HomeMy WebLinkAbout2009 CON Stevens Construction - Change Order #40 Former Library Remodel ProjectCity of National City Library Remodel Project Specification # 08-01 CHANGE ORDER #40 March 5, 2009 Contractor: A Change Order is hereby recommended for the following work in the amount identified below: Description of Change to the Contract: This Contract Change Order will provide funds for the installation of a sprinkler system and smoke detector in the building basement and an extension of underground services from the main water service as requested by National City Fire and executive staff and directed by the project engineer. Cost Reconciliation: This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change: These changes are made to this contract because the the information was not indicated/included on the construction plans and this addition is a requirement by the Fire Department to maintain protection and area separation per the governing NFPA Codes. Contract Accounting Summary: Original Contract Amount: 1,108,000.00 Net change by previously authorized Change Orders: 359,195.16 Contract amount prior to this Change Order: $ 1,467,195,16 Amount of this change order: 16,981.33 New contract amount: $ 1,484,176.49 Original contract time (working days): 40 Previously approved additional working days: 38 Additional working days for this change order: 0 Total contract time (working days): 78 (see Weekly Statement of Contract Time for completion date) Reviewed by: .City Engineer ate 1101 teed to and ccepted by: L+ !C o Contractor Date cc'. Contractor, (,6nstruction File, Project Manager. City Clerk Recomended for .:.rov:l by: Manager ved by: Date Agri 1 21, 2009 Mayor of National City Date Ron Morrison RESOLUTION NO. 2009 — 80 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY AUTHORIZING THE MAYOR TO EXECUTE CHANGE ORDER NO. 40 WITH M.A. STEVENS CONSTRUCTION, INC., IN THE AMOUNT OF $16,981.33 FOR THE NATIONAL CITY FORMER LIBRARY REMODEL PROJECT WHEREAS, on March 4, 2008, the City Council adopted Resolution No. 2008-43 awarding a contract in the total amount of $1,108,000 to M.A. Stevens Construction, Inc., for the National City Former Library Remodel Project; and WHEREAS, during construction, Change Orders No. 1 through 24 were approved within the original budget totaling $109,698.29, increasing the total contract amount to $1,127,698.29; and WHEREAS, on October 7, 2008, the City Council adopted Resolution No. 2008- 217, approving Change Orders No. 25 through 38 in the amount of $248,481.20; and WHEREAS, on April 6, 2009, Change Order No. 39A was approved in the amount of $1,015.67; and WHEREAS, Change Order No. 40 is submitted for the installation of a fire sprinkler system in the building basement, a smoke detector with a tie into the main alarm panel, and an underground extension and backflow to the water main, which was required by the Fire Department, bring the total cost of the contract to $1,484,176.49. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of National City hereby authorizes the Mayor to execute Change Order No. 40 to the contract with M.A. Stevens Inc., in the amount of $16,981.33 for the National City Former Library Remodel Project. PASSED and ADOPTED this 21 st day of April, 20 Ron Morrison, Mayor ATTEST: Michael R. Dalla, Clty Clerk APPROVED AS TO FORM: cTh George H. Eiser, Ill City Attorney Passed and adopted by the Council of the City of National City, California, on April 21, 2009 by the following vote, to -wit: Ayes: Councilmembers Morrison, Parra, Sotelo-Solis, Zarate. Nays: None. Absent: None. Abstain: Councilmember Van Deventer. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California >+ City Clerk of the City I City, California ationa of By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2009-80 of the City of National City, California, passed and adopted by the Council of said City on April 21, 2009. City Clerk of the City of National City, California By: Deputy City of National City, California COUNCIL AGENDA STATEMENT ``MEETING DATE April 21, 2009 AGENDA ITEM NO. 8 ITEM TITLE Resolution of the City Council of National City approving the Change Order No. 40 in the amount of $16,981.33 with M.A. Stevens Construction for the National City former Library Remodel Project and authorizing the Mayor to execute the change order (Funded through Tax Increment Funds.) PREPARED BY Din Daneshfar EXPLANATION See attached explanation. DEPARTMENT Engineering EXT. 4387 Environmental Review X N/A MIS Approval Financial Statement Approved By: `n'nce Director Funding will be available through Tax Increment Funds, Account No. 511-409-500- 98-3 3744 Account No Adopt the Resolutio BOARD / COMMI ' RECOMMED�TIO N/A ATTACHMENTS (Listed Below) 1. Resolution 2. Change Order No. 40 Resolution No. A-200 (Rev 7/03) City of National City Office of the City Clerk 1243 National City Boulevard, National City, CA 91950-4397 Michael R. Della, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 April 29, 2009 Mr. Eric Jackson M.A. Stevens Construction, Inc. 125 East 17th Street National City, CA 91950 Dear Mr. Jackson, On April 21 st, 2009, Resolution No. 2009-80 was passed and adopted by the City Council of the City of National City, authorizing execution of Change Order No. 40 to a contract with M.A. Stevens Construction, Inc. We are enclosing for your records a certified copy of the above Resolution and a fully executed copy of the change order. Sincerely, g et/ Michael R. Dalla, CMC City Clerk Enclosures cc: Engineering Dept. ® Recycled Paper