HomeMy WebLinkAbout2009 CON L.B. Civil Construction - Change Order #3 Bay Marina Drive Widening ProjectCity of National City Bay Marina Drive Widening Specification 08-13 CHANGE ORDER #3 May 5, 2009 Contractor: L.B. Civil Construction A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract This change in contract is to install the future waterline under the sidewalk at Harrison adjacent to Bay Marina Drive. This installation will save the cost of removing and replacing the new sidewalk for the Streetscape phase of work later on. See attachment "A" for detail description and breakdown of costs. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change in Contract See Attachment "A". Construction Contract Accounting_ Summary Original Contract amount: $ 1,060,500.30 Net change by previously authorized Change Orders: $ 3,303.09 Contract amount prior to this Change Order: $ 1,063,803.39 Amount of this Change Order: S 2,537.50 New Contract amount: $ 1,066,340.89 Original Contract time (calendar days): Previously approved additional working days: Additional working days for this Change Order: Total Contract time (working days): (see Weekly Statement of Contract Time for completion date) Reviewed by: rincipal Civil Engineer Agreed to and Accepted by: -1. /Date L.B. Civil Construction Date cc: Contractor. Construction File. Project Manager. City Clerk 66 1 0 67 Recommended for approv City of National City Bay Marina Drive Widening Specification 08-13 ATTACHMENT "A" Change Order #3 This change in the contract will add the installation of an portion of an 8" water main on Bay Marina Driveon the north side under the new sidewalk, adjacent to Harrison per the approved Sweetwater Authority plan. The breakdown below is for reference only to demonstrate how the lump sum price was arrived at and includes all material, manpower, equipment, overhead, profit and any and all other costs associated with this change in work and there are no additional costs to the City. No. Item Units Quantity Unit Price Price 1 8" Water Main with end caps LF 20.00 125.00 2,500.00 2,500.00 Bonding 37.50 TOTAL COST 2,537.50 JUSTIFICATION: Extension of the watermain is required by Sweetwater Authority to provide adequate pressure for fire service in the immediate vicinity. This installation of this section of watermain is the first part of the overall plan to extend water service and thereby increase fire capacity on Harrison and 23rd for future development. This is just the first portion of the watermain work. The remainder of the additional watermain will be installed on the Streetscape portion over the improvements which includes Harrsion, 23rd and Cleveland Avenue. This portion of the watermain is necessary to install now to save the additional expense of removing and replacing the new sidewalk we are installing on Bay Marina Drive at Harrison for this project. NIA C-, LNC6RI, OREATE'D Office of the City Clerk L.B. Civil Construction Change Order No. 3 Bay Marina Drive Widening Project Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor 1243 National City Blvd., National City, CA 91950 619-336-4228 phone • 619-336-4229 fax