HomeMy WebLinkAbout2008 CON Koch Armstrong - Change Order #6 Street Resurfacing Project FY 08-09City of National City
National City Streets Resurfacing Project
Project #08-04
CHANGE ORDER #6
August 11, 2008
Contractor: KOCH-ARMSTRONG
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This Change Order will ADD new line items for the use of 4000psi concrete for various improvements at the
inspector's discretion, (see attachment "A"). The contractor and City agree that these line items do not
necessarily add or subtract from the total amount due and if they due no additional compensate other than the
line item price is due. The new line items provide the inspector with alternative choices in repairing the street
at any given location. The contractor agrees that use of any of the additional line items will result in a reduction
of another line item already in the contract, and that the contractor specifically waives any right to Greenbook
sections, 3-2.2, 3-2.2.1, 3-2.2.2 and 3-2.2.3 for any such occurance.
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and the
Contractor and represents the entire agreement for the work described herein and includes all costs
associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance,
bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby
incorporates the original contract and all its referenced documents' terms and conditions.
Justification for Change in Contract
These changes are made to provide the City with an option to place concrete that will cure faster and allow the
public quicker access over the improvements with less public inconvenience.
Construction Contract Accounting Summary
Original Contract Amount: 5,327,000.00
Net change by previously authorized Change Orders: 35,815.50
Contract amount prior to this Change Order: 5,362,815.50
Amount of this change order:
New contract amount: $ 5,362,815.50
Original contract time (calendar days): 90
Previously approved additional working days: 0
Additional working days for this change order: 0
Total contract time (working days): 90
Agreed to and Accepted by:
Date
CC: Construction File
Koch -Armstrong
Project Manager
Date
City Traffic Engineer Date
Approved by:
Mayor of National City Date
City of National City
National City Streets Resurfacing Project
Project #08-04
CHANGE ORDER (C/O)
Contractor: KOCH-ARMSTRONG
New improvements with 4000psi PCC:
1. Remove and replace G7, 4000psi PCC
2. Remove and replace G-1, 4000psi PCC
3. Remove and replace G-2, 4000psi PCC
4. Remove and replace G-14, 4000psi PCC
5. Remove and replace G-17, 4000psi PCC
6. Remove and replace g-12, 4000psi PCC
CO #6
Attachment "A"
August 11, 2008
$7.75/square foot
$42.90/L.F.
$6.65/square foot
$11.80/square foot
$12.70/square foot
$18.10/square foot
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317 C 6 -c%
LICENSE 194819-A `i'
CHANGE ORDER PROPOSAL #20 K.) ex e_ kr-
REVISE CONCRETE WITH 4000 PSI Crc \ L -VL Z 8,
PAGE 1 OF 2
t ij
TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: B N WADE
1243 NATIONAL CITY BLVD. TEL: (619) 336-4380
NATIONAL CITY , CA. 91950 FAX: (619) 336 4397
EMAIL: byronwadel@mac com
DATE: 9/26/2008
We propose to fumish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated.
•cf .6L
��a I
This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION VARIOUS LOCATIONS
IDENTIFIED NATIONAL CITY STREET RESURFACING: CHANGE ORDER PROPOSAL #20- REVISE PCC WITH 4000psi.
ITEM
DESCRIPTION
APPROX.
QUANTITY
UNIT
UNIT PRICE
ADD'L COST w/ 15%
A
REVISED UNIT PRICES: UTILIZE 4000psi IN PLACE OF PSI CONCRETE SPECIFIED IN SDRSD.
a.1
4000psi CONCRETE WITH TAX
1
CY
110.87
a.2
3250psi CONCRETE WITH TAX
1
CY
103.66
7.22
a.3
2500psi CONCRETE WITH TAX
1
CY
101.12
9.75
U.P.
ADD'L
REV.(.05)U.P.
11
REMOVE & REPLACE G7(REVISED) SIDEWALK UTILIZING 4000 psi CONCRETE
$ 7.60
$ 0.138
7.7384
7.75
12
REMOVE & REPLACE G-1(REVISED) CURB ONLY UTILIZING 4000 psi CONCRETE
$ 42.50
$ 0.362
42.8617
42.90
13
REMOVE & REPLACE G-2(REVISED) CURB & GUTTER UTILIZING 4000 psi CONCRETE
$ 45.00
$ 0.534
45.5340
45.55
14
REMOVE & REPLACE DRIVEWAY PER G14(REVISED) UTILIZING 4000 psi CONCRETE
$ 11.55
$ 0.208
11.7577
11.80
15
REMOVE & REPLACE ALLEY APRON PER G17(REVISED) UTILIZING 4000 psi CONCRETE.
$ 12.50
$ 0.154
12.6537
12.70
16
REMOVE & REPLACE CROSS GUTTER PER G12(REVISED) UTILIZING 4000 psi CONCRETE.
$ 17.90
$ 0.177
18.0766
18.10
TOTAL
SF PER CY ADD'L PER CY
PLUS 15%
PER SF
11
1
CY 81 9.75
$ 11.21
$ 0.138
12
1
CY 31 9.75
$ 1121
$ 0.362
13
1
CY 21 9.75
$ 11.21
$ 0.534
14
1
CY 54 9.75
$ 11.21
$ 0.208
15
1
CY 54 7.22
$ 8.30
$ 0.154
16
1
CY 47 7.22
$ 8.30
$ 0 177
TERMS:
1
INCLUDES: ONE MOVE IN, PREVAILING WAGES,
2
QUANTITY USE FOR BIDDING PURPOSES ONLY
3
UNIT PRICE VALID AT THRU END OF SEPTEMBER, 2008.
CONDITIONS:
1.Does not include permits, bonds, any form of engineering(stakmg, testing, inspection. etc.), base under concrete, redwood headers, striping, traffic control, or utility adjustment unless otherwise specified.
2. Monthly Progress Payments and Full Payment upon completion. Accounts are delirquent after 30 days, and they are subject to the maximum finance charge allowable by law
3. Work to be done in accordance with plans, specifications, and quantities identified above. Koch -Armstrong General Engineering, Inc shall be notified in writing prior to any proposed changes
4.Subgrade to be taken from N- 10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5. Any unusual conditions of subsoil encountered, such as buried slabs. underground piping, trash deposits, etc. shall be deemed cause for additional charges
6. Required California Preliminary Lien information (California Crvil Code Section 3097:3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins
7. Subject to Credit Approval and verification of California Preliminary Lien information.
8 Class 2 material if included is 3\4" recycled Class 2 per Cattrans Standard Specification Section 26 unless otherwise noted.
Acceptance:
Please sign and return one copy -this quotation constitutes the
sole and only agreement. Any prior agreements, negotiatiors.
etc.. not set forth herein are of no force or effect.
Firm: NATIONAL CITY STREET RESURFACING FY 06-07
By:
By:
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
9/26/08
Date FRANK HERRERA
CALIFORNIA
NATIONAL CITY'
133V
iNCOR.P011. AT-ED
OFFICE OF THE CITY CLERK
1243 National City Blvd., National City, CA 91950
619-336-4228 phone • 619-336-4229 fax
KOCH-ARMSTRONG GENERAL ENGINEERING
Change Order #6
Tess in Engineering Forwarded
Copy of the Change Order to the Vendor