HomeMy WebLinkAbout2007 CON Koch Armstrong - Change Order #3 Street Resurfacing Project FY 06-07CONTRACT CIIANGT ORDER NO. 3
No
DATE: 12%04'07
PROJECT: National City Street Resurfacing Project, 1 Y 06-07
Specification No. 06-03
T 0: John Armstrong, President
Koch -Armstrong General Engineering, Inc.
P.O. Box 1 190
Lakeside, CA 92040
DESCRIPTION OF CHANCE:
I'his change order is written to add item number 24 to the contract for crack repair and
coating ol'tennis courts at El Tovon and Las Palmas Park
Current Contract Adjusted Contract
(CO #3
Item
Mobilization
Traffic Control
Asphalt Rubber & Aggregate
\iembrane (,\ RANI)
1 \ pc II Slurp
.\sphall Kuhhcr I lot Mix Gap
traded -
Unit Bid Qtv Unit Price Amount
1,S 1 1 S27,200.00 S27.200.00
1.5; I S41.600.00 S41,600.00
SY 72 r S6.20 S277,307.40
SY 29.119
SF 140.471
S2.80 S81.533.20
6 . Leveling Course including crack
cleaning, speed humps & misc.
patch
SI 17 S164.351,07
Qt'
Unit Price
Amount
SI' I •` 231 S0.66 SI I I.69246
7 _ Cold Milling, SI' I 4s21:> S0.37
• 8 Adjust \Manholes to Grade LA .),s S331.00
I 9 Adjust Valk Cansil land -holes to t:A ::x S156.00
Grade
— t0 R&R Sidewalk Sr 1047
I R&K Curb and Gutter l.f 4 126
12 ' R & I( (ros Charles SF 1905
13 I rat fie Stripping
S 15.988.81
S8,275.00
S5.928.00
SI1.011 SI1,517,00
`645.00',
S20.00.
S5,670 00
S 38.100.00
LS 1 1 .518.120.00 $18.320.00
1 i Reinstall I raf lie Loops
r 15 Demo and install ped. ramps
16
I,i
18
19
Demo and install alley apron
Remove and replace 6" A.C. Dike
Construct G-1 Concrete Curb
Cold Plane Existing A.C. 6'
Wide, 0-1.5" deep
211
I A 28
$140.00 S12,320.00
S2,720.00 $5440.00
SF 1117
S *I-50 $38.536.50
L.F. 1 137
1576
I..F. 93
19.-17
S.F. 1 3164
1)igout and Patch Failed Areas
vtitle-1";A.i)Ilt Concrete
---
Si.btonal
1 SF
351
(
2,159.12
4,600.71
2,974.16
4.06 13,605.06
j 887.1 18.49
5887, 118.4TI,
Page 1
21
Clean, Tack, Install 1.5" Asphalt
Overlay
Sand Seal
2;
24
Stripping
Crack Repair and coating of
tennis courts at [..1 Toyon and Las
Palmas Parks
Total
CONTRACT CHANGE ORDER NO. 3
S.P.
S.P.
I .. S.
1..5.
22000
1.04 22,880.00
22.000
0.07 1,540
940.95
DISCUSSION:
Added line items:
940.95
33,930
S9I2.480.00
Line Item No. 24 has been added to provide compensation to the contractor for crack
repair and coating of six (6) tennis courts at El Toyon Park and 1,as Palmas Park.
CONTRACT ADJUSTMENT:
As a result of this change order the contract price is adjusted as follows:
1. The contract price is increased in the amount of S33,930 from the current
contract price of S912,580 to a new contract price of $946,410.
2. The contract time is increased by thirty (30) working days. The contract
completion date was previously established as Tuesday, November 27, 2007. The
new contract completion date is therefore establish Thursday, January 10, 2008.
