HomeMy WebLinkAbout2009 CON Cox Communications - Underground District No. 25to/
5159 Federal Boulevard
San Diego, CA 92105-5486
AGREEMENT
BY AND BETWEEN
THE CITY OF NATIONAL CITY
AND
COX COMMUNICATIONS
THIS AGREEMENT is entered into this 3`d day of February , 2009, by and
between the CITY OF NATIONAL CITY, a municipal corporation (the "CITY"), and COX
COMMUNICATIONS, (Cox).
RECITALS
WHEREAS, Cox desires to install facilities in the Municipal Trench in
Underground District No. 25 (Bay Marina Drive Project), and
WHEREAS, the CITY has determined that Cox is qualified to install such
facilities,
NOW, THEREFORE, THE PARTIES HERETO DO MUTUALLY AGREE AS
FOLLOWS:
1. The City agrees to provide an open trench for installation of utilties inside the
area of the Bay Marina Widening 20B conversion, District No. 25 as shown in Drawing
Number 10083-D of the Bay Marina Drive Widening Project (Exhibit A).
2. Cox agrees to provide and install conduits and sub -structure materials for the
route as shown in Exhibit A, in the Bay Marina Widening 20B Project Municipal Trench.
3. Cox's vaults and the pedestal along the trench route will be supplied installed
by Cox.
4. The City agrees to notify Brendan Fennelly, Residenntal Planner, Cox
Communications, at 619-266-5589 within 48 hours of availibity of trench for installation.
5. There shall be no compensation to COX in connection with utility installation.
6. Work to begin within 48 hours of notification from the CITY. Cox shall maintain the
same pace of installation as other installers while trench is open. Cox agrees to pay the City
$500 per day for delays.
7. Cox will complete above ground work within one (1) week of trench completion.
8. Cox agrees to indemnify, defend, and hold harmless, the City of National City and its
officers and employees against and from any and all liability, loss, damage to property, injuries
Mixed Sources
r ,.r r,.i• . _. I
to, or death of any person or persons, and all claims, demands, suits, actions, proceedings,
reasonable attomey's fees, and defense costs, of any kind or nature, including worker's
compensation claims of or by anyone whomsoever, resulting from or arising out of Cox's
negligent performance under this agreement.
IN WITNESS WHEREOF, the parties hereto have executed this Agreement on
the date and year first above written.
CITY OF NATIONAL CITY
By:
APPROVED AS TO FORM:
George H. Eiser, III
City Attomey
COX COMMUNICATIONS
(Corporation — signatures of two corporate officers)
(Partnership — one signature)
(Sole prophet° hip- one signature)
By: I
1,724t—
(Name)
(Print) r
/'Jwr1 ?to -Anil
(Titl
By: 61%-,.4,, 21/vn ,,,.e-.
(Name)
OA/v4-7 //.9/Z/?i..r
(Print)
.vi J./ 6 /2 , N4 `T w ` s Pcn T', Dt:si6 A/
(Title)
2
SURVEYOR:
BENCHMARK:
NO. 366, PAGE 32
HORIZONTAL CONTROL:
CONSTRUCTION RECORDS
DATE STARTED:
INSPECTOR:
COMPLETED:
UJ
1-
0
ENGINEERING DEPARTMENT
,LEGEND
TRENCHING
ze li z,, r j
r
--- + q i f �,;: f
•
•
9-5'
NOTE: CONTRACTOR SHALL REFER TO THE UTILITY
PROVIDER DRAWINGS IN THE APPENDICES OF THE
BAY MARINA DRIVE WIDENING SPECIFICATIONS FOR
THE UNDERGROUNDING AND INSTALLATION OF DRY
UTILITIES.
5620 FRIARS ROAD
SAN DIEGO, CA 92110
619291.0707
(FAX)619291,4165
J-12861N
rid", pncer,g ccnl
r
+
S
/ F 1 + ?
�33163316H�
V.—
/1.
3312 HANDHOLE
DOUBLE BODY \\
3312 HANDHOLEa
DOUBLE BOOY
40 2C
e�4
N
40 FO 120
METRIC SCALE 1:480
ENGLISH SCALE 1". 40'
I
l
'lA
CT+R PROP 3DG&E i)
3312 HANDHOLE
DOUBLE BODY
L
PLAN FOR THE IMPROVEMENT AND GRADING O<,
DRY UTILITY UNDERGROUNDING/
TRENCHING PLAN
CI F N T10NAL CITY
08-13
SPEC. P.
10083-D
NATI,fry
-- I?JCARPORAFTED -�
OFFICE OF THE CITY CLERK
Cox Communications
Utilities Installation — Underground District No. 25
Judy Hernandez (Engineering) Forwarded
Copy of Agreement to Contractor
1243 National City Blvd., National City, CA 91950
619-336-4228 phone • 619-336-4229 fax