CHANGE ORDER #9
September 8, 2008
Contractor: KOCH-ARMSTRONG
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This Change Order will ADD Contruction Crews on a time and material basis to install the Skate Park fixtures
at Kimball Park, (see attachements for details.)
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and the
Contractor and represents the entire agreement for the work described herein and includes all costs
associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance,
bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby
incorporates the original contract and all its referenced documents' terms and conditions.
Justification for Change in Contract
This change is at the request and direction of the City to provide the manpower necessary to install the Skate
Park fixtures at Kimball Park.
Construction Contract Accounting Summary
Original Contract Amount: 5,327,000.00
Net change by previously authorized Change Orders: 50,620.50
Contract amount prior to this Change Order: 5,377,620.50
Amount of this change order: 11,782.43
New contract amount: $ 5,389,402.93
Original contract time (calendar days):
Previously approved additional working days:
Additional working days for this change order:
Total contract time (working days):
90
0
0
90
(see Weekly Statement of Contract Time for completion date)
Reviewed by:
City ' ngineer •ate
Pnnci
Dal Civil Engineer
Agreed to and Accepted by:
Koch-Afmstron
(2l or
ate ate
/p Z7-z
Date
cc: Contractor, Construction File, Project Manager, City Clerk
Recommended for j3provat-by.
,,c
Date
Appr by:
ayor of National Cliy Late
City of National City
National City Streets Resurfacing Project
Project #08-04
Contractor: KOCH-ARMSTRONG
Misc. Tools, Crew Truck and Labor Costs
1. Daily Work Report dated 9/2/08
2. Daily Work Report dated 9/3/08
3. Daily Work Report dated 9/4/08
4. Daily Work Report dated 9/5/08
5. Daily Work Report dated 9/6/08
CHANGE ORDER #9
Attachment "A"
September 15, 2008
1,689.05
1,994.10
2,106.87
3,421.62
2,570.79
11, 782.43
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
P.O. BOX 1190, LAKESIDE, CA 92040-0906
TEL: (619) 561-2005 FAX: (619) 561-0317
LICENSE 194819-A
CHANGE ORDER PROPOSAL #19
KIMBALL PARK SKATEBOARD RAMPS
PAGE 1 OF 1(REVISION 01 9-26-08)
TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: BYRON WADE
1243 NATIONAL CITY BLVD. TEL: (619) 336-4380
NATIONAL CITY , CA. 91950 FAX: (619) 336 4397
DATE: 10/24/2008
We propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated.
This quotation expires 30 days from the date above and issiood for work completed within one year of date above unless otherwise noted.
JOB LOCATION KIMBALL PARK - EAST END OF 15th STREET AT SKATEPARK FACILITY
IDENTIFIED NATIONAL CITY STREET RESURFACING: CHANGE ORDER PROPOSAL #19- KIMBALL PARK SKATEPARK RAMPS
ITEM
DESCRIPTION
APPRO%.
QUANTITY
UNIT
UNIT PRICE
TOTAL
1
INSTALL SKATEPARK RAMPS AND FURNISHINGS PER T&M RATES
PAYMENT TO BE BASED ON PREVAILING WAGE, TIME AND MATERIAL RATES
TOTAL -CHANGE ORDER PROPOSAL
1
LS
11782.43
TERMS:
1
RAMPS TO BE SET IN PLACE BY OTHERS
2
MANUFACTURER/DISTRIBUTOR OF RAMPS TO PROVIDE A TECHNICIAN FULL TIME TO OVERSEE
AND INSTRUCT INSTALLATION OF RAMPS AND FURNISHINGS
3
OTHERS TO PROVIDE ALL RAMPS, FURNISHINGS AND MATERIAL NEEDED TO INSTALL.
3
KOCH-ARMSTRONG EXCLUDES ANY WARRANTY FOR RAMPS OR THE INSTALLATION OF RAMPS.
4
ADD 1 PERCENT TO TOTAL BILLING FOR BOND COST
CONDITIONS'
1.Does not include permits. bonds, any form of engineering(staking. testing, inspection. etc.). base under concrete. redwood headers, striping. traffic control. or utility adjustment unless otherwise specified
2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent alter 30 days. and they are subject to the maximum finance charge allowable by law
3. Work to be done in accordance with plans, specifications, and quantities identified above. Koch -Armstrong General Engineering. Inc. shall be notified in writing prior to any proposed changes.
4 Subgrade to be taken from vi- 10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified.
5 Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits. etc. shall be deemed cause for additional charges
6. Required California Preliminary Lien information (California Civil Code Section 3097:3098) shall be provided to Koch -Armstrong General Engineering. Inc before work begins
7. Subject to Credit Approval and verification of California Preliminary Lien information.
8 Class 2 material if included is 3l4' recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted.
Acceptance:
Please sign and return one copy -this quotation constitutes the
sole and only agreement. Any prior agreements. negotiations.
etc.. not set forth herein are of no force or effect.
