Loading...
HomeMy WebLinkAbout2009 CON Koch Armstrong - Change Order #1 Street Resurfacing Project FY 09-10CITY OF NATIONAL CITY Resurfacing 09-10 Specification No. 09-09 CHANGE ORDER #1 September 8, 2009 Contractor: Koch -Armstrong A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract Contractor shall trim all trees in a manner that will allow paving and slurry equipment to pass that is consistant with standard tree trimming practice for all residential streets (slurry application) listed in the contract. This lump sum price includes all hauling and recycling of all trimmings. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. Justification for Change in Contract The original contract called for City forces to trim all the trees on the streets where work is to be performed so paving equipment may pass without breaking branches and damaging the trees. After coordinating with Public Works supervisors it has become apparent that City forces are unavailable to perform this work. Therefore, this change order has been negotiated with the contractor to trim all trees away from the road in a manner that is in general practice with tree triming that will allow all paving and slurry equipment to pass and to haul and Construction Contract Accounting Summary Original Contract Amount: 1,272,720.00 Net change by previously authorized Change Orders: Contract amount prior to this Change Order: 1,272,720.00 Amount of this change order: 4,433.74 New contract amount: $ 1,277,153.74 Original contract time (calendar days): 80 Previously approved additional working days: 0 Additional working days for this change order: 0 Total contract time (working days): 80 (see Weekly Statement of Contract Time for completion date) Reviewed by: Principal Civil Engin er Agreed to and Accepted by: Koch -Armstrong �y a 9-8 -og Date cc: Contractor, Construction File, Project Manager, City Clerk Recommended for er Reviewed by: Date 49/08/09 Proj ect—Enginee Date Approved by: cr/t/i-1 KOCH-ARMSTRONG GENERAL ENGINEERING, INC. P.O. BOX 1190, LAKESIDE, CA 92040-0906 TEL: (619) 561-2005 FAX: (619) 561-0317 KOCH-ARMSTRONG LICENSE 194819-A QUOTATION 09-125 COP -1 PAGE 1 TO: NATIONAL CITY STREET RESURFACING FY 06-07 ATTN: BYRON WADE 1243 NATIONAL CITY BLVD. TEL: (619) 336-4380 NATIONAL CITY , CA. 91950 CELL: FAX: (619) 336 4397 DATE: 8/31/2009 EMAIL: byronwadel@mac.com We propose to furnish all labor, material, and equipment necessary to perform the following items of work, subject to terms and conditions stated. This quotation expires 30 days from the date above and is good for work completed within one year of date above unless otherwise noted. JOB LOCATION STREET LIST (REV.2 CONTAINING FORTY ONE STREETS WITH ONE(1) DELETION. IDENTIFIED NATIONAL CITY STREET RESURFACING: CHANGE ORDER PROPOSAL #1- TREE PRUNNING, "KNOCK-EM-OUT". ITEM DESCRIPTION APPROX. QUANTITY UNIT UNIT PRICE TOTAL 1 RESIDENTIAL STREETS: PRUNE EXISTING TREES AND SHRUBS 13' FEET HIGH AND 1 LS SQUARE WITH FACE OF CURB. KNOCK-EM-OUT, INC 1 LS 4160.21 KOCH-ARMSTRONG'S MARK-UP ,„443%^ -6'24 0.i- SUBTOTAL .4 A784:2"4 BOND COST 1.50% "71 76" TOTAL CHANGE ORDER PROPOSAL 1 LS 4856.00' T TERMS: 1 INCLUDES: ONE MOVE IN. 2 EXCLUDES: NIGHT/ WEEKEND/ HOLIDAY WORK DAYS, ANY WORK/LABOR/ MATERIALS OR ITEM NOT SPECIFICALLY STATED IN QUOTE. CONDITIONS: 1.Does not include permits, bonds, any form of engineering(staking, testing, inspection, etc.), base under concrete, redwood headers, striping, traffic control, or utility adjustment unless otherwise specified. 2. Monthly Progress Payments and Full Payment upon completion. Accounts are delinquent after 30 days, and they are subject to the maximum finance charge allowable by law. 3. Work to be done in accordance with plans, specifications, and quantities identified above. Koch -Armstrong General Engineering, Inc. shall be notified in writing prior to any proposed changes. 4.Subgrade to be taken from +t- .10' to balance and at or below optimum moisture before Koch -Armstrong General Engineering, Inc. begins work unless otherwise specified. 5. Any unusual conditions of subsoil encountered, such as buried slabs, underground piping, trash deposits, etc. shall be deemed cause for additional charges. 6. Required California Preliminary Lien information (California Civil Code Section 3097/3098) shall be provided to Koch -Armstrong General Engineering, Inc. before work begins. 7. Subject to Credit Approval and verification of California Preliminary Lien information. 8. Class 2 material if included is 3t4" recycled Class 2 per Caltrans Standard Specification Section 26 unless otherwise noted. Acceptance: Please sign and return one copy -this quotation constitutes the sole and only agreement. Any prior agreements, negotiations, etc., not set forth herein are of no force or effect. Firm: NATIONAL CITY STREET RESURFACING FY 96-9+z By: By: KOCH-ARMSTRONG GENERAL ENGINEERING, INC. Date FRANK HERRERA Date NA. CAL1F.0RNLA. - 'NQUfpOf.ATED OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax KOCH ARMSTRONG GENERAL ENGINEERING Change Order #1 - Street Resurfacing Project, FY 09-10 Judy Hernandez (Engineering) Forwarded Copy of Change Order to the Contractor