HomeMy WebLinkAbout2009 CON L.B. Civil Construction - Change Order #1 and #2 Bay Marina Drive Widening ProjectCity of National City Bay Marina Drive Widening Specification 08-13 CHANGE ORDER #1 April 27, 2009 Contractor: L.B. Civil Construction A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A". Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change in Contract See Attachment "A". Construction Contract Accounting Summary Original Contract amount: $ 1,060,500.30 Net change by previously authorized Change Orders: Contract amount prior to this Change Order: $ 1,060,500.30 Amount of this Change Order: $ 3,303.09 New Contract amount: $ 1,063,803.39 Original Contract time (calendar days): 66 Previously approved additional working days: 1 Additional working days for this Change Order: 0 Total Contract time (working days): 67 (see Weekly Statement of Contract Time for completion date) Reviewed by: rincipal ivil Engineer OOP Date Recommended for approval by: 7 Proj.ct Manager Agreed to and Accepted by: Approv 6 by: ) L. Civil Construction Date cc: Contractor, Construction File, Project Manager, City Clerk gi Date SoLka City of National City Bay Marina Drive Widening Specification 08-13 ATTACHMENT "A" CHANGE ORDER #1 This Change Order addresses the striping necessary to change 23rd Street from a one-way street to a two-way street so that there will be access to businesses in the area when Harrison Avenue is closed to thru traffic. This item was not included in the plans/specifications and is required in order to proceed with the closure of Harrison Avenue. No. Item 1 Traffic Signs 2 R3-2 (no left turn) 3 R3-1/R3-3 Mounted 4 W1-7/OM-3 Mounted to Type III 5 0M4-3 Mounted to Type III 6 W-14-2(no outlet) 7 W31A (Road ends 100') 8 W1-6/OM1-3 9 Striping 10 Detail 1 11 Detail24 12 Detail22 13 Black out detail 38 14 Black out detail 9 15 Thermoplastic w/ Glass Beads 16 Painted Type 1 Arrow Removal 17 Type IV arrow 18 Type VII arrow 19 Type IV 20 "Only" stencil 21 "STOP" legend Sign Removal 22 R6-1/R6-1 on same post 23 R6-1 24 R5-1/R5-1A/R61 25 R61-5 26 R3-1 27 R1-1 28 R3-2 29 One Additional Mobilization* *Includes core drilling, patching of sidewalk where signs are removed, traffic control, and disposal of removed posts and signs. CHANGE ORDER TOTAL: Units ea ea ea ea ea ea ea ea If If If If If If sf ea Quantity 10.00 $ 210.00 LINE ITEM 1.00 1.00 1.00 3.00 1.00 1.00 2.00 834.00 $ 0.38 LINE ITEM 429.00 85.00 60.00 60.00 200.00 54.00 $ 3.10 LINE ITEM 2.00 $ 52.50 $ 105.00 ea 4.00 ea 3.00 ea 4.00 ea 1.00 ea 1.00 ea 4.00 ea 4.00 ea 1.00 ea 1.00 ea 1.00 ea 1.00 ea 1.00 ea 1.00 Unit Price Price $ 52.50 $ $ 105.00 $ $ 52.50 $ $ 105.00 $ $ 131.25 $ $ 131.25 $ 131.25 $ 131.25 $ 131.25 $ 131.25 $ 131.25 $ 131.25 $ 520.59 210.00 315.00 210.00 105.00 131.25 $ 525.00 $ 525.00 $ 131.25 $ 131.25 $ 131.25 $ 131.25 $ 131.25 $ 520.59 $ 3,303.09 City of National City Bay Marina Drive Widening Specification 08-13 CHANGE ORDER #2 April 28, 2009 Contractor: L.B. Civil Construction A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A". Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change in Contract See Attachment "A". Construction Contract Accounting Summary Original Contract amount: $ 1,060,500.30 Net change by previously authorized Change Orders: $ 3,303.09 Contract amount prior to this Change Order: $ 1,063,803.39 Amount of this Change Order: $ 3,558.20 New Contract amount: $ 1,067,361.59 Original Contract time (calendar days): 66 Previously approved additional working dayE 1 Additional working days for this Change Ord,, 0 Total Contract time (working days): 67 (see Weekly Statement of Contract Time for completion date) Reviewed by: f �8OC, rincipal Civil Engine ate Agreed to and Accepted by: L.B Civil Construction Z8/0 Date cc: Contractor, Construction File, Project Manager, City Clerk Rec• ' -nded fo ap•roval by: Proje' 'anage Approveby: in'er - Date City of National City Bay Marina Drive Widening Specification 08-13 ATTACHMENT "A" CHANGE ORDER #2 This Change Order ADDS slurry, spacers, and casings along Bay Marina Drive . The Change Order is necessary because of requirements issued by AT&T and SDGE that were not known at the time of the bid and approval. No. 1 2 3 4 5 6 7 9 10 11 12 13 Item 4" conduit 5" conduit 4" Sweeps 5" Sweeps Spacers 50-50 mix Casing (delta) 3/4" Aggregate Pump Surcharge Labor: Pipe Layer Labor: Lead Man Labor SUBTOTAL: Less Line Item 33* Sub Mark-up GC Mark-up Bond Grand Total *Schilling Price for Casing Units Quantity Unit Price* If If ea ea ea sy If to ea hr hr hr 110.00 110.00 14.00 6.00 6.00 9.00 55.00 75.00 1.00 1.00 1.00 2.00 1.03 1.20 14.68 19.58 145.00 81.78 66.76 13.50 250.00 35.61 41.61 35.61 * Includes sales tax If 55 $ 78.48 15% Price 113.30 132.00 205.52 117.48 870.00 736.02 3,671.80 1,012.50 250.00 35.61 41.61 71.22 7,257.06 4,316.40 2,940.66 441.10 147.03 29.41 3,558.20 ACIVIL CONSTRUCTION, INC. April 29, 2009 Casing Extras at Location 11 City of National City Attention: Byron Wade 1243 National City Blvd. National City, CA 91905 Contract: Bay Marina Widening Specification No.:08-13 Billing Period: 4/1/09 — 4/30/09 Lump Sum to install larger casing, grout annular space, and install four additional conduits at location 11: Subcontractor Costs, with 15% Markup: LB Civil 5% Sub Markup: LB Civil 1% Bond: Grand Total: Sincerely, Geoff Bohne Geoff Bohne Vice President $3,381.76 $147.03 $29.41 $3,558.20 10650 Treena Street. Ste. 212 • San Diego. CA 92131 • (858) 578-5222 Ph • (858) 578-5226 Fx Job it 9008 OR PC.7 omr -f/QN —111111110. April 29, 2009 TO: L.B. Civil Construction, Inc. ATTN: Geoff Bohne PROJECT: Bay Marina Dr. Widening RE: Additional Cost for Steel Casing Installation Change Order Request This change order request is for Schilling Corporation to furnish all labor, material, and equipment necessary for additional cost associated with installation of steel casing for dry utilities. Work to be done adjacent to the 3316 SDG&E hand hole on Bay Marina Dr.(identified has location #11 on SDG&E Construction Order 2882731, sheet 1 of 4). Lump sum includes 15% markup. Submitted By: Terry 'Jard Estimator Lump Sum: $ 3,381.76 Accepted By: Geoff Bohne L.B. Civil Construction, Inc. 697 GREENFIELD DRIVE • EL CAJON, CALIFORNIA 91021-2983 • Phone (619) 579-6500 • Fax (619) 579-3733 www.schillingcorp.com • Contractors License #488153 43-0 1 Nl887 �. .tNCORPOlt ATED =� OFFICE OF THE CITY CLERK L. B. Civil Construction Change Order #1 and #2 Bay Marina Widening Project Judy Hernandez (Engineering) Forwarded Copies of Change Orders to Contractor 1243 National City Blvd., National City, CA 91950 619-336-4228 phone • 619-336-4229 fax