Loading...
HomeMy WebLinkAboutWhillock Contracting Inc. Change Order #2 Demolition 2300 Cleveland and 830 23rd Street - 2009City of National City National City Demo Project Specification #08-02 CHANGE ORDER # 2 06/-09/2009 Contractor: Whillock Contracting Inc. A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract This Change Order will create a credit to the contract. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the uncompleted work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. Justification for Change in Contract These changes are made at the request and direction City staff. The earthwork exposed contaminated soils that if they were to be removed and disposed of, the costs would exceed the available contingencies for the project. Construction Contract Accounting Summary Original Contract Amount: 137,770.50 Net change by previously authorized Change Orders: 230.12 Contract amount prior to this Change Order: 138,000.62 Amount of this change order: (6,727.00) New contract amount: $ 131,273.62 Original contract time (calendar days): 90 Previously approved additional working days 0 Additional working days for this change order 0 Total contract time (working days): 90 Approved by: in-er n inee Agreed to and Accepted by: 3/0 Recommended fVr approval by: Project Manager /9 fvf/c S / ‘.; Date illock Contracting Inc Date 0$04 cc: Contractor, Construction File, Project Manager, City Clerk Principal g Civil r Justification for Change Order No. 2 This change order is for a credit due to uncompleted work at the site. City staff requested that the contractor stop work because the required disposal of uncovered materials at the site would cause the contract to exceed the available contingencies. CK CONTRACT! INC. LICENSE NO 572217 F.+ . BOX 2322 LA MESA, CA 91943-23' (619)379-070 EX C AVA"t'INt; • GRADING • I) ..,'wMt` LF1'I N RE LE TFOR CHANGE ORDER R AUT IO. 7AT-1 N FOR CHANGES IN PLANS OR SPECIFIC JOB DLjllolition Cleveland nid' ( t. ; t-Nirtional clkyM ADDRESS Ski 30 (k ve l -ad Ave. °,t�t1 .tti'E"F 11 Contract i (taw litre array+. rrt tttK shall .ht ,;€tcltr>,rgncct a;k Fit ith r iek k 47i37Yb32Iri4S4, Ilcv-..:Liac.ratv%j �s;d a sa irtct tad 1Fr is;€� x aiul d� tart art t'g ci au 9t € t .9^fr +e-91-once rtP (La;;INC... :r. ti1 t,4i1€1 tlaa i, k rcisr t a nrd t y rtr €c than cm €all be ‘a.namcivrtai r Ljo nd 1 bilEatttrn of"ems h rgrla ti.ANk,;rl iik "t 1 i tt' T tlc ()4.00") it Ren. and slab left it raining' Stem 4t2 Credit Removal ofportion cif footing left in place. Credit Grads both sites to drain. TOTAL CREDIT I"1-t1.. CHANGES' OK 90 I'IONS ABOVE AR1: APP'Rtµ TO "1 YP .x (623.00) ER OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Della, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax WHILLOCK CONTRACTING, INC. Change Order #2 Demolition of Buildings Located at 2300 Cleveland Avenue and 830 23rd Street Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor