Loading...
HomeMy WebLinkAbout2008 CON Infrastructure Engineering - Supplemental Agreement #2 - Former Library RemodelCity of National City Office of the City Engineer 1243 National City Blvd., National City, CA 91950 (619) 336-4380 Fax: (619) 336-4397 May 15, 2008 Infrastructure Engineering Corporation 14271 Danielson Street Poway, CA 92064 Attention: Leslie Wiegand, Project Manager SUPPLEMENTAL AGREEMENT TWO Project: City Library Remodel for the San Diego REP- Spec No. 08-01 Subject: Supplemental Agreement Two — Construction Management Services for the City Library Remodel for the San Diego REP This is Supplemental Agreement Two to the original agreement dated April 5, 2005 between the City of National City and Infrastructure Engineering Corporation, the consultant to provide Construction Management Services for the City Library Remodel for the San Diego REP. This Supplemental Agreement provided for an original fee of $24,820.00 and now adding an additional amount of S20,364.64. The purpose of the services is to assist the City with Construction Management services throughout the construction duration from March 18, 2008 to August 21, 2008 including pre and post construction tasks. Details of the scope of work, cost and schedule (Number of hours/days) for this supplemental agreement are shown on the attached Exhibit "A" Proposal. Proposed Supplemental Agreement Two: S20,012.64 Approved Original Supplemental Agreement: S24 820.00 Total S44,832.64 c� ded for approval by: Din Daneshfar, P. City Project Manager Approved by: Rev' d by: Date: / ( Date: Mary:•'�Rahaki, P.E. City •ngineer Date: George Eiser City Attorney Tom Frank, P.E. Infrastructure Project Manager ,S-29-08 Appeoy Ztfris Zapata City Manager Date: i7 ® Recycled Paper Infrnstpjdure Enjirwring C'orporetion May 13, 2008 Ms. Maryam 13abaki CatyEngineer (.7ityof .N tionalCity- 125 E. 17=1. Street National City, CA 91950 RE.: Revised Pfopo:sal for C: instruction Ivialrageanent Services or the Natiora1 City 13brary Remodel for the San Diego REP, Spec. No. 08-01 Lear Ms. Sab ki As you are aware, TEC is close to exhausting all of our avg, able funds on rallyprovided in the Cont.r xx for the Library Remodel project. Some of the reasons we were unable to complete the project Vithil the proposed budget is due to the nnny unforeseen conditions rrcirkinL It) an excessive ams)unr of RF1s, redesign and coordinzion efforts to kt'ep the comma as close as possible to the C ntr tors original schedule. This contract has r n_datorytime constraints and the efforts to resolve all issues and keel) the magma rebving fc i vArd ague exceeded the. predicted 10 bolt.$ per week effort that:few originally- plopcsied. This revised prop l is a rest for additional funds with a cvoil irlg e fuut of 20 how per k through the existing contract conrpietion <lare of Jc;ly25; 2008. Approved Iivawt us Gam: $ 24,820.00 Requested Increase CCSC.:, 1 $ 20.012_64 New Budget Total $ 44,832.64 This tee is all inclusive of ,Thy 1p, mlleage,.comptaer, and all Oder necessary equipment aid materials to perform the required tasks.1LC will a intun a to provide our services on a tune and. rrrateria basis. We sirrrett'_iyappreciale the upportuni.yto provide this proposal and assist the at- cala this project. Please contact me at (858) 232-7020 should you lwn-e any q esrions er need further information Sincerely, @QAJUV;"i a Leslie VZ'rega= i P_E.P (J 'n See oi. Construction Manager InfrasL uctize Edgier ,acting Corpor.tha Poe 1 x tylyde° 7571 pa 5 ityFob y Pharr 33„, gas -0:1)0 14271 Coriehor. 5reet, ?o +•:;r, Co:;fomirt 92064 T 858.413.2400 F 858.413.2440 ,+vrn.toc•arperaVon.cc-•