HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #15 Foodland MarketCHANGE ORDER CIO Number 15
To IIealey Construction Co, California CIO Initiation Date: November 6, 2007
Project: Foodland Market
Project Specification No.:06-04
A Change Order is hereby recommended for the following work in the amount identified in this
document:
DESCRIPTION OF CHANCE:
This change provides two vertical channel supports (C6 X 8.2) for the horizontal clock channel
supports. The vertical channel supports are cut and welded between the tower tube frames as
shown on the attached exhibit. The work includes traffic control during installation, lift for one
day, and one additional day of work.
REASON FOR CHANGE:
The center of the clock dimensions were revised by the project Architect. In the field it was
discovered the clock horizontal supports required two vertical supports. The support details and
changes are attached as an exhibit to this change order.
COST RECONCILIATION:
The contractor agrees that this change order in the amount of $3,395.63 includes all costs for
material, labor, supervision, overhead, incidentals, insurance, bonds, and no other compensation
will be permitted. The City has requested a six (6) hour credit for the welding of the horizontal
clock supports that were negotiated and included in change order 9. The credit will be
negotiated after further discussions with the subcontractor and project closeout.
Construction Contract Accountine Summary:
The original Contract Amount (Base Bid)
Net change by previously authorized Change Orders
The Contract Amount prior to this Change Order
With this Change Order request the Contract cost is increased by
New Contract Amount
Change in Contract Time:
Contract Completion Date:
Recommended for Approval by:
Approved by:
Change Order No. 15
$ 290,326.00
$ l 05 lo58.4l5
$315,5249�
$ 3,395.63
$ 403,36o•08
One Added Day
November 20, 07
if -af-
IIEALEY CONSTR,YJCI'ION CO. DATE
CO ELOPMENT COMMISSION DATE
z_ -r/ n8
I'Y O . " AT ONAL ITY DATE
ENG ' ERING DEPARTMENT
/,(0 /Of
CC: Construction File
Inspector
Construction Estimate Page 1
Qty Craft@Hours Unit Material Labor Equipment Total
RFI No. 36
City of National City
Owner Addr: Office of City Clerk,
1243 National City Blvd
National City, CA
91950
Javier Saunders
Tel: (619) 236-1778
Fax: (619) 336-4217
Install steel tubing to support clock brackets.
October 27, 2007
Labor.
October 18. 2007 ( Thursday )
David Healey ( Meet Javier Saunders, Re -Design location for Clock )
1.00 CC@1.000 --
0.00 63.90
October 19. 2007 ( Friday )
David Healey ( Meet Petar Perisic, Re -Design location for Clock )
1.00 CC@1.000 -- 0.00 63.90
0.00 63.90
0.00 63.90
October 23. 2007 ( Tuesday )
David Healey ( Setup Western Steel, Meet Special Inspector, Fencing & Safety Peremeter )
1.00 CC@2.000 -- 0.00 128.00 0.00 128.00
Richard Raynor ( Trafic & Pedestrian Safety )
1.00 CC@2.000 -- 0.00 128.00 0.00 128.00
Virgilio Gutierrez-Murillo (Trafic & Pedestrian Safety )
1.00 CC@6.000 -- 0.00 383.00 0.00 383.00
Sub- Contractors.
Western Steel
October 23. 2007 ( Tuesday )
1.00--@.0000 --
Boom Lift 600S/A.
1.00 CC@.0000
Environmental Fee 1%
1.00-@.0000
Damage Waiver 14%
1.00--@.0000
0.00 0.00
0.00 2,100.00
"7-.9p ,: , 2-tpo
35.00 0.00 950430 - 3857)38
2.Io
0.00 0.00 3.50 '3758
2q-f0
0.00 0.00 49.00 48-86-
Construction Estimate Page 2
Qty Craft@Hours Unit Material Labor Equipment Total
Plus 1 day in lost time due to the Extra Work.
