HomeMy WebLinkAboutWhillock Contracting Inc. Change Order #1 Demolition 2300 Cleveland / 830 23rd Street - 2009City of National City
National City Demo Project
Specification #08-02
CHANGE ORDER #1
April 2, 2009
Contractor: Willock Contracting Inc
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This Change Order will reimburse the contractor for permit fees.
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and
the Contractor and represents the entire agreement for the work described herein and includes all costs
associated with the work including but not limited to manpower, equipment, labor, fees, taxes,
insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order
hereby incorporates the original contract and all its referenced documents' terms and conditions.
Justification for Change in Contract
This change will reimburse the contractor for permit fees that were in excess of the fee amount as
stated in the contract documents.
Construction Contract Accounting Summary
Original Contract Amount: 137,770.50
Net change by previously authorized Change Orders:
Contract amount prior to this Change Order: 137,770.50
Amount of this change order: 230.12
New contract amount: $ 138,000.62
Original contract time (calendar days): 90
Previously approved additional working days 0
Additional working days for this change order 0
Total contract time (working days): 90
City Engineer
Agreed to and Accepted by:
Block Contracting Inc
Date
cc: Contractor, Construction File, Project Manager, City Clerk
Recommended for approval by..
/I
A.
Project Manager
Date
Justification for Change Order No. 1
This change order is to provide funds to reimburse the contractor for permit
fees that were in excess of the fee amount as stated in the contract
documents.
WHILLOCK CONTRACTING, INC.
LICENSE NO 572217
P.O. BOX 2322
LA MESA, CA 91943-2322
(619)579-0700
EXCAVATING • GRADING • DEMOLITION
REQUEST FOR
CHANGE ORDER No. 1155-2
AUTHORIZATION FOR CHANGES IN PLANS OR SPECIFICATIONS
JOB Demolition Cleveland / City of National City DATE 3/31/09
ADDRESS 2300 Cleveland Ave. and 830 23'd Street
You are hereby authorized to make the following changes from Plans and,or Specifications or Contract:
Gordon ; City of National City
The undersigned promises) to pay to the order of Whillock Contracting, Inc. the total amount of S 230.12 within 30 days from
the date hereof Should the undersigned fail to pay said total amount within said period of time it is understood and agreed that the
amount due shall bear interest at the rate of 10% per year from due date. Should an attorney he retained to enforce my (our) promise,
the undersigned agrees) to pay all costs of collection including a reasonable attorneys fee. The undersigned further agree(s) that
neither defects, omissions, incompletions nor any other defaults with respect to the perfbnnance of work not explicitly specified
herein shall excuse, or extend the time for, the payment due hereunder. Should this job order be signed by more than one person
and -or fine and.'or corporation. all the obligations herein contained shall be considered the joint and several obligations of each signer
hereof.
DESCRIPTION OF CHANGE OR MODIFICATION
CREDIT CHARGE
Building Permit
APCD Permit
Hydrant Use Permit
Total
Bid Estimated Fee
Amount over Estimate
$ 601.84
$ 338.28
$ 100.00
$ 1,040.12
$ 810.00
$ 230.12
THE CHANGES OR MODIFICATIONS ABOVE ARE APPROVED AS TO TYPE AND PRICE.
