HomeMy WebLinkAbout2008 CON Koch Armstrong - Change Order #8 Street Resurfacing Project FY 08-09City of National City
National City Streets Resurfacing Project
Project #08-04
CHANGE ORDER #8
August 14, 2008
Contractor: KOCH-ARMSTRONG
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This Change Order will ADD Construction Supervisor, Jason Stouder, from American Ramp Company, to
supervise the installation of all American Ramp Products received by the City of National City at the Kimball
Park Skate Facility in manner so as to validate the manufacturer's warranty. (Please see attachment for
further explanation.)
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and the
Contractor and represents the entire agreement for the work described herein and includes all costs
associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance,
bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby
incorporates the original contract and all its referenced documents' terms and conditions.
Justification for Change in Contract
This change is at the request and direction of the City to provide a supervisor for the installation of the Skate
Park fixtures and ensure proper workmanship for the validation of the product warranty.
Construction Contract Accounting Summary
Original Contract Amount: 5,327,000.00
Net change by previously authorized Change Orders: 40,430.50
Contract amount prior to this Change Order: 5,367,430.50
Amount of this change order: 10,180.00
New contract amount: $ 5,377,610.50
Original contract time (calendar days): 90
Previously approved additional working days: 0
Additional working days for this change order: 0
Total contract time (working days): 90
Reviewed by:
WvilEngi eer �4/)r
rincipal Civil Da
Agreed to and Accepted by:
Koch -Arm trong
CC: Construction File
Koch -Armstrong
Project Manager
Date Mayor of National City
Date
Date
ATTACHMENT TO CHANGE ORDER #8
EXPLANATION
During the construction phase of the project, the unassembled skate park components
required supervised installation to ensure proper assembly and retain the manufacturer's
warrantee. In an effort to expedite the installation, it was decided by Engineering that
installation coordination be provided by American Ramp Company (the manufacturer of the
skate park components) via Koch -Armstrong General Engineering, Inc, the prime contractor
for phase two of this year's street resurfacing project.
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
LICENSE 194819-A
CHANGE ORDER PROPOSAL #23 SKATEPARK RAMP SUPERVISOR c e 0 1*6
PAGE 1 OF 1
TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: BYRON WADE
'1243 NATIONAL CITY BLVD. TEL: (619) 336-4380
NATIONAL CITY , CA. 91950 FAX: (619) 336 4397
DATE: 9/26/2008
We propose to furnish all labor, material. and equipment necessary to perform the following items of work, sublect to terms and conditions stated.
This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted.
JOB LOCATION KIMBALL PARK SKATE FACILITY, W. 15th STREET -EAST OF NATIONAL CITY BOULEVARD.
IDENTIFIED "NATIONAL CITY STREET RESURFACING PROJECT.", CHANGE ORDER PROPOSAL #23- PROVIDE SKATEPARK RAMP SUPERVISOR.
ITEM
DESCRIPTION
APPROX.
QUANTITY
UNIT
UNIT PRICE
TOTAL
1
PROVIDE A SUPERVISOR FROM, 'AMERICAN RAMP COMPANY' TO SUPERVISE AND ADVISE\
1
LS
ON THE INSTALLATION OF RAMPS.
AMERICAN RAMP CO.
1
LS
8717.20
KOCH-ARMSTRONG'S MARK-UP
15%
PCT
1307.58
BOND COST
0.015
PCT
150.37
SUB -TOTAL
1
LS
10175.15
TOTAL- CHANGE ORDER PROPOSAL #23
10180.00
TERMS:
1
INCLUDES: ONE MOVE IN, PREVAILING WAGES, BOND COST
2
EXCLUDES:ANY WORK/LABOR/ MATERIALS OR ITEM NOT SPECIFICALLY STATED IN QUOTE, SPRAYING STREETS THAT HAVE BEEN CRACKSEALED
AT BEGINNING OF START DATE
CONDITIONS:
1 .Does not include permits. bonds. any form of engineering(staking, testing. inspection, etc ). base under concrete. redwood headers, striping. traffic control. or utility adjustment unless otherwise specified
2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 days. and they are subject to the maximum finance charge allowable by law.
3. Work to be done in accordance with plans. specifications. and quantities identified above. Koch -Armstrong General Engineering. Inc shall be notified in writing prior to any proposed changes.
4 Subgrade to be taken from\ - .10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering. Inc. begins work unless otherwise specified
5 Any unusual conditions of subsoil encountered. such as buried slabs. underground piping. trash deposits, etc. shall be deemed cause for additional charges.
6. Required California Preliminary Lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering. Inc. before work begins.
7 Subject to Credit Approval and venfication of Califomia Preliminary Lien information.
8. Class 2 material if included is 3\4- recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted.
Acceptance:
Please sign and return one copy -this quotation constitutes the
sole and only agreement. Any prior agreements. negotiations,
etc., not set forth herein are of no force or effect.
