HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #15 Foodland MarketCHANGE ORDER CIO Number 15 To IIealey Construction Co, California CIO Initiation Date: November 6, 2007 Project: Foodland Market Project Specification No.:06-04 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANCE: This change provides two vertical channel supports (C6 X 8.2) for the horizontal clock channel supports. The vertical channel supports are cut and welded between the tower tube frames as shown on the attached exhibit. The work includes traffic control during installation, lift for one day, and one additional day of work. REASON FOR CHANGE: The center of the clock dimensions were revised by the project Architect. In the field it was discovered the clock horizontal supports required two vertical supports. The support details and changes are attached as an exhibit to this change order. COST RECONCILIATION: The contractor agrees that this change order in the amount of $3,395.63 includes all costs for material, labor, supervision, overhead, incidentals, insurance, bonds, and no other compensation will be permitted. The City has requested a six (6) hour credit for the welding of the horizontal clock supports that were negotiated and included in change order 9. The credit will be negotiated after further discussions with the subcontractor and project closeout. Construction Contract Accountine Summary: The original Contract Amount (Base Bid) Net change by previously authorized Change Orders The Contract Amount prior to this Change Order With this Change Order request the Contract cost is increased by New Contract Amount Change in Contract Time: Contract Completion Date: Recommended for Approval by: Approved by: Change Order No. 15 $ 290,326.00 $ l 05 lo58.4l5 $315,5249� $ 3,395.63 $ 403,36o•08 One Added Day November 20, 07 if -af- IIEALEY CONSTR,YJCI'ION CO. DATE CO ELOPMENT COMMISSION DATE z_ -r/ n8 I'Y O . " AT ONAL ITY DATE ENG ' ERING DEPARTMENT /,(0 /Of CC: Construction File Inspector Construction Estimate Page 1 Qty Craft@Hours Unit Material Labor Equipment Total RFI No. 36 City of National City Owner Addr: Office of City Clerk, 1243 National City Blvd National City, CA 91950 Javier Saunders Tel: (619) 236-1778 Fax: (619) 336-4217 Install steel tubing to support clock brackets. October 27, 2007 Labor. October 18. 2007 ( Thursday ) David Healey ( Meet Javier Saunders, Re -Design location for Clock ) 1.00 CC@1.000 -- 0.00 63.90 October 19. 2007 ( Friday ) David Healey ( Meet Petar Perisic, Re -Design location for Clock ) 1.00 CC@1.000 -- 0.00 63.90 0.00 63.90 0.00 63.90 October 23. 2007 ( Tuesday ) David Healey ( Setup Western Steel, Meet Special Inspector, Fencing & Safety Peremeter ) 1.00 CC@2.000 -- 0.00 128.00 0.00 128.00 Richard Raynor ( Trafic & Pedestrian Safety ) 1.00 CC@2.000 -- 0.00 128.00 0.00 128.00 Virgilio Gutierrez-Murillo (Trafic & Pedestrian Safety ) 1.00 CC@6.000 -- 0.00 383.00 0.00 383.00 Sub- Contractors. Western Steel October 23. 2007 ( Tuesday ) 1.00--@.0000 -- Boom Lift 600S/A. 1.00 CC@.0000 Environmental Fee 1% 1.00-@.0000 Damage Waiver 14% 1.00--@.0000 0.00 0.00 0.00 2,100.00 "7-.9p ,: , 2-tpo 35.00 0.00 950430 - 3857)38 2.Io 0.00 0.00 3.50 '3758 2q-f0 0.00 0.00 49.00 48-86- Construction Estimate Page 2 Qty Craft@Hours Unit Material Labor Equipment Total Plus 1 day in lost time due to the Extra Work. Total Manhours, Material, Labor, and Equipment: 12.0 35.00 Total Only (Subcontract) Costs: 2ntc.So I ioag.3v 766.80 4OLL750 1,204 0 2,100.00 3� 08.30 Subtotal: 1.00% Insurance: 33794' 2IA' 15.00% Profit:dww,o-v,No 15(.2.5 Estimate Total: -3783fi94- 31'sc;5.4,3 ;r4i CONSTT;;CTiON CO. ";o.:619 19 October 2007 CALTRANS Certified DBE. WBE AISC Certified David Healey 1545 Tidelands Ave. National City, CA 91950 (619) 474-4900 RE: ADD BRACING FOR CHANNEL SECTIONS Western Steel submits the following quote for the above referenced- Fabricate And Install: Bracing pieces for Channel Sections specified in drawing. Standard. Exclusions: A. Permits, fees, and engineering or calculations. B. Traffic control set up. C. Any testing or inspections. D. Steel items 10 gauge thickness or Tess. E. Sleeves through concrete or masonry or pertaining to full penetrations. F. Non-ferrous materials. G. Grouting and dry -packing or any concrete work. H. Wood to wood connections. I. Field welding of rebar_ J. All Simpson type hardware and field welding of same. K. All chain link fencing. L. Grates (unless specifically included), M. Mechanical equipment and..,pipe supports (unless specifically included). N. Bolts or fastening devices other than steel to steel. O. Steel studs. P. Shoring or demolition. Q. Posts for signs, flags, or lights. R. Door jambs and guides. S. Stair nosings. T. Core drilling. ?ir`vl -EALEY C(M76.„C-:0'J CO. ` '61; U. Finish paint and any field painting. V. Any painting of galvanized surfaces. W, Locking devices and mechanical operators. X. Decking or attachments to decking (unless specified in quote). Y. Roof opening framing or supports not shown on structural steel drawings and attached to structural steel. Z. Attaching steel to CMU or concrete. AA. All field measuring. BB. Items shown on mechanical, plumbing or electrical drawings. CC. Standing seam roof system DD. Any & all existing coating removals EE. Protection of existing surfaces from welding & grinding operations or providing firewatch's. FF Removal & replacement of interferences. GG. Providing or installing epoxy or adhesive bolts or anchors. * THIS RID IS VALID FOR FIFTEEN (15) DAYS UPON RECEIPT. Total $2,135.30 Sincerely, Hugh E. Winthrop Contracts Manager fool? ueri,3 CLc C. 1 v �x iLIN) lbe Sf w+ '< —0 god.. e -aJi0(.' C6d00,2: C(vx$,Z C1,44) L ru✓L ‹__Locc c�U►�'i � --- C!vx8•Z C(ox ',fL EKIs1 `r'ot.a&YL IAA 6& CsS LL,. 1r,) • 1 .-...� ��Ghx"�,:3�.F.{a��R� fn':L'l..ea�iF'�et:sA�—V.iii�:�fv_i'S_.^'• �.P�,° TS V-51/8► L6 Dd6S 5 La c_7G (z-- c2--7 • Td WdSS:90 366T LS '6nd 'ON X3- : wnN-4 City of National City Office of the City Clerk 1243 National City Boulevard, National City, CA 91950-4397 Michael R. Della, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 February 21, 2008 Mr. David Healey Healey Construction Co. 1545 Tidelands Avenue National City, CA 91950 Dear Mr. Healey On November 61h, 2007 Change Order No. 15 was entered between the City of National City and Healey Construction Co. We are enclosing for your records a fully executed original change order. Sincerely, Michael R. Dalla, CMC City Clerk Enclosure cc: Engineering Dept. ® Recycled Paper