HomeMy WebLinkAbout2008 CON Stevens Construction - Change Order #39 Former Library Remodel ProjectCHANGE ORDER FORM C.C.O. Number 39 To (Contractor): Eric Jackson C/O Initiation Date: 9/17/2008 Contractor: M.A. Stevens Const. Project: National City Library Remodel Project, FY 01-08 Project Specification No.: 08-01 A Change Order is hereby recommended for the following work in the amount identified in this document: DESCRIPTION OF CHANGE: Emergency work required at the Kimball I louse: The roof is completely compromised and therefore is imminent danger of severe damage to the structure should it rain. Therefore, the work includes tearing off and re -roofing (other assoc. work). The exterior staircases have dry rot and termite damage and are ready to collapse. Therefore, the work includes tearing down of existing staircases and rebuilding them (other assoc. work) COST RECONCILATION: Costs were reviewed by the City Project Manager and negotiated with the Contractor. Construction Contract Accounting Summary: The original Contract Amount S 1,018,000.00 Net change by previously authorized Change Orders 1 to 38 $ 358,179.49 The contract Amount prior to this Change Orders $ 1 ,376,179.49 With the Change Order No,39 the contract cost is increased by $ 66,347.27 New Contract Amount $ 1,442,526.76 Change in Contract Time: Contract Completion Date: Reviewe PR y: CONTRRCTOR/ M.A. STEVENS DIAL ENGI CITY s INFER Ap : ' By: MAYOR Ron Morrison CC: Construction File Inspector DATE approx. 90 Working Days Jan 8, 2009 7/g9/ot /21-1 DATE {7 DATE DATE �.. Octnher 7, 7nft8__ DATI: M.A. STEVENS CONSTRUCTION, INC. 125 EAST 17TH STREET - NATIONAL CITY, CA 91950 OFFICE (619) 477-7893 - FAX (619) 477-7893 MASTEVENSINC@SBCGLOBAL.NET PCO # Kimball house emergency repairs Date of Request: 9/22/2008 Owner: City of National City Project: National City Library Remodel Contract: Spec. No. 08-01 200 East 12 Street ORIGINAL CONTRACT AMOUNT: $1,018,000.00 DAYS: 90 PREVIOUS APPROVED CHANGE ORDERS: DAYS: 0 THIS CHANGE: DAYS: REVISED CONTRACT AMOUNT: $1,018,000.00 DAYS: 90 SUBCONTRACTED WORK DESCRIPTION COST Painting of all woodwork and carpentry performed by MA Stevens $3,000.00 SUBCONTRACTOR COST $3,000.00 %5 OVERHEAD AND PROFIT $150.00 TOTAL SUBCONTRACTOR COST $3,150.00 M.A. STEVENS CONSTRUCTION, INC WORK DESCRIPTION LABOR (HOURS) MATERIAL (COST) Demo and remove stairways and railings as outlined $2,700.00 in written scope provided by City's engineer to MA Stevens on 9/22 This includes all work neccesary to provide a complete and finished product. Includes: Demo and remove stars Rebuild and replace treads, landings and railings Excludes: Interior work, front entry, unforeseen structural damage Compliance to historical standards or permit fees MATERIAL EXPENSES TOTAL LISTED MATERIAL TAX 7.75% TOTAL MATERIAL COST $3,175.00 LABOR EXPENSES TOTAL LABOR @ $51.50 230 $11,845.00 SUPERVISION @ $62.17 50 $3,730.20 TOTAL LABOR COST 280 $15,575.20 1 JOB EXPENSES TOOLS/ MISC. 4% OF LABOR HOURS PERMIT AND INSPECTION FEES Dumpster and disposal $625.00� EQUIPMENT RENTAL Bobcat Fuel Scissorlift ADMINISTRATION PROCESSING FEE (1 % OF LABOR HOURS) TOTAL JOB EXPENSE $625.00 M.A. STEVENS CONST. INC. SUMMARY TOTAL MATERIAL COST $3,175.00 TOTAL LABOR COST $15,575.20 TOTAL JOB EXPENSE $625.00 SUBTOTAL $19,375.20 15% OVERHEAD AND PROFIT $2,906.28 TOTAL M.A. STEVENS CONST. COST $22,281.48 TOTAL SUBCONTRACTOR COST $3,150.00 TOTAL M.A. STEVENS CONST. COST $22,281.48 SUBTOTAL $25,431.48 BOND FEE 2% $508.63 TOTAL COST OF CHANGE ORDER $25,940.11 M.A. STEVENS CONSTRUCTION INC: PRINT DATE SIGN APPROVED BY AUTHORIZED REPRESENTATIVE: PRINT DATE SIGN PCO# M.A. STEVENS CONSTRUCTION, INC. 125 EAST 17TH STREET - NATIONAL CITY, CA 91950 OFFICE (619) 477-7893 - FAX (619) 477-7893 MASTEVENSINC@SBCGLOBAL.NET 45 Date of Request: 8/27/2008 Owner: City of National City Project: National City Library Remodel Contract: Spec No. 08-01 200 East 12 Street ORIGINAL CONTRACT AMOUNT: $1,018,000.00 DAYS: 90 PREVIOUS APPROVED CHANGE ORDERS: DAYS: 0 THIS CHANGE: DAYS: 0 REVISED CONTRACT AMOUNT: DAYS: 90 SUBCONTRACTED WORK DESCRIPTION COST Tear off and Re -roof of Kimball house .g 5000 6AiVAAC.;f- Replace sheetrnetal and gutter work Fire rated sheeting under roofing (recommended) All work related to roof replacement with the exception of any unforeseen termite or other concealed structural damage $24,281.00 $5,100.00 $1,500.00 SUBCONTRACTOR COST $30,881.00 %5 OVERHEAD AND PROFIT $1,544.05 TOTAL SUBCONTRACTOR COST $32,425.05 M.A. STEVENS CONSTRUCTION, INC WORK DESCRIPTION LABOR (HOURS) MATERIAL (COST) MATERIAL EXPENSES TOTAL I.ISTT-0 MATERIAL TAX 7.75%, TOTAL MATERIAL COST LABOR EXPENSES TOTAL 1 ABOR 0) $51 50 SUPERVISION @ $62 17 TOTAL LABOR COST $0 00 32 :32 $1,989.44 $1,989.44 1 JOB EXPENSES TOOLS/ MISC. 4% OF LABOR HOURS PERMIT AND INSPECTION FEES Dumpster and disposal EQUIPMENT RENTAL Bobcat Fuel Scissorlift ADMINISTRATION PROCESSING FEE (1% OF LABOR HOURS) TOTAL JOB EXPENSE $0 00 M.A. STEVENS CONST. INC. SUMMARY TOTAL MATERIAL COS l TOTAL LABOR COST TOTAL JOB EXPENSE SUBTOTAL $1,989.44 $0 00 $1,989 44 15% OVERHEAD AND PROFIT $298.42 TOTAL M.A. STEVENS CONST. COST $2,287.86 TOTAL SUBCONTRACTOR COST $32,425.05 TOTAL M.A. STEVENS CONST. COST $2,281.86 SUBTOTAL $34,712.91 BOND FEE 2% $694.26 TOTAL COST OF CHANGE ORDER $35,407 16 606146(.. M.A. STEVENS CONSTRUCTION INC: ( - Oc-6 DAT F: APPROVED BY AUTHORIZED REPRESENTATIVE: DAT L SIGN PRINT SIGN 2 Page 1 of 1 Adam Landa From: Eric Jackson [gratefuleric@gmail.com] Sent: Tuesday, September 23, 2008 6:10 PM To: Adam Landa Cc: mastevensinc@sbcglobal.net Subject: Kimball house repairs dated 9-22 scope revised.xls Attachments: Kimball house repairs dated 9-22 scope revised.xls Adam, Here is the revised repair proposal for the stairs and railings, I do not have a quote for the garage roof yet but I'm guessing it's around $5,000. Eric C. Jackson Project manager for M.A. Stevens Inc. Office (619)477-7893 Cell (619)241-5698 "Encounter adapt and overcome" 9/24/2008 EXHIBIT A SCOPE OF WORK AT THE KIMBALL HOUSE -PHASE 11 AT 923 A AVE Front staircase needs the following work: 1. Steps need to be adjusted to 8" rise per IBC 2006 Sect. 1009.3 and 3407.1 (Remove and replace as necessary). Paint stair case to match existing. 'Downspout on the south side needs the following work: 1. Replace downspout that is missing on south side of house. Window and ceiling needs the following work: 1. Repair the balances on two windows on each side of the house. 2. Repair and repaint in kind the ceiling in dinning room Clean up: 1. The property shall be maintained in a clean manner during the construction phase and shall be cleaned up after all work has been completed. New Lift installation work: 1, Install New wheelchair lift per Building Dept., plans, and all associated work as follow: A. Electrical connections from panel to pad B. 15'x48"x 5" conc. walkway, C. Saw cutting conc. Wall, D. Concrete lift pad 127"x 75"x 5", E. Repaint fence and porch as necessary, F. Irrigation work associated with pad and walkway, G. Iron gate needs lock moved to he front side H. Remove portion of porch railing as necessary for lift I. Wheelchair lift Genesis OPAL Model (vertical lift) J. Install 7 new 5 gallons bushes in front of lift l3uild New Bathroom per plans: 1. See Construction drawings and do all associated work as follow: A. Reroute Irrigation lines associated with new Bathroom construction B. Do all Associated plumbing work, C. Install new tile flooring, D. Install new sewer lateral E. Paint the inside of the bathroom white F. Install new sink and fixtures for CA accessibility compliances EMERGENCY WORK AT THE KIMBALL HOUSE AT 923 A AVE The easterly staircase needs the following work: 1. Replace the stairs between the 1s` landing and the 2nd landing. 