Firm: NATIONAL CITY STREET RESURFACING FY 06-07
By:
By:
KOCH-ARMSTRONG GENERAL ENGINEERING, INC.
10/24/08
Date FRANK HERRERA
RESOLUTION NO. 2009 — 10
RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF NATIONAL CITY AUTHORIZING
THE MAYOR TO EXECUTE CHANGE ORDER NO. 9
WITH KOCH-ARMSTRONG GENERAL ENGINEERING, INC.,
IN THE AMOUNT OF $11,782.43 FOR FIELD ASSEMBLY
SERVICES FOR THE KIMBALL PARK SKATE PARK PROJECT,
TO BE FUNDED THROUGH A PARKS AND RECREATION
CAPITAL OUTLAYS FUND ACCOUNT
WHEREAS, in an effort to expedite the installation of the Kimball Park Skate Park in
time for National City Week, it was determined that the coordination of the field assembly services
be provided by the manufacturer of the skate park components, American Ramp Company, via
Koch -Armstrong General Engineering, Inc., the prime contractor for Phase Two of this year's Street
Resurfacing Project; and
WHEREAS, Change Order No. 9 in the amount of $11,782.43 is for field assembly
services performed by Koch -Armstrong during the installation of the Skate Park components; and
WHEREAS, funding will be through Parks and Recreation Capital Outlay Funds
Account No. 115-409-500-598-4128.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of National
City that the Mayor is hereby authorized to execute Change Order No. 9 in the amount of
$11,782.43 with Koch -Armstrong General Engineering, Inc., for field assembly services performed
during the installation of components for the Kimball Park Skate Park Project.
BE IT FURTHER RESOLVED that funding through Parks and Recreation Capital
Outlay Funds Account No. 115-409-500-598-4128 is hereby approved.
PASSED and ADOPTED this 20th day of Januar9
on Morrison, ' ayor
ATTEST:
Michael R. Dalla, ity Clerk
APPROVED AS TO FORM:
George H. Eiser, III
City Attorney
Passed and adopted by the Council of the City of National City, California, on January
20, 2009 by the following vote, to -wit:
Ayes: Councilmembers Morrison, Parra, Sotelo-Solis, Zarate.
Nays: None.
Absent: None.
Abstain: None.
AUTHENTICATED BY: RON MORRISON
Mayor of the City of National City, California
giLl4'.of the of
C rk Nra
City City tional City, California
By:
Deputy
I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of
RESOLUTION NO. 2009-10 of the City of National City, California, passed and adopted
by the Council of said City on January 20, 2009.
City Clerk of the City of National City, California
By:
Deputy
City of National City, California
COUNCIL AGENDA STATEMENT
i.rNIEETING DATE January 20, 2009
AGENDA ITEM NO.
5
ITEM TITLE A Resolution of the City Council of the City of National City approving Change Order
Number Nine to Koch -Armstrong General Engineering, Inc. in conjunction with the National City Street
Resurfacing Project FY 08-09 (Phase 2) in the amount of $11,782.43 for field assembly services (labor) for
the installation of the Kimball Park Skate Park Project and authorizing the Mayor to sign the change order.
(Funded through Parks and Recreation Capital Outlay Funds)
PREPARED BY Kenneth Fernandez DEPARTMENT Engineering EXT. 4388
EXPLANATION
Please see attached page with explanation.
Environmental Review X N/A
MIS Approval
Financial Statement
Approved By:
Finance Director
The total amount for change order No. 9 is $11,782.43. Additional allocation of funds of $11,782.43 is requested for this change
order. Funding is available through Parks and Recreation Capital Outlay Funds Acct No. 115-409-500-598-4128.
Account No.
STAFF RECOMM DATION
Adopt the Resoluti n.
BOARD / COMMIS ION RECO ME D IO
N/A
IATTACHMENTS (Listed Below) Resolution No.
1. Resolution
2. Change Order #9
A-200 (Rev. 7/03)
SPEC 08-04 and 08-17
City of National City
Office of the City Clerk
1243 National City Boulevard, National City, CA 91950-4397
Michael R. Dalla, CMC - City Clerk
(619) 336-4228 Fax: (619) 336-4229
January 26, 2009
Mr. Monty Koch
President
Koch -Armstrong General Engineering, Inc.
P.O. Box 1190
Lakeside, CA 92040
Dear Mr. Koch,
On January 20th, 2009, Resolution No. 2009-10 was passed and adopted by the
City Council of the City of National City, authorizing execution of Change Order
No. Nine with Koch -Armstrong General Engineering, Inc.
We are enclosing for your records a certified copy of the above Resolution and a
fully executed original change order.
Sincerely,
Michael R. Dalla, CMC