HomeMy WebLinkAbout2007 CON CDC Healey Construction - Change Order #14 Foodland MarketNOTE TO FILE IN THE MATTER OF: Change Order No. 14 with Healey Construction for the Foodland Market Facade Improvements in the amount of $2,380.54. NO FULLY EXECUTED ORIGINAL CHANGE ORDER HAS BEEN PROVIDED TO THE CITY CLERK AS OF FEBRUARY 18, 2009. NTF , a:-., ivy. a.1ar- r U ANGE ORDER To Healey Construction Co, Cahfur?ia Project: Foo .d Market CIO Number 14 C/O Initiation Date' August 2E; 2007 F, � Project Specification No„ 06-f 4 A Charm Order i hcreb ' rccr > ended for the 1`o.gowt otm Identified in this docu t: DESCRIPTION OF .A GE_ This change pry i 1es for tape insulation to be installed been the steel studs and steel cladding. Insulation type will be insx ii d-ehroughout the steel clad ding. In total approximately 1600 1in-,.11 feet will be trstazled. fr&SOIY FOR CIIANGE; On October 25, during the instalatin� ofthe first steel cladding sheets, the project inspector mid contractor recommended the addition of inisulatsen tape- between the steel cladding and steel ads to reduce the noise and vibration between the studs and cladding. COST RECONCILIATION; The work will he compensated through the revised project budget authorized on the September 4, 2007 council agenda The total cost of S2,380.54 for the installation of insulation tape fox the steel cladding includes all material, labor, supervision, ovehmd, insurance, bonds, added time, and incidental,- to provide a complete lete system The contractor has subs fitted a cost attached. The cost is fair and rea.sonable for the services provided. The contractor agrees that this change order includes all gists and no other compensation will be petutitted. 1.a C oUStr tiof COIATFIC c onntilJ2 Sn i The or's_gi33 i Couuact Arno -tint BBase Bid) Net change by previously authorized (Mange Orders The Contraof Amoimtprior to this Change Or, „ With this Change Orde req-ne,st the Contract cost is increased by New Contract Amount Change in Contract Erne: Cori tact cr pt ^n Date: Recommended for A- Ruv r��. - by,. jr i t_A i Y t ROSECr �. ? �ippp:need by' )/ 1� rru-rrrflr rv-N c�:y:sue; r; 1 t itfiN r Order No 14 S 290,3215.00 S rr, a 3a El q 4-4.i z No additional Days DATE W TI 4 TE I� ! 67 ! 7I 7 RV_F.LOPh CO MISSION DAiE CiszOFNATIONAL CITY DATE EGE'v-riv-nJ D1}R MFNT (s':_ f'.rion ucto Pic Tn eztnr nU- 1VLJ L Construction Estimate Qty Crt@liocsr5 Unit Material Labor Equipment _. F oodiand tvlar'Ket City of National City owner Advil-. Office of City Cleric; 1243 National City Blvd National C 'tyx CA .1 9195D ear Change Request No. 37 trnsulaiing Tape October 26, 2007 Page 1 Total LaLor October 25, 2007 ( Thursday ) David Healey 1.00 CC 4.000 Y- 8.00 240.00 0_00 240.0D Richard Raynor 1.00 CC@.5000 - 0.00 30.00 0,00 30.00 it it o Gutierrez -Mori to 1,00 CC@.000 - 0.00 30_00 0.00 30.00 October 26. 2007 (Friday ) David Hea ey 1,00 Cir 0 1.000 David Brothers 1.00 CC@2.500 0.00 60.00 0.00 0.00 150.00 0.00 60.00 150.00 October 20. 2007 ( Monday ) David Healey 1.00 CC@1.000 0.00 60.00 0_00 60_00 Installation Richard Raynor 52.00 CC@5.200 Virgil Gutierrez-Murilio 52.00 CC@5.200 Material, sots; (lndc/Outdoor Mourting.Tape ) October 25. 2007 ( Thursday ) San Dege 1.80--@.0000 a- Chula Vista 1.00-Cv,.0000 0_00 0.00 .33.85 66.51 312.00 -312.00 0.00 312.00 0.00 312.00 0.00 0.00 33.86 0.00 0.00 66.51 ss so Construction Estimate Qty Craft0.1-lotiT5 Unit Material Page 2 Labor Equipment Total October 26. 2007 ( Friday ) Scotch ( Indor/Outdoor Mounting Tape ) El Cajon 1.00 -4,0000 203.00 0_00 0.00 203,00 Lemon Grove 1.00 —0.0000 354.57 0.00 0.00 364_57 October 26. 2007 (Saturday) .sart NATI 1.00 —@.0000 135.39 0_00 0.00 135,39 October 29, 2007 ( Monday ) 1.00 —@.0000 135.3B 0.0-0 0_00 135.38 Total Manhours, Material, Labor, and Equipment: 948.70 1,194.00 0.00 2,142,70 Subtotal: 2,142 70 1_00% insurance: 21.43 10.00% Profit: 216.4; Estimate Total! 27380.54 IL' ) yr OFFICE OF THE CITY CLERK 1243 National City Blvd., National City, CA 91950 619-336-4228 phone • 619-336-4229 fax HEALEY CONSTRUCTION Change Order No. 14 Foodland Market Facade Improvements Engineering Dept. Forwarded Copy of Change Order to Contractor