HomeMy WebLinkAbout2009 CON Stevens Construction - Change Order #41 Former Library Remodel Project4(1 i City of National City Library Remodel Project Specification # 08-01 CHANGE ORDER #41 March 24, 2009 • Contractor: A Change Order is hereby recommended for the following work in the amount identified below: Description of Change to the Contract: This Contract Change Order will provide funds for the installation of drywall repairs to the ceiling caused by installation of fire sprinkler piping located in the building basement as requested by National City Fire and executive staff and directed by the project engineer. Cost Reconciliation: This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change: These changes are made to this contract because the the repairs were not covered by the previous C.O. Information was not indicated/included on the construction plans and this addition is a requirement by the Fire Department to maintain protection and area separation per the governing NFPA Codes. Contract Accounting Summary: Original Contract Amount: 1,108,000.00 Net change by previously authorized Change Orders: 358,112.06 Contract amount prior to this Change Order: $ 1,466,112.06 Amount of this change order: 2,783.69 New contract amount: $ 1,468,895.75 Original contract time (working days): 40 Previously approved additional working days: 38 Additional working days for this change order: 0 Total contract time (working days): 78 (see Weekly Statement of Contract Time for completion date) Review y En Recommended for gppr aI by: 1 -( Dat ec Manaq anager Date 1 eed to andccepted by: Contractor Nal 09 Date cc: Contractor, onstruction File, Project Manager, City Clerk Abbfdua,W 3-24-09 Prepaired by: Gordon Day Justification for Change Order No. 41 This change order is to provide funds for the installation of drywall repairs to the ceiling as necessary to the old library basement. To install the sprinkler piping above the ceiling large holes were necessary to allow the pipe to be slid into the void between the pan deck and the dropped hard lid. The repair work was not quoted initially because there isn't any programmed use for the space at this time and the work could be covered as part of a tenant improvement contract at some later date. The new repairs will not be painted to match the existing finish. PCO # 47 M.A. STEVENS CONSTRUCTION, INC. 125 EAST 17TH STREET - NATIONAL CITY, CA 91950 OFFICE (619) 477-7893 - FAX (619) 477-7893 MASTEVENSINC@SBCGLOBAL.NET Date of Request: 03/23/2009 Owner: City of National City Project: National City Library Remodel Contract: Spec. No. 08-01 200 East 12 Street ORIGINAL CONTRACT AMOUNT: $1,018,000.00 DAYS: 90 PREVIOUS APPROVED CHANGE ORDERS: DAYS: 0 THIS CHANGE: DAYS: REVISED CONTRACT AMOUNT: $1,018,000.00 DAYS: 90 SUBCONTRACTED WORK DESCRIPTION Seal openings in drywall @ basement ceiling COST SUBCONTRACTOR COST $0.00 %5 OVERHEAD AND PROFIT $0.00 TOTAL SUBCONTRACTOR COST $0.00 M.A. STEVENS CONSTRUCTION, INC WORK DESCRIPTION LABOR (HOURS) MATERIAL (COST) MA Stevens self performed drywall repair 40 $300.00 MATERIAL EXPENSES TOTAL LISTED MATERIAL TAX 7.75% TOTAL MATERIAL Cost $300.00 LABOR EXPENSES TOTAL LABOR @ $51.50 40 $2,060.00 SUPERVISION @ $62.17 4 $248.68 TOTAL LABOR COST $2,308.68 1 JOB EXPENSES TOOLS/ MISC. 4% OF LABOR HOURS PERMIT AND INSPECTION FEES Dumpster and disposal EQUIPMENT RENTAL Bobcat Fuel Scissorlift ADMINISTRATION PROCESSING FEE (1 % OF LABOR HOURS) TOTAL JOB EXPENSE $0.00 M.A. STEVENS CONST. INC. SUMMARY TOTAL MATERIAL $300.00 TOTAL LABOR COST $2,308.68 TOTAL JOB EXPENSE SUBTOTAL $2,608.68 5% OVERHEAD AND PROFIT $120.43 TOTAL M.A. STEVENS CONST. COST $2,729.11 TOTAL SUBCONTRACTOR COST $0.00 TOTAL M.A. STEVENS CONST. cost $2,729.11 SUBTOTAL $2,729.11 BOND FEE 2% $54.58 TOTAL COST OF CHANGE ORDER $2,783.69 M.A. STEVENS CONSTRUCTION INC: 0 DATE APPROVED BY AUTHORIZED REPRESENTATIVE: DATE SIGN 2 - /RCORPOlt NMI) OFFICE OF THE CITY CLERK Stevens Construction Change Order #41 Former Library Remodel Project Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor 1243 National City Blvd., National City, CA 91950 619-336-4228 phone • 619-336-4229 fax