Total Manhours, Material, Labor, and Equipment:
12.0 35.00
Total Only (Subcontract) Costs:
2ntc.So I ioag.3v
766.80 4OLL750 1,204 0
2,100.00
3� 08.30
Subtotal:
1.00% Insurance: 33794' 2IA'
15.00% Profit:dww,o-v,No
15(.2.5
Estimate Total: -3783fi94-
31'sc;5.4,3
;r4i CONSTT;;CTiON CO. ";o.:619
19 October 2007 CALTRANS Certified DBE. WBE
AISC Certified
David Healey
1545 Tidelands Ave.
National City, CA 91950
(619) 474-4900
RE: ADD BRACING FOR CHANNEL SECTIONS
Western Steel submits the following quote for the above referenced-
Fabricate And Install: Bracing pieces for Channel Sections specified in drawing.
Standard. Exclusions:
A. Permits, fees, and engineering or calculations.
B. Traffic control set up.
C. Any testing or inspections.
D. Steel items 10 gauge thickness or Tess.
E. Sleeves through concrete or masonry or pertaining to full penetrations.
F. Non-ferrous materials.
G. Grouting and dry -packing or any concrete work.
H. Wood to wood connections.
I. Field welding of rebar_
J. All Simpson type hardware and field welding of same.
K. All chain link fencing.
L. Grates (unless specifically included),
M. Mechanical equipment and..,pipe supports (unless specifically included).
N. Bolts or fastening devices other than steel to steel.
O. Steel studs.
P. Shoring or demolition.
Q. Posts for signs, flags, or lights.
R. Door jambs and guides.
S. Stair nosings.
T. Core drilling.
?ir`vl -EALEY C(M76.„C-:0'J CO. ` '61;
U. Finish paint and any field painting.
V. Any painting of galvanized surfaces.
W, Locking devices and mechanical operators.
X. Decking or attachments to decking (unless specified in quote).
Y. Roof opening framing or supports not shown on structural steel drawings and
attached to structural steel.
Z. Attaching steel to CMU or concrete.
AA. All field measuring.
BB. Items shown on mechanical, plumbing or electrical drawings.
CC. Standing seam roof system
DD. Any & all existing coating removals
EE. Protection of existing surfaces from welding & grinding operations or providing
firewatch's.
FF Removal & replacement of interferences.
GG. Providing or installing epoxy or adhesive bolts or anchors.
* THIS RID IS VALID FOR FIFTEEN (15) DAYS UPON RECEIPT.
Total $2,135.30
Sincerely,
Hugh E. Winthrop
Contracts Manager
fool? ueri,3 CLc C.
1 v �x
iLIN)
lbe
Sf w+ '< —0 god..
e -aJi0(.' C6d00,2:
C(vx$,Z C1,44) L
ru✓L ‹__Locc c�U►�'i �
--- C!vx8•Z
C(ox ',fL
EKIs1 `r'ot.a&YL IAA 6&
CsS LL,. 1r,)
•
1
.-...� ��Ghx"�,:3�.F.{a��R� fn':L'l..ea�iF'�et:sA�—V.iii�:�fv_i'S_.^'• �.P�,°
TS
V-51/8►
L6
Dd6S 5 La c_7G (z-- c2--7
•
Td WdSS:90 366T LS '6nd
'ON X3-
: wnN-4
City of National City
Office of the City Clerk
1243 National City Boulevard, National City, CA 91950-4397
Michael R. Della, CMC - City Clerk
(619) 336-4228 Fax: (619) 336-4229
February 21, 2008
Mr. David Healey
Healey Construction Co.
1545 Tidelands Avenue
National City, CA 91950
Dear Mr. Healey
On November 61h, 2007 Change Order No. 15 was entered between the City of
National City and Healey Construction Co.
We are enclosing for your records a fully executed original change order.
Sincerely,
Michael R. Dalla, CMC
City Clerk
Enclosure
cc: Engineering Dept.