HomeMy WebLinkAbout2009 CON Industrial Coating & Restoration Services - Change Order #1 PD Security FenceCITY OF NATIONAL CITY FENCING PROJECT SPEC # 08-06 X CHANGE ORDER #1 January 6, 2009 Contractor: INDUSTRIAL COATING AND RES JOB: FENCING 08-06 Description of Change to the Contract: THE FOLLOWING IS PROPOSED: CHANGE ORDER #1 WORK TO REMAIN SAME PRICE OF WORK TO BE CHANGED AND CREDITED AS FOLLOWS: --_-__ ORIGINAL COST $5200.00 NEW COST : 3000.00 1,CREDIT $2200.00 TOWARDS THE TIME EXTENTION REQUEST ON CONTRACT 08-07 BULLET PROOF WINDOW ��— % INSTALL ADDITIONAL FENCING AT THE SOUTH PERSONNEL ENTRANCE AND SHEET METAL PLATE AT THE NORTH PEDESTRIAN ENTRANCE (LUMP SUM). Cost Reconciliation: This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents. This Change Order was negotiated at meeting held Tuesday January 6, 2009. Justification for Change: X THESE CHANGES ARE AT THE REQUEST OF BOTH CONTRACTOR AND OWNER FOR POLICE DEPARTMENT PERSONNEL AS ADDITIONAL SAFETY FEATURES TO THE PROJECT. (Please see attached justification). Contract Accounting Summary: Original Contract Amount: 43,535.00 Net change by previously authorized Change Orders: 9C 0.00 Contract amount prior to this Change Order: X 43, 535.00 Amount of this change order: X 3,000.00 New contract amount: $ 46,535.00 Original contract time (working days): 40 Previously approved additional working days: 0 Additional working days for this change order: 0 Total contract time (working days): 40 (see Weekly Statement of Contract Time for completion date) Reviewed by: x Principal Civil Engineer ate Agreed to and Accepted by: In Contractor satin. and Re 1.6.09 1 Date Corrected a w701Ants accept / Pt" Zoo I Recommepded for approval by: c-,2v� ?-°y•o9 Project Manager Approved by: Date )( City gineer Date cc: Contractor, Construction File, Project Manager, City Clerk Justification for Change Order No. 1 May13, 2009 City of National City Fence Project Project # NC-0806 During the final walk-thru with the Police Dep't (Lt. Tellez) there was a request made to make a couple changes and add fencing for security and safety concerns. Lt. Tellez asked that the security panel installed on the south gate be removed and a smaller version installed around the lockset similar to the gate on the north side of the parking structure with the reason being a person could not determine if someone were on the other side of the gate as they were exiting the facility. Lt. Tellez also requested that fencing be installed on the top of the block wall where the south gate is located because there was a possibility someone could enter over the top of wall. Industrial Coating had given a quote for this work at approximately 5,000 dollars, but because they had exceeded the number of workdays for the Glazing project (NC-0807) they adjusted their price to 3,000 dollars. I then agreed not to pursue action for liquidated damages for the Glazing project. This change was agreed upon by all parties concerned, City rep. (Ken Fernandez), Don Brown and Ind. Coating owner (Mahmoud Merzi) Respectfully, Don Brown City of Chula Vista Project Manager Office of the City Clerk Industrial Coating & Restoration Services Change Order No. 1 Police Dept. Security Fence Tess Corpuz (Engineering) Forwarded Copy of Change Order to Contractor 1243 National City Blvd., National City, CA 91950 619-336-4228 phone • 619-336-4229 fax