HomeMy WebLinkAbout2008 CON Stevens Construction - Change Order #3, #16, #17, #18, #24 Former Library Remodel ProjectNOTE TO FILE
03-24-10
IN THE MATTER OF: Resolution of the City Council of the
City of National City ratifying Change Order Nos. 3, 16, 17,
18 and 24 in the amount of $65,644.63 from M. A. Stevens
Construction for the National City Former Library Remodel
Project. Please note the following:
FULLY EXECUTED ORIGINAL CHANGE ORDERS WAS NEVER
FILED WITH THE OFFICE OF THE CITY CLERK
ORIGINATING DEPARTMENT: _ CDC _ Housing & Grants
City Attorney _ Human Resources
_ City Manager MIS
_ Community Svcs. _ Planning
X Engineering _ Police
Finance _ Public Works
Fire
NTF
National .y.Li.brary Remodel
Project No.: 031.NATL.0001
EXHIBIT "A"
DATE: August 5, 2008
PROCESSED CONTRACT CHANGE ORDER LOG
j
C.O.
NO.
DESCRIPTION
DATE
RECEIVED
STATUS
P.C.O.
NO.
COST
IMPACT
I
SCHEDULED
IMPACT
1
Remove Existing Ground Mounted
HVAC/Cage — RFI 44
4/3/08
Approved
$394.68
0 Days
1
Provide Waterproofing at Below Grade
Areas of Building Resulting from Nev;
AC and Retaining Wall Configuration
— RE' Y6
4/3!08
Approved
3
$932.57
0 Days
2
Demo Ceiling Wood Structure- REI 43
4/3/08
Approved
4
84,581.57
0 Days
-
Recommendation to Leave Footing as
Excavated, Export Expansive Spoils,
Import Selective Fill for Backfill — RFI
u9
4/3/08
Deleted
2
(Option 1)
S1,776.20
0 Days
3
Over Excavating and Re -compacting,
Export Expansive Spoils, Import
Selective Fill for Back -fill — RFl 49
4/3/08
Approved by
City Manager
(To be ratified
by CC;
2
(Opt On 2)
$8,1 12.44
0 Days
Epoxy Rebar Dowels into existing
1 SOG — Field Work Order 2 — RFI 447
4/29/08
Approved
h
5
$2,250
0 Days
5
New SOG door for existing bathroom -
Field Work Order 3 — RFI #26
4/29/08
Approved
6
S4.760.00
0 Days
6
Demo Unforeseen Condition in the
Existing Darkroom Area — Field Work
Order 1- RFI # 16
5/7/08
Approved
$2,400.00
0 Days
Ntttibnal City Library Remodel.
Project No.: 031.NATL.0001
PROCESSED CONTRACT CHANGE ORDER LOG
7
Abate and Remove Lead Painted
Fascia above Lobby Area — RFI #16
5/14/08
Approved
17
$3,085.54
0 Days
8
In Room 114, Resheath Wall with
Type B Shear and add Holdowns- ASI
3 Sketches — RFI # 13
5/12/08
Approved
8
$3,295.56
0 Days
9 Demo Existing Bearing Walls and Add
new Wood Beam and Post in Green
Room as shown in ASI 4 Sketches —
RFI #14
5/12/08
Approved
9
$2,878.62
0 Days
10
Remove of all Existing Computer and
Communication Cabling Throughout
Building — RFI #12
5/12/08
Approved
10
$483.01
0 Days
11
In Room 114, Demolish Existing Shear
Wall to Allow for Construction of new
Type B Shear Wall — RFI #.13
5/12/08
Approved
11
$1,284.12 0 Days
12
Time only Request Work Performed
under Change Order 6 — Demolition of
Lobby Area — RFI #16
5/12/08
Approved
12
$0.00 7 Days
-
Demo Work Related to RFI #20
5/12/08
Deleted
13
$1,199.31 0 Days
13
Demolish Existing Tile and Slab in
Existing Bathroom — RFI #26
5/12/08
Approved
14
$4,137.48 0 Days
14
Demolish Existing Gypsum Board
Fires:op at East End of Building —
RFI #15
5/12/08
Approved
15
$1,672.89 0 Days
15
Demolish Cork Board on Ex_sting'vyall
— RFI #34R
5/ 12/0S
Approved
16
$1,672.89 0 Days
16
1
Insulate, patch, repair and paint
drywall for exterior walls — RFI #51
5/23/08
Approved by
City Manager
(To be ratified
by CC)
21
$9,061.92
0 Days
National ty Library Rentodel
Project No.: 031.NATL.0001
•
PROCESSED CONTRACT CHANGE ORDER LOG
17
Build Interior Rake Walls vs. Straight
Wails — RF1 57
6/4/08
Approved by
City Manager
(To be ratified
by CC)
20
$18,040.29
0 Days
18
Credit for Motor Assembly on roll -up
5/20/08
Approved
_ 19
($738.091
0 Days
18
Credit for deleted gas line, water line,
and associated paving
6/6/08
Approved
22
($6,750,59)
0 Days
18
Add 19 2-port Data/Voice
Communication locations
6/6/08
Approved by
City Manager
(To be ratified
by CC)
23
$12,4 73.74
0 Days
-
Hi Steel Extra Costs due to revisions
5/20/08
Deleted
19
Hi Steel extra costs due to revisions
6/12/08
Approved
25
$4,948.02
l7 Days
20
Build up existing grade at Lobby
6/11/08
Approved
24
$1,510.74
2 Days
D
Demo Existing Roof Curb Assembly
6/16/08
Deleted