This change order shall be considered full compensation for furnishing and installing the
materials, labor, tools and equipment, profit. overhead. and all incidentals for performing
the work described above. Koch -.Armstrong General Engineering, Inc. will not be entitled
to damages or additional payment for delays as described in the 1997 edition of the
Standard Specifications for Public Works Construction, Section 6-6.3, for performing the
work as described above.
RECOMMENDED FOR APPROVAL BY:
Alberto Griego, Assoc
// 2� 7
gineer ll• e
33,930
S946,410
Page 2
CONTRACT CHANGE ORDER NO. 3
APPROVED BY:
Chris Arrrong, President
Koch-Armstronc General Engineerim, Inc.
Monti Koch
Koch -Armstrong General Encineering, Inc.
•
/i—ZFr— 07
Date
\!(-)
Date
arya f Bahaki, City Engineer Date
2 ; 2 ca7
Page 3
/YO' IL :,Fl KUIY� Ah? ltit�f0.,
rAi l;e.!i� 71 U
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
P.O. BOX 1186, LAKESIDE, CA 9754A 6986
TEL: I619)561-2085 FAX: (619)561.8317
QUOTATION
07-926
TO
Thin
CITY OF NATtONAt . CRY
ATM
TEL:
FAX:
EMAR:
DATE:
ASSERT GRIM°
1243 NATIONAL CITY BLVD.
819336.438E
NATIONAL_ CITY. CA. 91950
619-338-4397
11t21I200T
alboiMion eaGIIime 30 deys from the deteabnfo9od is gpad fo[-u arkAta We1ltQ tl D R
yeab' tff data ,
6yg mtk�s ufAarw�o natsd
JOB LOCATION
IDENTIFIED
ELTOYON PARK„ LAS PALMAS PARK
TENNIS COURT RESURFACING
ItCf1
O9CCALPyfON
APPROX.
ANOTT
MY [
Lear NOCE
TOTAL
RESURFACE TENNIS COURTS
j
1
EL TOYON PARK
41.
EA
L
21060.00
2
LAS PALMAS PARK
2
EA
12870.00
—_._..�..
TOTALS
33930J0
1
NOTE' SEE ATTACHED RF41fiFACMG SPCIFJCA'Fd6
INCLUDES: ONE MOVE IN.
CONDITIONS:
t.tbae rat Nwado IM OO. tabs• aN form o(mairadlarlVdaVal AMIN. tMMO" a A.1. ban WW1 , raArp.tt naanea, stop% tniTIG =mg. a Mary Mmonmo urdarSaavanwes weaned.
2 Idoolny Ptaaftda Pe1n»me and FMB Payment upon compWlet Mamela art &Mo red Mar 30 days, and e,ey are s,bja a In tl. raa1..m *waif Mow Morrable W lae•.
i wn.: to b. don. in anneninnoe.i, pVeti Npd.iw...... 0ww16,.,..I..,. . +rca ba noarad In vdnp Mar to my peowaed;ha+grz
4.&taafaa wbe Wharf *U..+.tCas4otu,oa end ata►olo. Oa4re,.faWW/a1Wan tma.NwWaalCameral np,eeWiv. r,r: berjas wok tracts aN,p1.Ee vfaaEaci
Airymaw mmtWrmOfSWOON ariegenmea,*Zit aeDueled Wee. agerenveap(II Veer,_,etc shag b.Mamma came rrraYWOma1
P. Ramrod C.arSnu PreMinary Lief, idanaaem Sabre IGlfa,r,i°�a Y Lion ► 8poli nA 7;6�11shall Powwows Ie uom-mesbw+g @enetrt L-Rgt,aMag. t,c. ,w i bey.
n
7.&4Jad faCR*Appo .,d artioalon ofC�mA
Cfaaa Y iiw e,*I Nau,ane'+t! N SW recy.Y90 Ctosa Yaaf Censyl S7a,1CIfm Spealailm %Ulan a uama Maaile nel.d.