Firm: NATIONAL CITY STREET RESURFACING FY 06-07
By:
By:
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
9/26/08
Date FRANK HERRERA
American Ramp Company
601 McKinley Avenue
Joplin, MO 64801
USA
Voice:
Fax:
877-726-7778
417-206-6888
Sold 1 o:
National City CA
1243 National City Blvd
National City, CA 91950
Customer ID:
Customer PO
E:nrout_e
CA, National City
Payment Terms
Net 30 Days
Quantity Item Description
1.00PS-Installation Supervised Installation
Remit To:
American Ramp Company
P.O. Box 3221
Joplin, MO 64803
Due Date
9/28/08
Hs"- S tio? S S- q/; d
Invoice
Invoice Number:
10652
Invoice Date:
Aug 29, 2008
Page:
.Sales Rep II)
Unit Price
8,717.20
Subtotal
Sales Tax
Total Invoice Amount
Payment/Credit Applied
Extension
8,717.20
8,717.20
8,717.20
tr
8,717.20
RESOLUTION NO. 2008 — 223
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY AUTHORIZING
THE MAYOR TO EXECUTE CHANGE ORDER NO. 8
TO THE CONTRACT WITH KOCH-ARMSTRONG GENERAL
ENGINEERING, INC., FOR THE NATIONAL CITY STREET
RESURFACING PROJECT, FY 08-09 (PHASE 2), IN THE AMOUNT
OF $10,180 FOR CONSTRUCTION SUPERVISOR SERVICES
FOR THE INSTALLATION OF COMPONENTS FOR
THE KIMBALL PARK SKATE PARK PROJECT
WHEREAS, during the installation of the Kimball Park Skate Park, the unassembled
skate park components required supervised installation to ensure proper assembly, and to retain
the manufacturer's warrantee; and
WHEREAS, in an effort to expedite the installation in time for National City Week, it
was decided by the Engineering Department that the coordination of the installation be provided by
the manufacturer of the skate park components, American Ramp Company, via Koch -Armstrong
General Engineering, Inc., the prime contractor for Phase Two of this year's Street Resurfacing
Project; and
WHEREAS, Change Order No. 8 in the amount of $10,180 provides payment for
construction supervisor services for the installation of the Kimball Park Skate Park components,
bringing the total Street Resurfacing Project contract amount to $5,363,758.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National
City hereby authorizes the Mayor to execute Change Order No. 8 in the amount of $10,180 to the
contract with Koch -Armstrong General Engineering, Inc., for construction supervisor services
performed by American Ramp Company for the installation of components for the Kimball Park
Skate Park Project.
PASSED and ADOPTED this 21 st day of October, 2008.
on Morrison, Mayor
ATTEST:
1c ael (�Tt
Mi R. Da a, y Clerk
APPROVED AS TO FORM:
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on October
21, 2008 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Ungab, Zarate.
Nays: None.
Absent: Councilmembers Natividad, Parra .
Abstain: None.
AUTHENTICATED BY:
RON MORRISON
Mayor of the City of National City, California
4 /,VN
City C erk of the City of ational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2008-223 of the City of National City, California, passed and
adopted by the Council of said City on October 21, 2008.
City Clerk of the City of National City, California
By:
Deputy
City of National City, California
COUNCIL AGENDA STATEMENT
MEETING DATE October 21, 2008
AGENDA ITEM NO.
11
ITEM TITLE A Resolution of the City Council of the City of National City approving Change Order
Number Eight to Koch -Armstrong General Engineering, Inc. for the National City Street Resurfacing Project
FY 08-09 (Phase 2) in the amount of $10,180.00 for construction supervisor services for the installation of
the Kimball Park Skate Park Project and authorizing the Mayor to sign the change order. (Funded through
Parks and Recreation Capital Outlay)
PREPARED BY Kenneth Fernandez DEPARTMENT Engineering EXT. 4388
EXPLANATION
Please see attached page with explanation.
Environmental Review X N/A
MIS Approval
Financial Statement
Approved By:
Finance Director
The total cost of the project is estimated to be $165,000 via resolution # 2008-154. The total amount for change order No. 8 is
$10,180.00 and is within the estimated budget for this project. Funding is available through Parks and Recreation Capital Outlay
Funds Acct No. 115-409-500-598-4128. Account No.
TAFF RECOMMENDATION
Ado t Resolution.
0 RD / COMMISSION RECOMMENDATION
N/A
ATTACHMENTS (Listed Below) Resolution No.
1. Resolution
2. Change Order #8
A-200 (Rev. 7/03)
SPEC 08-04
City of National City
Office of the City Clerk
1243 National City Boulevard, National City, CA 91950-4397
Michael R. Dalla, CMC - City Clerk
(619) 336-4228 Fax: (619) 336-4229
November 3, 2008
Mr. Frank Herrera
Koch -Armstrong General Engineering, Inc.
P.O. Box 1190
Lakeside, CA 92040-0906
Dear Mr. Herrera,
On October 21st, 2008, Resolution No. 2008-223 was passed and adopted by
the City Council of the City of National City, authorizing execution of Change
Order No. 8 to a contract with Koch -Armstrong General Engineering.
We are enclosing for your records a certified copy of the above Resolution and a
fully executed copy of the change order.
Michael R. Dalla, CMC
City Clerk
Enclosures
cc: Engineering Dept.