WITNESS
OWNER
Item 1 of
1
NATIONAL CITY
PERMIT RECEIPT
OPERATOR: hcantero
COPY # : 1
FEE ID
3INSPECT
30SMIP-R
3REEN
COMPANY
ADDRESS
Sec: Twp: Rng: Sub: Blk: Lot:
PARCEL ID • 5591170500
DATE ISSUED • 02/24/2009
RECEIPT # • 33267
REFERENCE ID # ...: 09020037
SITE ADDRESS • 2300 CLEVELAND AV
SUBDIVISION
CITY • NATIONAL CITY
IMPACT AREA
OWNER
ADDRESS
CITY/STATE/ZIP
CITY OF NATIONAL CITY
PUBLIC AGENCY
...: NATIONAL CITY, CA 91950
RECEIVED FROM
CONTRACTOR • WHILLOCK CONTRACTING INC LIC # C001439
• WHILLOCK CONTRACTING INC
• P 0 BOX 2322
.: LA MESA, CA 91943
• (619) 579-0700
CITY/STATE/ZIP
TELEPHONE
UNIT QUANTITY AMOUNT PD-TO-DT THIS REC NEW BAL
-------------------------------------------------------------
FLAT RATE 1.00 592.00 0.00 592.00 0.00
VALUATION 68,416.00 6.84 0.00 6.84 0.00
UNITS 3.00 3.00 0.00 3.00 0.00
COTAL PERMIT :
4ETHOD OF PAYMENT
:HECK
TOTAL RECEIPT :
AMOUNT
601.84
NUMBER
0.00 601.84
601.84 09020037
601.84
0.00
CITY OF NATIONAL CITY
Finance Department
619 336-4330
National City 37 / 16798
02/24/2009 10:42:32.000 Reg WXP-CASH02
Validation Receipt
CHARGES-
001-06028-3120
BLDG 09020037 $
001-1161
BSMIP TRUST & AGENCY-SMI$
001-00000-3650
ZCLEAR 001-1118 $
731-1141
731114 whillock contracti$
731-06028-3552
731000 CAD/Admin Fee $
592.00
6.84
3.00
5986.40
118.00
Sub -total $*******6706.24
PAYMENT -
Check - 8895 $ 6706.24
whillock contracting inc
Change $**********0.00
THANK YOU!
Business Hours:
7:00 - 6:00 Monday Through Thursday
Closed on Fridays
C,D1040 ,,o2�
o R.K� a -;:.E►
L - INCORPORATED
Development Services
Waste Diversion Form (WDF)
The State of California requires that each local jurisdiction in the State reduce the
amount of solid waste disposed in landfills by fifty percent (50%). Recycling or
reusing construction and demolition debris is essential in reducing waste sent to
the landfill. City Ordinance No. 2008-2309 requires waste diversion as a
condition of your building permit.
Covered Projects
• Construction of one new single-family residential structure with 2,000
square feet or more.
• Construction of more than one new single-family residential structure
regardless of square footage.
• Construction of all new multi -family residential structures, including
condominium conversions, regardless of the square footage.
• The construction of a new commercial building regardless of the square
footage.
• Tenant improvements that involve at least 2,500 square feet or more.
• All roofing projects involving concrete tiles, in which the roofing project is
at least 1,000 square feet and includes tear -off or removal of existing
roofing material.
• Any demolition project that involves a residential or commercial structures
regardless of the square footage including partial and entire demolitions.
• The construction of an accessory structure to an existing commercial
structure that involves at least 5,000 square feet or more.
• The construction of an addition to an existing commercial structure that
involves at least 1,500 square feet or more
Section
Project or Owner's Name: C t'-Y 0/ Nn hfOlq' t 1 f'' Phone#_.___._
Site Address: a7 CteVPIhd c30 ve a r�
Project Description: 571'1441 ufcs
Project Square footage: 171e4,0
Type of construction:
❑ New construction It Renovation, remodel or demolition ❑ Roofing only
1 of 5 Rev 9-1 1-08
. CD
Section III Roofing Only Project
Complete this section only if this is a roofing only project
x
Project square feet
Conversion factor
Total pounds
/ 2000 =
Tons
Type of Roofing ` zr
Conversion factor
Wood
3 Ibs
Asphalt Shingle
3 Ibs
Clay/Concrete Tile
10 Ibs
Tar & Gravel
7 Ibs
Section IV Required deposit
❑ w construction $ .20 X sq. ft. = $
od Remodel, Renovation, or Demolition $ .35 X I7104 sq. ft. _ $ ciyaikd
❑ Roofing only project $ .10 X: sq. ft. = $
Deposit $ 1414140 (if paid by Cash, Certified Check, Money Order)
Account # 731-1141
Administration fee: $ 118.00 (non-refundable) Account # 731-06028-3552
Total Paid $ Cl aA r 4o
Form of Deposit::
❑ Cash, Certified Check, Money Order
-or-
❑ Certificate of deposit
❑ Surety Bond
❑ Letter of Credit
❑ Performance Bonds
Sent to City Attorney on:
City Attorney approval date:
3 of 5 Rev 9-11-08
CD
Do not write below this line. For Official Use only
Section Vil Summary of Actual Waste Diverted
Complete this section after final inspection.