Acceptance:
Moos oleo and warn me oupydis pastaiffne.aatlpgaa dw
sole and frtyagpaana,l My p,ler,gh.•m• .,•9aM•LN•w.
Apt sel k.N herein arc of na kfr. p, a>,Na
Firm: CITY OF NATLONAL CITY
oy:
Data
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
t, Y / ..
'20C?,`iE0 0 •25 AM Ma -ARMS RONG
FAX N. 519 551 C':? F. 0037003
P.O. Box MO. lakeelde, CA 92040
(619) 561-2003 Air 1619j 561-0317
Tennis CourtResurkcing Specifications:
A. Application on Portland Cement Concrete Surfaces.
13. Scope of Work- the scope of work consists of furnishing specified
materials, all labor, equipment, and services necessary for and reasonably
•incidental to the color coating of Portland Cement Concrete tennis courts in
accordance with the following specifications.
C. The approved acrylic surfacing material shall be Laykold Color Coatings
and Laykold White Line Marking Paint as manufactured by Advanced
Polymer Technology.
D. Preparation of Portland Cement Concrete Surfaces.
I. Pressure washcourts to xaove dust, dirt, debris, and foreign matter.
2. Remove lifting/spall.ing concrete caused by incorrectly placed mbar.
Upon completion of concrete removal, cut & remove rcbar from the
spailing area, or coat if repar has sufficient clearance from sae -act.
Upon demo and rcanoval completion, patch and repair concrete slab to
a srnooth condition.
3. Prep/fill remaining cracks and spalls with acrylic court patch crack
repair product.
E. Appli.cation of Laykold Acrylic
1. Prime coat repaired areas.
2. Apply one (1) coat of 60 mesh sanded acrylic resuxfacer using a
flexible rubber squeegee per .manufacturer's specifications.
3. Over the acrylic resurfacer coat apply one (1) coat of 90 mesh sanded
Laykold using a using a flexible rubber squeegee per manufacturer's
specifications.
4. Each coat will be thoroughly scraped and cleaned before the next coat.
5. Apply one (1) finish coat of unsandcd Laykold Acrylic using a
flexible squeegee per manufacturers specifications.
6. White lines shall be located and marked per USTA specifications.
Laykold White Line Markitig Paint shall be used in accordance with
the manufacturer's lecifications.
Ligtitatipns
No materials shall be applied if the surface temperature is below 50 degrees F., in
excess of 140 degrees F., or when rain or high humidity is imminent.
RESOLUTION NO. 2007 — 263
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY
AUTHORIZING THE CITY ENGINEER TO EXECUTE CHANGE ORDER
NUMBER THREE WITH KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
FOR THE NATIONAL CITY RESURFACING PROJECT, FY 2006/07,
IN THE AMOUNT OF $33,930 FOR THE RESURFACING OF THE EXISTING
TENNIS COURTS IN EL TOYON PARK AND LAS PALMAS PARK, AND
AUTHORIZING THE TRANSFER OF $3,930 FROM THE REMODEURENOVATE
PARK AND RECREATION FACILITY PROJECT ACCOUNT TO
THE RESURFACE TENNIS COURTS IN CITY PARKS PROJECT ACCOUNT
WHEREAS, on April 5, 2007, the City Council adopted Resolution No. 2007-62
awarding a contract to Koch -Armstrong General Engineering, Inc. in the amount of $694,152 for
the construction of the National City Street Resurfacing Project; and
WHEREAS, for the benefit of the users of the park tennis court facilities, the
Community Services Department has requested that the tennis courts in El Toyon and Las
Palmas Parks be resurfaced due to the deteriorated condition of the courts; and
WHEREAS, Change Order No. 3 provides for the crack repair and resurfacing of
the tennis courts in El Toyon and Las Palmas Parks. The cost to repair the four tennis courts in
El Toyon Park in $21,060. It will cost $12,870 to repair the two tennis courts in Las Palmas
Park; and
WHEREAS, a transfer of funds in the amount of $3,930 from the
Remodel/Renovate Park and Recreation Facility Project Account to the Resurface Tennis
Courts in City Parks Project Account is necessary to cover the cost of the repairs.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby authorizes the following transfer of funds:
FROM: Account No. 001-409-500-598-4127
Remodel/Renovate Park and Recreation Facility Project
TO: Account No. 001-409-500-598-4017
Resurface Tennis Courts in City Parks Project
TOTAL AMOUNT: Not to exceed $3,930
PURPOSE: Repair and resurfacing of the tennis courts in El Toyon
Park and Las Palmas Park
BE IT FURTHER RESOLVED that the City Council hereby authorizes the City
Engineer to execute Change Order Number Three with Koch -Armstrong General Engineering,
Inc. in the amount of $33,930 for the repair and resurfacing of the four tennis courts in El Toyon
Park and the two tennis courts in Las Palmas Park.
