17 Remove and replace 6" A.C.
Dike
IS
19
FA
s 1-
LF
SF
I.S
FA
38 $156.00
1047
126
1905
1
S5,928.00 38
$11.00
S11.517.00
1047
S0.66 $11I,692.46
S0.37
S 15,988.81
$45.00*
S20.00
S5.670.00
126
$331.00
$8.275 111)
S 156.00
$11.00
$45.00*
$38.100.00 I 1905
S 18.320.00
S 18,320.00
S440.00
$12.320.00
FA
SF
)..F.
Construct G-1 Concrete Curb
Cold Plane Existing A.C. 6'
Wide, 0-1.5" deep
20 1)igout and Patch Failed Areas
with 4" Asphalt Concrete
Subtotal
L.F.
S2.720.00
1117 S3.1.50
S5440.00
S38.536.50
28
2
All%
137
$20.00*
S 18.320.00
S440.00
S5.928.00
SI1,517.00
$5,670.00
S38,100.011
S 18,320.00
S 12.320.00
S2.720.00
$5440.00
S3450
$38.516.50
93
15.76
49.47
3164
3351
0.94
2,159.12
4,600.71 _
2,974.16
4.06 13,605.06
S887,118.4
Page 1
22
23
Clean, Tack, Install 1.5"
Asphalt Overlay
Sand Seal
Stripping
Total
CONTRACT CHANGE ORDER NO. 2
S.F.
I S.F.
DISCUSSION:
Added line items:
,. S.
22000
$863 779. 1,1
1.04
22000 0.07
1
940.95 '
Line Item No. 17 has been added to provide compensation to the contractor for 137 linear
feet of Remove and Replace 6" Asphalt Concrete Dike.
Line Item No. 18 has been added to provide compensation to the contractor for 93 linear
feet of Construct G-1 Concrete Curb.
Line Item No. 19 has been added to provide compensation to the contractor for 3,164
square feet of Cold Plane Existing Asphalt Concrete 6' wide, 0-1.5" deep.
Line Item No. 20 has been added to provide compensation to the contractor for 3,351
square feet of Digout and patch failed areas with 4" Asphalt Concrete.
Line Item No. 21 has been added to provide compensation to the contractor for 22,000
square feet of Clean, Tack Coat and install 1.5" of Asphalt Overlay.
Line Item No. 22 has been added to provide compensation to the contractor for 22,000
square feet of Sand Seal.
Line Item No. 23 has been added to provide compensation to the contractor for 1 I.ump
Sum Stripping.
CONTRACT AD.ItiSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of $48,700 from the current
contract price of S863,779.44 to a new contract price of $912,479.44.
2. There is no increase in contract time. The contract completion date was
previously established as Tuesday, November 27, 2007.
22,880.00 I
1,540
940.95
5912,479.41
Page 2
CONTRACT CHANGE ORDER NO. 2
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit, overhead, and all incidentals for performing
the work described above. Koch -Armstrong General Engineering, inc. will not be entitled
to damages or additional payment for delays as described in the 1997 edition of the
Standard Specifications for Public Works Construction, Section 6-6.3, for performing the
+ork as described above.
RECOMMENDED FOR APPROVAL, BY:
Alberto Gri=go, As
APPROVED BY:
inccr
Chris Arm ong, President
Koch -Armstrong General Engineering, Inc.
1,(
Monty Kc ch
Koch -Armstrong General Engineering, Inc.
Maryam j3abaki, City I:ngine r Date
/°-17_cr?
Date
10-17-07
Date
11-"1 -o-1
Page
RESOLUTION NO. 2007 — 238
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE
CHANGE ORDER NUMBER TWO TO KOCH-ARMSTRONG
GENERAL ENGINEERING, INC. FOR THE NATIONAL CITY
RESURFACING PROJECT, FY 2006/07, IN THE AMOUNT OF $48,700
FOR PAVING OF THE CIVIC CENTER'S UPPER PARKING LOT, AND
APPROVING THE TRANSFER OF FUNDS IN THE AMOUNT OF
$57,002 TO THE PROJECT EXPENDITURE ACCOUNT FOR
THE NATIONAL CITY RESURFACING PROJECT
WHEREAS, on April 5, 2007, the City Council adopted Resolution No. 2007-62
awarding a contract to Koch -Armstrong General Engineering, Inc. in the amount of $694,152 for
the construction of the National City Street Resurfacing Project; and
WHEREAS, Change Order No. 1 provided for two additional streets to be paved
with a cost in the amount of $169,628 for paving and street improvement work; and
WHEREAS, Change Order No. 2 provides for the repair and paving of the Civic
Center's upper parking lot at the cost of $48,700; and
WHEREAS, a transfer of $41,190 from Account No. 001-409-500-598-
6031 (50/50 Alley Improvements) and $15,812 from Account No. 001-409-500-598-
6150 (Electric Meter Box) to the National City Street Resurfacing Project Account No.
001-409-500-598-6035 is necessary to fund Change Order 2.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the following appropriation and transfer of funds:
FROM:
Account No. 001-409-500-598-6031
(50/50 Alley Improvements )
$41,190
Account No. 001-409-500-598-6150
(Electric Meter Box)
$15,812
TO: Account No. 001-409-500-598-6035
National City Street Resurfacing Project
TOTAL AMOUNT: $57,002
PURPOSE: To fund Change Order No. 2 for the repair and
paving of the Civic Center's upper parking lot
Resolution No. 2007 — 238
October 16, 2007
Page 2
BE IT FURTHER RESOLVED that the City Council hereby authorizes the City
Engineer to execute Change Order No. 2 with to Koch -Armstrong General Engineering, Inc. in
the amount of $48,700 for the repair and paving of the Civic Center's upper parking lot as part if
the National City Street Resurfacing Project
PASSED and ADOPTED this 16th day of October07.
on Morrison, Mayor
ATTEST: yMic ael R. Della, ity Clerk
APPROVED AS TO FORM:
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on October
16, 2007 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Natividad, Parra, Ungab, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
City erk of the City o ational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2007-238 of the City of National City, California, passed and
adopted by the Council of said City on October 16, 2007.
City Clerk of the City of National City, California
By:
Deputy
C croon- ‘1
City of National City, California
COUNCIL AGENDA STATEMENT
.MEETING DATE October 16, 2007
AGENDA ITEM NO.
5
ITEM TITLE Resolution of the City Council of National City approving contract Change Order Number Two to
Koch -Armstrong General Engineering, Inc. for the National City Resurfacing Project, FY 06-07, in the amount of
$48,700 for paving of the City Hall Upper Parking Lot and authorizing the City Engineer to sign the change order and
approving the transfer of funds from two non -departmental General funding Accounts (carry forward funds from FY
06-07) in the total amount of $57,002 to the project expenditure account for National City Street Resurfacing Project
(the funding will be available through two General Funding accounts that were carried forward from FY 06-07)
PREPARED BY Alberto Griego DEPARTMENT Engineering EXT. 4386
EXPLANATION
Please see attached.
Environmental Review X NIA
MIS Approval
Financial Statement Approved By:
Finance Director
Transfer funds from Account Number 001-409-500-598-6031 in the amount of S41,190 and from Account Number
001-500-598-6150 in the amount of $15,812 to the National City Street Resurfacing Project Account with a new
assigned account number (001-409-500-598-6035).
Account No.
STAFF RECOMMENDATI
BOARD / COMMISSION RECOMMENDATION
N/A
ATTACHMENTS (Listed Below)
1. Resolution
2. Contract Change Order Number Two
Resolution No. a o o rl• a $1