Diverted:
Recycle use:
tons Proof Submitted: No ❑ Yes ❑ attach to form
(photos suggested). Attach proof to form
Final inspection date: Refund request date:
Within 30 days of final
Diversion requirement met? ❑ YES ❑ NO ❑ PARTIAL Percentage:
E FACE OF THIS DOCUMENT H • S A COLORED BACKGROUND ON WHITE PAPER -
CALIFORNIA
AIC OFFICE TRUST
WHILLOCK CONTRACTING, INC.
LICENSE NO. 572217
P.O. BOX 2322
LA MESA, CALIFORNIA 91943-2322
(619) 579-0700
PAY TO THE City of National City
ORDER OF T l _` a St Z4-4I10
City of National City
MEMO V
90-3210/1222
18895
2/24/2009
$ 00b . Zit
LARS
' SECURITY FEATURES INCLUDED. DETAILS ON BACK. 8
11601889511■ I. 1 2 2 2 3 2 1091: 20 20 119 311
neIuric] / Release Requested by:
Date:
Director Approval:
Date:
Finance Department Validation
5 of 5 Rev 9-1 1-08
c ;y
2.300 Cleoe.L.o(fi
S3° 2 FjSf
AIR POLLUTION CONTROL
18124 OLD GROVE ROAD
SAN DIEGO, CA 92131
TID: ED1841862
83'19'99 1S:34:58
1841862806
BATCH: 436
AMEX
SALE
33400
xxxxxxxxxxx1829
APPR CODE: 156137
INVa: 000007
AMOUNT: $ 338.28
TOTAL: $ 338.28
CUSTOMER COPY
•
CITY OF NA1LJNAL CITY
FIRE DEPARTMENT
1200 National City Blvd.
National City, CA 91950-4303
Phone (619) 336-4550 Fax (619) 336-4454
PERMIT TO USE HYDRANT
CFC CODE: Appendix Chapter 1 Section 105
FEE CODE: 12-17
THIS PERMIT IS NOT VALID UNTIL ALL FEES
ARE PAID AND HAVE BEEN COLLECTED BY
THE FIRE DEPARTMENT OFFICIAL.
OWNER INFORMATION:
RECEIVED AT NCFD BY:
Judy Wilkins
AMOUNT:
$100.00
CHECK NUMBER:
18914
ACCOUNT NUMBER:
001-12000-3553
DATE PAID:
03/03/09
Name:
Street:
City, State, Zip:
(Area Code) Phone/Fax/Cell:
Job Name:
Street demolition
Job Street:
Job City, State, Zip:
National City, CA
Owner Signature:
CONTRACTOR INFORMATION:
Name:
Whitlock Contracting, Inc.
Street:
PO Box 2322
City, State, Zip:
La Mesa, CA 91943-2322
(Area Code) Phone/Fax/Cell:
Ph: (619) 579-0700
Contractor's License No.:
572217
National City Business License No.:
60191
Finance Dept Approval By/Date:
Contractor/Agent Signature:
.2,A P7( yr A42L
Hydrant Location:
Corner of Cleveland Avenue and Bay Marina Drive
Dates of Hydrant Usage:
From
03/09/09
to
06/30/09
Times of Hydrant Usage:
From
07:00
STIPULATIONS: (All stipulations are to be followed at all times)
1. An approved wrench must be used.
2. All appliances must be disconnected at the end of each day's use.
3. All caps must be replaced.
Permit for use of hydrant as noted above is:
to
17:00
XX
Approved
Denied
Site Plan Required
XX
Fees Paid $100.00
ignature of Fire 0 fficial
Title
Date
j`
I
'I
udy Wilkins
Administrative Secretary
03/03/09
Revision: 01/03/08
Office of the City Clerk
Whillock Contracting
Change Order #1
Demolition of 2300 Cleveland Ave. / 8320 23rd St.
Judy Hernandez (Engineering)
Forwarded Copy of Change Order to Contractor
1243 National City Blvd., National City, CA 91950
619-336-4228 phone • 619-336-4229 fax