26
$1,141,74
2 Days
21
Demo Existing Roof Curb Assembly
6/ 18/08
Approved
27
$4,977.26
2 Days
22
.;raming and Demo for New Roof over
8/6/08
Approved
29
8 4,962.51
5 Days
23
Build Drywall Hard Lid Ceilings in
7/30/08
Approved '
30
$1,294,88
1 Day
24
Construct new Wood Raised Flooring
in Rehearsal Rooms
8/6/08
Approved by
City Manager
(To be ratified
by CC)
28R
$1 7 976 24
0 Days
National City Library Remodel
Project No.: 031.NATL.0001
PROCESSED CONTRACT CHANGE ORDER LOG
To:a1
$109,698,29
Total Schedule Impact
36 Working Day,
Note:
t
RESOLUTION NO. 2008 — 210
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY RATIFYING
CHANGE ORDER NOS. 3, 16, 17, 18, AND 24
IN THE AMOUNT OF $65,644.63 FROM M.A. STEVENS
CONSTRUCTION FOR THE NATIONAL CITY
FORMER LIBRARY REMODEL PROJECT
WHEREAS, on March 4, 2008, the City Council adopted Resolution No. 2008-43
awarding a contract in the total amount of $1,108,000 to M.A. Stevens Construction, Inc., for the
National City Former Library Remodel Project; and
WHEREAS, Change Order Nos. 3, 16, 17, 18, and 24 in the amount of
$65,644.63, which were processed within the original contingency budget, for over excavating
and re -compacting of the retaining wall footing, insulation of drywalls for exterior walls, building
the interior rake walls, adding the data/voice communication locations, and providing the
material to the San Diego Repertory to install the new wood raised flooring in the rehearsal
rooms are submitted for ratification; and
WHEREAS, because the design plans for the remodel were based on a surface
evaluation due to no record drawings being available to indicate the existing condition of the old
library building, additional work was discovered during the demolition phase of the project that
was not included in the remodel construction plan; and
WHEREAS, the additional work will also include the installation of a fire sprinkler
system, which is required to meet the Building Code and Fire Code requirements, and additional
modifications to the museum to modify both the existing fluorescent lights to more appealing
and decorative track lights and the entrance door to the glass front door at the former historic
room area.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
National City hereby ratifies Change Order Nos. 3,16, 17, 18, and 24 in the amount of
$65,644.63 from M.A. Stevens Construction.
PASSED and ADOPTED this 7th day of Octob
on Morrison, Mayor
ATTEST:
'j
Michael R. Dalla, Cjhy Clerk
APPROVED AS TO FORM:
George H. Eiser, Ill
City Attorney
Passed and adopted by the Council of the City of National City, California, on October
7, 2008 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Natividad, Parra, Ungab, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
//
City C erk of the City of Pfational City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2008-210 of the City of National City, California, passed and
adopted by the Council of said City on October 7, 2008.
City Clerk of the City of National City, California
By:
Deputy
c a00% • o
City of National City, California
COUNCIL AGENDA STATEMENT
..JEETING DATE October 7, 2008
AGENDA ITEM NO.
11
ITEM TITLE Resolution of the City Council of National City ratifying the Change Order Nos. 3, 16, 17,
18, and 24 in the amount of $65,644.63 with M.A. Stevens Construction for the National City former Library
Remodel Project (Funding will be through Tax Increment Funds.)
PREPARED BY Din Daneshfar DEPARTMENT Engineering EXT. 4387
EXPLANATION
See attached explanation.
Environmental Review X N/A
Financial Statement
MIS Approva
Approved By:
Finance Director
The total estimated amount that needs to be allocated for the expected change orders is $295,000. Funding will be
available through Tax Increment Funds, Account No. 51 1-409-500-598-3734. Account No
STAFF RECOMMENDATION
Adopt the Resolution i, /
BOARD / COMMISS i N RE 0 DATION
N/A
ATTACHMENTS (Listed Below)
Resolution
lL. List of Processed Change Orders (Exhibit "A")
3. List of Anticipated Change Orders (Exhibit "B")
Resolution No. a o o `b a\ 0
A-200 (Rev. 7/03)