Loading...
HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #16 Foodland MarketCHANGE ORDER C/O Number 16 To Healey Construction Co, California C/O Initiation Date: November 16, 2007 Project: Foodland Market Project Specification No.:06-04 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: This change modifies the tower top construction from 6 inch steel stud construction fastened with screws to 2 inch tube steel welded throughout. REASON FOR CHANGE: 1'he Architectural drawings pictorially show approximately 2 inch size members for the top of the tower. The structural drawings call out six inch members. The contractor proposed a system consisting of two inch welded tube steel throughout in lieu of the six inch screwed steel stud system. The project Architect and team concurred the substitution is preferred over the steel stud system. COST RECONCILIATION: The contractor agrees that this change order in the amount of $2,120 includes all costs for material, labor, supervision, overhead, incidentals, insurance, bonds, materials, and no other compensation will be permitted. Vendor costs are attached. Construction Contract Accounting Summary: The original Contract Amount (Base Bid) Net change by previously authorized Change Orders The Contract Amount prior to this Change Order With this Change Order request the Contract cost is increased by New Contract Amount Change Order No. 16 $ 290,326.00 $113,054•v3 $"4-6717qF76 $ 2,120.00 $ 4oS,Soo. et, Change in Contract Time: No additional Days Contract Completion Date: November 20, 07 Recommended for Approval by: C. T'Y 3o a CT NEGER DATE Approved by: IIEAI.EY CONS UCTION CO. COM DATE LOPMENT COMMISSION DATE. TY 4' NATIONAL CITY DATE /`t%d ENGiDQEERING DEPARTMENT CC: Construction File Inspector Construction Estimate Qty Craft@Hours RFI No. 35 Unit City of National City Owner Addr: Office of City Clerk, 1243 National City Blvd National City, CA 91950 Javier Saunders Tel: (619) 236-1778 Fax: (619) 336-4217 Material Labor Equipment Replace metel stud top of tower with 2" x 2" x 1/8" tubular steeel. October 15, 2007 Page 1 Total Shop Drawins for Metal Shop 1.00 CC@3.000 — 0.00 222.00 Make Changes to top of tower to work arround knife plates 1.00 CC@2.000 -- 0.00 148.00 Manufacture Tubular steel. 1.00—@.0000 0.00 Total Manhours, Material, Labor, and Equipment: 5.0 0.00 Total Only (Subcontract) Costs: 0.00 Subtotal: 370.00 1.00% Insurance: 45.00% Profit:6pxv-1,16v,,t) Estimate Total: 0.00 0.00 0.00 0.00 222.00 - 148.00 2,500.00 4Nsi7o. Da 370.00 2,500.00 2 ©OJ. 00 2,87-A-0O ZD.00 434.84 3,3, 34y-1 L IZO,ero 2`:i; 3:35 M HEA_EY CONSTRUCT:ON CO. Nc. ' 63 Chingon Custom Metal Fabrication, Inc. P.O. Box 19057 - San Diego, CA 92159 Customer IIealey Construction, Co. Dave Healey 1545 Tidelands Avenue National City, CA 91950 INVOICE Date Invoice # 07/20/2007 12507 Project P.O. No. Terms Food Land Prearranged Description Amount Steel structure for Food Land market as discussed. 2" square tubing, 2'W x 5'4"L x 5'II. Materials deposit $1,045.18 2,500.00T Thank you. Subtotal $2,500.00 Sales Tax (7.75%) $193.75 Total $2,693.75 Pymt / Credit $-1,045.1.8 Balance Due $1,648.57 Phone # Fax # E-mail 619-702-4830 619-7024839 info®chingoncmfcom HEALEY CONSTRUCT[O\ CO. N).1631 Chingon Custom Metal Fabrication, Inc. P.O- Box 19057 - San Diego, CA 92159 Customer IIealey Construction, Co. Dave Healey 1545 Tidelands Avenue National City, CA 91950 e v141;$ INVOICE Date Invoice # 07/20/2007 12507 Project P.O. No. Terms Food Land 50% Deposit. Bal. on complet... Description Amount Steel structure for Food Land market as discussed. 2" square tubing, 2'W x 5'4"L x 5`II. 970.00T Subtotal $970.00 Sales Tax (7.75%) $75.18 Total $1,045.18 Pymtl Credit $-1,045.18 Balance Due $0.00 Phone # Fax # E-mail 619-702-4830 619-702-4839 info(ra�chingoncmf.com City of National City Office of the City Clerk 1243 National City Boulevard, National City, CA 91950-4397 Michael R. Dalla, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 February 21, 2008 Mr. David Healey Healey Construction Co. 1545 Tidelands Avenue National City, CA 91950 Dear Mr. Healey On November 16th, 2007 Change Order No. 16 was entered between the City of National City and Healey Construction Co. We are enclosing for your records a fully executed original change order. Sincerely, Michael R. Dalla, CMC City Clerk Enclosure cc: Engineering Dept. ® Recycled Paper