--- Signature Page to Follow ---
Resolution No. 2007 — 263
December 4, 2007
Page 2
PASSED and ADOPTED this 4th day of Decem• -r, 007.
on Morrison, Mayor
ATTEST:
Michael R. Dalla, Ci Clerk
APPROVED AS TO FORM:
George H. Eiser, I11
City Attorney
Passed and adopted by the Council of the City of National City, Califomia, on
December 4, 2007 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Natividad, Ungab, Parra, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
/"Idfi
City Jerk of the City o National City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2007-263 of the City of National City, Califomia, passed and
adopted by the Council of said City on December 4, 2007.
City Clerk of the City of National City, California
By:
Deputy
C.'_ Q(11r1- 11
City of National City, California
COUNCIL AGENDA STATEMENT
MEETING DATE December 4, 2007
AGENDA ITEM NO.
5
ITEM TITLE Resolution of the City Council of National City approving Change Order Number Three to Koch -
Armstrong General Engineering, Inc. for the National City Resurfacing Project, FY 06-07, in the amount of $33,930 for
resurfacing the existing tennis courts at El Toyon and Las Palmas Parks and transfer of Funds ($3,930) from the
"Remodel/Renovate Park & Recreation Facilities" project account to Resurface Tennis Courts in City Parks" project
account, and authorizing the City Engineer to sign the change order and carry out the work as a part of the resurfacing
project (funding will be available through General Funds)
PREPARED BY Alberto Griego
EXPLANATION
Please see attached.
DEPARTMENT
Engineering
EXT. 4386
Environmental Review X N/A
MIS Approvals
Financial Statement Approved By:
�,j� Finance Director
Funding will be provided from General Fund Account No. 001-409-500-598-4017 in the amount of $30,000.
Additional funding will be provided by a transfer of funds in the amount of $3,930 from General Fund
Account No. 001-409-500-598-4127 to Account No. 001-409-500-598-4017.
Account No.
STAFF RECOMMENDATION
Adopt the Re
ION RECOMMENDATION
N/A
L
A-200 (Rev. 7/03)
ATTACHMENTS (Listed Below) Resolution No. o o" 6"
1. Resolution
2. Contract Change Order Number Three
3. Quotation from Koch -Armstrong General Engineering Inc.
Co3
City of National City
Office of the City Clerk
1243 National City Boulevard, National City, CA 91950-4397
Michael R. Della, CMC - City Clerk
(619) 336-4228 Fax: (619) 336-4229
December 20, 2007
Mr. John Armstrong
President
Koch Armstrong General Engineering, Inc.
P.O. Box 1190
Lakeside, CA 92040
Dear Mr. Amistrong,
On December 4, 2007, Resolution No. 2007-263 was passed and adopted by
the City Council of National City, executing change order number three with Koch
Armstrong General Engineering, Inc.
We are enclosing for your records a certified copy of the above Resolution and a
fully executed original change order.
Michael R. Dalla, CMC
City Clerk
Enclosure
cc: Engineering Department