SUPPLEMENTAL AGREEMENT TWO
Project: City Library Remodel for the San Diego REP- Spec No. 08-01
Subject: Supplemental Agreement Two — Construction Management Services for the
City Library Remodel for the San Diego REP
This is Supplemental Agreement Two to the original agreement dated April 5, 2005 between the
City of National City and Infrastructure Engineering Corporation, the consultant to provide
Construction Management Services for the City Library Remodel for the San Diego REP. This
Supplemental Agreement provided for an original fee of $24,820.00 and now adding an additional
amount of S20,364.64.
The purpose of the services is to assist the City with Construction Management services throughout
the construction duration from March 18, 2008 to August 21, 2008 including pre and post construction
tasks. Details of the scope of work, cost and schedule (Number of hours/days) for this supplemental
agreement are shown on the attached Exhibit "A" Proposal.
Proposed Supplemental Agreement Two: S20,012.64
Approved Original Supplemental Agreement: S24 820.00
Total S44,832.64
c� ded for approval by:
Din Daneshfar, P.
City Project Manager
Approved by:
Rev'
d by:
Date: / ( Date:
Mary:•'�Rahaki, P.E.
City •ngineer
Date:
George Eiser
City Attorney
Tom Frank, P.E.
Infrastructure Project Manager
,S-29-08
Appeoy
Ztfris Zapata
City Manager
Date: i7
® Recycled Paper
Infrnstpjdure Enjirwring C'orporetion
May 13, 2008
Ms. Maryam 13abaki
CatyEngineer
(.7ityof .N tionalCity-
125 E. 17=1. Street
National City, CA 91950
RE.: Revised Pfopo:sal for C: instruction Ivialrageanent Services or the Natiora1 City
13brary Remodel for the San Diego REP, Spec. No. 08-01
Lear Ms. Sab ki
As you are aware, TEC is close to exhausting all of our avg, able funds on rallyprovided in the
Cont.r xx for the Library Remodel project. Some of the reasons we were unable to complete the
project Vithil the proposed budget is due to the nnny unforeseen conditions rrcirkinL It) an
excessive ams)unr of RF1s, redesign and coordinzion efforts to kt'ep the comma as close as possible
to the C ntr tors original schedule. This contract has r n_datorytime constraints and the efforts to
resolve all issues and keel) the magma rebving fc i vArd ague exceeded the. predicted 10 bolt.$ per
week effort that:few originally- plopcsied. This revised prop l is a rest for additional funds with
a cvoil irlg e fuut of 20 how per k through the existing contract conrpietion <lare of Jc;ly25; 2008.
Approved Iivawt us Gam: $ 24,820.00
Requested Increase CCSC.:, 1 $ 20.012_64
New Budget Total $ 44,832.64
This tee is all inclusive of ,Thy 1p, mlleage,.comptaer, and all Oder necessary equipment aid materials
to perform the required tasks.1LC will a intun a to provide our services on a tune and. rrrateria
basis.
We sirrrett'_iyappreciale the upportuni.yto provide this proposal and assist the at- cala this project.
Please contact me at (858) 232-7020 should you lwn-e any q esrions er need further information
Sincerely,
@QAJUV;"i a
Leslie VZ'rega= i P_E.P (J 'n
See oi. Construction Manager
InfrasL uctize Edgier ,acting Corpor.tha
Poe 1 x tylyde° 7571 pa 5 ityFob y
Pharr 33„,
gas -0:1)0
14271 Coriehor. 5reet, ?o +•:;r, Co:;fomirt 92064 T 858.413.2400 F 858.413.2440 ,+vrn.toc•arperaVon.cc-•