2. Replace the stairs between ground floor and ls` landing, including ls` landing 3. Replace all of the second landing, includes rebuilding the under stairs enclosure, posts, and deck area. Relocate door to the east side of enclosure. 4. Replace all of the stairs between the 2'd landing and the 3rd landing. 5. Replace the 3" d landing (some posts seem to be OK). Paint stair case. North side staircase needs the following work: 1. Replace the stringers, posts, and all the railings. Paint stair case to match, House and garage roof needs the following work: 1. Reroof building w/solid sheathing and Class B fire rated composition roof in kind as 907 A Ave. house and per Chapters 15 IBC 2006 (price also for 50 year warr.). The crickets at the chimneys and at the skylights need to be replaced. Remove and replace gutters as necessary. Repaint as necessary. 2. Reroof garage w/solid sheathing and Class 13 fire rated composition roof in kind as 907 A Ave. and per Chapters 15 IBC 2006 (price for 50 year warr.). Repaint as necessary. Clean up: 1. The property shall be maintained in a clean manner during the construction phase and shall be cleaned up after all work has been completed. 2. The working days for all of the above shall be 90 days. RESOLUTION NO. 2008 — 209 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 39 IN THE AMOUNT OF $66,347.27 TO THE CONTRACT WITH M.A. STEVENS CONSTRUCTION, INC., FOR THE NATIONAL CITY FORMER LIBRARY REMODEL PROJECT, FOR THE EMERGENCY REPAIR OF THE HISTORIC KIMBALL HOUSE ROOF AND EXTERIOR STAIRCASES WHEREAS, the Historic Kimball House, located at 923 "A" Avenue, is an historic site that now houses a museum, and is of great importance to the community; and WHEREAS, the roof of the Kimball House, which was installed in 1977, is completely compromised, and there is an imminent danger of severe damage to the structure should it rain; and WHEREAS, the exterior staircases of the Kimball House have dry rot and termite damage, which creates a potential for collapse and a threat to public safety; and WHEREAS, on March 4, 2008, the City Council adopted Resolution No. 2008-43 awarding a contract in the total amount of $1,108,000 to M.A. Stevens Construction, Inc., for the National City Former Library Remodel Project; and WHEREAS, M.A. Stevens Construction, Inc., has submitted a proposal for the emergency repair work on the Kimball House in the amount of approximately $40,407.16 for the roof, and $25,940.11 for the staircases; a total of $66,347.27; and WHEREAS, such emergency repair work is authorized without following the competitive bid process pursuant to Section 20168 of the Public Contract Code if the City Council finds that the public interest and necessity demand the immediate expenditure of public moneys to safeguard life, health, or property; and WHEREAS, it is recommended that the emergency repair work on the Historic Kimball House be undertaken by M.A. Stevens Construction, Inc., pursuant to Changer Order No. 39 to the contract for the National City Former Library Remodel Project. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby finds that the public interest and necessity require the immediate expenditure of public funds to make emergency repair work to the roof and exterior staircases of the Kimball House in order to safeguard life, health, or property. BE IT FURTHER RESOLVED that the Mayor is hereby authorized to execute Change Order No. 39 in the amount of $66,347.27 to the contract with M.A. Stevens Inc., for the National City Former Library Remodel Project, for the emergency repair of the Historic Kimball House Roof and Exterior Staircases. --- Signature Page to Follow --- Resolution No. 2008 — 209 October 7, 2008 Page 2 PASSED and ADOPTED this 7th day of October, 2 on Morrison, Mayor APPROVED AS TO FORM: George H. Eiser, III City Attorney Passed and adopted by the Council of the City of National City, California, on October 7, 2008 by the following vote, to -wit: Ayes: Councilmembers Morrison, Natividad, Parra, Ungab, Zarate. Nays: None. Absent: None. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California City lerk of the City f National City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2008-209 of the City of National City, California, passed and adopted by the Council of said City on October 7, 2008. City Clerk of the City of National City, California By: Deputy Approve resolution, City of National City, California COUNCIL AGENDA STATEMENT `"MEETING DATE October 7, 2008 AGENDA ITEM NO. 10 ITEM TITLE A Resolution of the City Council of the City of National City approving Change Order Number 39 to M.A. Stevens Construction, Inc., for the National City Library Remodel Project in the amount of $66,347.27 for the Emergency roof and staircase repair on the Historic Kimball House, and authorizing the Mayor to sign the change order. (Tax Increment Funds) PREPARED BY Adam Landa DEPARTMENT Engineering EXT. 4394 EXPLANATION The Kimball house, located on A Ave. south of 9t St., requires emergency roof and staircase repair. The house is now a museum and is of great importance to the community. The roof is completely compromised and there is an imminent danger of severe damage to the structure should it rain. The roof was installed in 1977. The exterior staircases have dry rot and termite damage. There is a potential of collapse and possibly injuring someone. Doing the emergency repairs at the present time would also be cost and time effective. Emergency repair work is authorized without following the. competitive bid process pursuant to the Public Contract Code if the City Council finds, by 4/5 vote, that the public interest and necessity demand the immediate expenditure of public funds to safeguard life, health, or property, The City's contractor, M. A. Stevens Construction, Inc., has submitted a proposal for the emergency work of approximately $40,407.16 for the composition roof and $25,940.11 for the staircases including painting. We had other proposals and his cost is in line with the others or below them. The estimated cost for the emergency work will be $66,347.27. Environmental Review X N/A MIS Approval Financial Statement Approved By: The funds will be transferred by the CDC from Account No. 511-2501 (Tax Incrementuna slgnated Fund Balance) to account no. 511-409-500-598-3005 Account No. 511-409-500-598-3005 STAFF RECOMMEN s ATION �� / l BOARD / COMMISSION RECOMIIj DATION N/A -------� ATTACHMENTS &Wed Below) 1. Change Order No, 39 Resolution No. A-200 (Rev. 7/03) City of National City Office of the City Clerk 1243 National City Boulevard, National City, CA 91950-4397 Michael R. Dalla, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 October 14, 2008 Mr. Eric Jackson M.A. Stevens Construction, Inc. 125 East 17th Street National City, CA 91950 Dear Mr. Jackson, On October 7th, 2008, Resolution No. 2008-209 was passed and adopted by the City Council of the City of National City, authorizing execution of Change Order No. 39 to a contract with M.A. Stevens Construction, Inc. We are enclosing for your records a certified copy of the above Resolution and a fully executed original change order. Michael R. Dalla, CMC City Clerk Enclosures cc: Engineering Dept. ® Recycled Vapor