HomeMy WebLinkAbout2009 CON MJC Construction - Change Order #1 Park Facilities Project FurnishingsCITY OF NATIONAL CITY National City Parks Rehabilitation Furnishings Project Specification No. 07-06-B CHANGE ORDER #1 June 11, 2009 Contractor: MJC CONSTRUCTION A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A'. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. Justification for Change in Contract See Attachment "A". Construction Contract Accounting Summary Original Contract Amount: 84,722.00 Net change by previously authorized Change Orders: Contract amount prior to this Change Order: 84,722.00 Amount of this change order: 15,600.00 New contract amount: $ 100,322.00 Original contract time (calendar days): 25 Previously approved additional working days: 0 Additional working days for this change order: 29 Contractor will finish work no later than June 30, 2009 Total contract time (working days): 54 (see Weekly Statement of Contract Time for completion date) Reviewed by: riipal Civil Engin r Agreed to and Accepted by: IOLQ-sz--4--.4„,.. NSTRUCTION Date cc: Contractor, Construction File, Project Manager, City Clerk Recommended for approval by: Reviey d by Ci(y gineer Date CITY OF NATIONAL CITY National City Parks Rehabilitation Furnishings Project Specification No. 07-06-B ATTACHMENT "A" CO #1 DESCRIPTION: This change in contract is to make improvements to and around the Men's and Women's restrooms in Kimball park to ensure compliance with the Americans with Disabilities Act (ADA). The breakdown below is for reference only and the total cost includes all material, manpower, equipment, overhead, profit and any and all other costs associated with this change in contract. There are no additional costs to the City. No. Location Improvement 1 Kimball Park: Western Parking Lot Re -paint two (2) parking stalls. One van stall. One regular ADA stall. 2 Create path of travel to the restrooms 3 Install ADA compliant signage along path of travel 4 Replace or re -set concrete panels 5 Kimball Park: Central Building Remove and replace damaged/raised concrete strips 6 Kimball Park: Women's Restroom Remove entry door 7 Replace raised concrete entrance 8 Add welded tabs to lock gate open 9 Relocate hand dryer 10 Raise water closet plumbing 11 Install plumbing wrap at lavatories 12 Remove temporary partition 13 Remove water closet and patch hole in wall 14 Install universal wall signage with Braille 15 Remove, inspect, clean and polish all plumbing fixtures 16 Remove paint over -spray, sand blast and re -seal floor 17 Repaint repaired areas as necessary 18 Kimball Park: Men's Restroom Replace raised concrete entrance 19 Install plumbing wrap at lavatories 20 Raise water closet plumbing 21 Install grab bars 22 Relocate hand dryer 23 Add welded tabs to lock gate open 24 Install universal wall signage with Braille 25 Clean and polish all plumbing fixtures 26 Repaint repaired areas as necessary 27 Remove paint over -spray, sand blast and re -seal floor TOTAL COST FOR IMPROVEMENTS 1-27: $ 15,600.00 JUSTIFICATION: It was brought to the City's attention that certain bathroom facilities within National City parks must undergo certain improvements in order to achieve compliance with the Americans with Disabilities Act (ADA). The City is in the process of addressing a comprehensive list of ADA concerns for the parks located within the City. This change in contract is a preliminary step to address the need for the restroom facility in Kimball Park to come into compliance with ADA requirements prior to the Fourth of July celebration slated to take place in the park. This change in contract makes improvements to those aspects of the Kimball Park restroom facility that do not currently comply with ADA requirements. This change in contract includes improvements to the parking lot, the path to the restroom, and to the restroom itself. These improvements are required to achieve compliance with ADA requirements. This change in contract is also necessary because the ADA improvements outlined above are not included in the original contract, but they are within the type and character of work found in the original contract. CONSTRUCTION 3015 Sylvia St. Bonita, CA 91902 21:01 El 10 P GO Estimate Date Estimate # 6/10/2009 5 Name / Address City Of National City Project Description Qty Cost Total Kimball Park Modifications National City Parks Rehabilitation Specification No. 07-06-C See attached scope 1 15,600.00 15,600.00 Total $15,600.00 Kimball Park Western Parking Lot: o Re -paint the two accessible parking stalls adjacent to the trash enclosure to establish a van stall on the north side and a regular ADA stall on the south with stripping defining the path of travel going between the trash enclosures in the parking lot to the walkways. Refer to sheet K-A1.2 o Create a path of travel to the restroom identified by installing the necessary signage, and insure that the walkways do not contain any safety concerns per ADA requirements. ❑ Install ADA compliant signage parking and for the path of travel between the restroom and the Eastern and Western parking lots. Refer to sheet K-A1.2, 1.3, 1.7 match City standard for ADA signage. ( all locations noted herein) o Replace or re -set all concrete panels where heights exceed %4" min. standards, grind concrete joints only if directed to do so. Kimball Park Central Building: o Remove and replace damaged/ raised concrete strips between columns at the trellis area. Refer to K-A1.9 Women's Restroom: ❑ Remove entry door. ❑ Replace the raised entrance concrete. o Add welded tabs to lock gate open. o Relocate the Hand dryer. Unit actuator must not exceed 40" AFF. Meet ADA min. standard. o Raise water closet plumbing to achieve a min.17"AFF. ❑ install plumbing wrap at lavatories. o Remove temporary partition. ❑ Remove left side (Eastern) water closet and patch hole in wall, return to owner. ❑ Install universal wall signage with Braille. o Remove, inspect, clean and polish all plumbing fixtures. o Remove paint over -spray, Sand blast and re -seal floor. o Repaint repaired areas as necessary. Men's Restroom: o Replace the raised entrance concrete. a Install plumbing wrap at lavatories o Raise water closet plumbing to achieve a min.17"AFF relocate to proper location. ❑ Install grab bars @ 33-36" AFF verify quantity with owner. ❑ Relocate the Hand dryer. Actuator must not exceed 40" AFF meet ADA min. standard. o Add welded tabs to lock gate open a Install universal wall signage with Braille. o Clean and polish all plumbing fixtures. o Repaint repaired areas as necessary. i Remove paint over -spray, Sand blast and re -seal floor. The Scope of Work within this Change Order is reflected in thedrevised plans 9998,10006-7, and 10012-14-D. See Delta notes dated May 18th, 2009. OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax MCJ CONSTRUCTION Change Order #1 Parks Rehabilitation Furnishings Project Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor