HomeMy WebLinkAboutWhillock Contracting Inc. Change Order #2 Demolition 2300 Cleveland and 830 23rd Street - 2009City of National City
National City Demo Project
Specification #08-02
CHANGE ORDER # 2
06/-09/2009
Contractor: Whillock Contracting Inc.
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
This Change Order will create a credit to the contract.
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and
the Contractor and represents the entire agreement for the uncompleted work described herein and
includes all costs associated with the work including but not limited to manpower, equipment, labor,
fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation.
Justification for Change in Contract
These changes are made at the request and direction City staff. The earthwork exposed contaminated
soils that if they were to be removed and disposed of, the costs would exceed the available
contingencies for the project.
Construction Contract Accounting Summary
Original Contract Amount: 137,770.50
Net change by previously authorized Change Orders: 230.12
Contract amount prior to this Change Order: 138,000.62
Amount of this change order: (6,727.00)
New contract amount: $ 131,273.62
Original contract time (calendar days): 90
Previously approved additional working days 0
Additional working days for this change order 0
Total contract time (working days): 90
Approved by:
in-er
n inee
Agreed to and Accepted by:
3/0
Recommended fVr approval by:
Project Manager
/9 fvf/c S /
‘.;
Date
illock Contracting Inc Date 0$04
cc: Contractor, Construction File, Project Manager, City Clerk
Principal g Civil r
Justification for Change Order No. 2
This change order is for a credit due to uncompleted work at the site. City
staff requested that the contractor stop work because the required disposal of
uncovered materials at the site would cause the contract to exceed the
available contingencies.
CK CONTRACT! INC.
LICENSE NO 572217
F.+ . BOX 2322
LA MESA, CA 91943-23'
(619)379-070
EX C AVA"t'INt; • GRADING • I) ..,'wMt` LF1'I N
RE LE TFOR
CHANGE ORDER
R
AUT IO. 7AT-1 N FOR CHANGES IN PLANS OR SPECIFIC
JOB DLjllolition Cleveland nid' ( t. ; t-Nirtional clkyM
ADDRESS Ski 30 (k ve l -ad Ave. °,t�t1
.tti'E"F
11
Contract
i
(taw litre
array+. rrt tttK shall
.ht ,;€tcltr>,rgncct a;k
Fit ith r iek k 47i37Yb32Iri4S4,
Ilcv-..:Liac.ratv%j
�s;d a sa
irtct tad 1Fr is;€� x aiul d� tart art t'g
ci au 9t € t .9^fr
+e-91-once rtP (La;;INC...
:r. ti1 t,4i1€1 tlaa i, k rcisr t a nrd t y rtr €c than cm
€all be ‘a.namcivrtai r Ljo nd 1 bilEatttrn of"ems h rgrla
ti.ANk,;rl iik "t
1 i tt' T
tlc
()4.00")
it Ren.
and slab left it
raining'
Stem 4t2
Credit Removal ofportion cif footing left in place.
Credit Grads both sites to drain.
TOTAL CREDIT
I"1-t1.. CHANGES' OK 90 I'IONS ABOVE AR1: APP'Rtµ TO "1 YP .x
(623.00)
ER
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Della, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
WHILLOCK CONTRACTING, INC.
Change Order #2
Demolition of Buildings Located at 2300 Cleveland
Avenue and 830 23rd Street
Judy Hernandez (Engineering)
Forwarded Copy of Change Order to Contractor