2009 CON G.A. Dominguez - Change Order #2 Kimball House Museum
City of National City KIMBALL HOUSE PROJECT Specification #09-02 CHANGE ORDER #2 September 1, 2009 Contractor: G.A. DOMINGUEZ A Change Order is hereby recommended for the following work in the amount identified below: Description of Change to the Contract: This Contract Change Order is for moving fence per ADA requirements, bathroom repairs, garage stem wall repair, and pole Tight installation. Cost Reconciliation: This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change: This change is made at the direction of the City to Relocate existing gate per ADA requirements, bathroom repairs, garage stem wall repairs, and pole Tight installation at the Kimball House site. Contract Accounting Summary: Original Contract Amount (which includes $10,000 for asbestos): Net change by previously authorized Change Orders: 54,491.00 490.00 Contract amount prior to this Change Order: $54, 981.00 Amount of this change order (the total is $10,253 05 ;10,743..ga $10,000 for the asbestos equals l . $253.05 New contract amount: Original contract time (working days): 45 Previously approved additional working days: 15 Additional working days for this change order: 15 Total contract time (working days): 75 (see Weekly Statement of Contract Time for completion date) Revie,ved by: q//r/D Date 0 ect ngineer Date Agreed to and Accepted by: (51 743 $ 55,234.05 Approved by: $253.05 Con . �, or Date y Engineer e cc: Contractor, Construction File, Project Manager, City Clerk at it 08/24/2009 08:14 FAC 7602948606 G.A. DOIINGUEL 4001/004 G.A. Dominguez 533 Old Via Rancho Drive Escondido, CA 92029 Phone: 760-294-4116 * Fax: 760-294-8606 Email: admin@gadominguez.com Webstte: http:/lwww.gadomtnguez.com Date: 08/21/2009 Submitted To: Proposal Expires On: City of National City Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Attn: Adam Landa 09120/2009 Project Description: Install one post light --- REVISED QUOTE --- .aaeA IFic . ► v-.e0 7 We propose hereby to furnish all materials, labor, and equipment for the completion of the following job: Supply and install one post light including photocell, lamps, wiring back to the panel, trenching and concrete footing. Circuit to run in the same conduit as the chair Lift. Offered Bv: Accented Bv; Signature: Signature: Name (print): ge Dorninguez Name (print): Title: Owner Title: Company: O. A. Dominguez Company: Date: August 21, 2009 Date: Total Price $870.46 i4 PCs To+z+1� Progress Lighting Meridian Collection Textured Black 2-light Post Lantern - P5476-31 at ... Page 1 of 2 (rogress Lighting Meridian lection Textured Black 2-light Lantern P5476-31 Internet/Catalog # 100663237 Quan i.r tnra'stnr to My List T*item cannot be shipped to the following (s): AK, HI .hance to win a $250 Gift Caru. ea 1 More. Description Distinctive and stately with the feeling of old world elegance, the Meridian Collection features bold cast flourishes and fluted details. Clear, seeded glass diffuser adds rich texture and provides low -maintenance operation. Textured Black finish Clear seeded glass BHes@416dtwattt9ricrabb lights Fits 3 in. post (sold separately) MFG Brand Name : Progress Lighting MFG Model # : P5476-31 MFG Part #: P5476-31 Specifications Assembled Depth (In Inches) : 9 In. Assembled YLIalifitt(IMIbBIS)s)1219.88 In. Assembled Width (In Inches) : 9 In. Collection Name : Meridian Color / Finish : Black Energy Star Compliant : No Heiglatird sSITPIog-In : Hardwired Maximum Wattage Per Bulb : 60 W. Motion degree : n/a Recommended Base Type : candelabra SbtafdietesE8ypio clear, seeded Weight : 12 Lbs. Width : 9 In. Reviews Review and Rate Products Share your opinion about products you\ve purchased with others. Write reviews and rate products on a scale from 1 to 5. II1's easy and takes only a few minutes. Review Writing Guidelines: Focus on the product features and your experience with them. Provide details about why you like or dislike the product. Things to avoid: • Obscenities, discriminatory language, or other language not suitable for public forums • Advertisements, "spam" content, or references to other products, offers or Web sites • E-mail addresses, URLs, phone numbers, physical addresses or other forms of contact information • Critical or spiteful comments on other reviews posted on the page or their authors More Info Warranty For warranty information on this product, please call our Internet Customer Service Center at 1-800-435-4654. http://www.homedepot.com/Lighting-Fans-Outdoor-Lighting/h_d 1 /N-5yc 1 vZas7jZ66xgv/R... 9/2/2009 lgIuuzf uu4 DUN UNGUE'L Customer ID: City of National City Project ID: GO.2009-03 Estimate ID: CP02r1 CSI Description Estimate Unit Prices By Division Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: New Postlight Quantity Unit Lab $Ftinft Mat 9/Unit Equ $PUnit Sub $Unit Oth $/Unit Tot $dunft Total Cost (none) Install new postlight 1 Each 0.00 0.00 0.00 821.19 0.00 821.190 Total Grand Total Net Costs Subtotal O&P Bond Total Estimate 821,19 821,19 821.19 821.19 41.06 8.21 870.46 Saturday, August 22, 2009 Paget of 1 08724/2009 08:15 FAT 7602948606 G.A. DOKLNGEEZ 4E003!004 Construction Estimate Page 1 File Name: CP02r1 New Post Light.est City Craft@Hours Unit Material Labor Equipment Total Frank Bumanglag Electric City of National City ADA Restroom & Wheelchai REVISED August 21, 2009 Cost Proposal #f01 Install one postlight inclding concrete foundation, wiring and photocell. Progress Lighting Westport Collection, Black 2-light Post Lantern 1.00 L 1 @ 1.000 ea. 98.08 65.11 0.00 163.19 Incandescent lamps 2.00 L1 @.0000 Ea 5.45 0.00 0.00 5.45 Post Photocell 1.00 L1 @ 1.000 ea. 38.15 65.11 0.00 103.26 Concrete Base 1.00 L1 @4.000 lot 38.15 260.50 0.00 298.65 Schedule 40 PVC conduit, 10' lengths with coupling 314" 0.10 L1 c@.3200 CLF 1.70 20.84 0.00 22.54 Bell Box 1.00 L1@.2500 ea. 10.36 16.28 0.00 26.64 Type THHN 600 volt solid copper building wire # 12 0.12 L2@.8400 KLF 10.06 41.41 0.00 51.47 120/240 volt AC plug-in circuit breakers with 10,000 amp interrupt capacity 1 pole 20A 1.00 L1@.1000 Ea 15.59 6.51 0.00 22.10 Total Manhours, Material, Labor, and Equipment: 7.5 217.53 475.75 0.00 693.28 Subtotal; 693.28 08/24/2009 08:15 FAX 7602948606 G.A. DOMINCIJEZ C 004/004 Construction Estimate Page 2 File Name: CP02r1 New Post Lightest Qty Craft@Hours Unit Material Labor Equipment Total 15.00% Overhead: 3.00% Insurances: 103.99 23.92 Estimate Total: 821.19 G.A. Dominguez 533 Old Via Rancho Drive Escondido, CA 92029 Phone: 760-294-4116 * Fax: 760-294-8606 Email: admin@gadominguez.com Website: http://www.gadominguez.com Date: 08/20/2009 Submitted To: Proposal Expires On: City of National City Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Attn: Adam Landa Project Description: Relocate the Entry Gate 09/19/2009 V i f CB 1 q— 33c— 431-1 We propose hereby to furnish all materials, labor, and equipment for the completion of the following job: Relocate the existing wrought iron gate and add wrought iron fencing to match exiting per ADA requirments. Offered BV: Signature: Name (print): Title: Owner Company: G. A. Dominguez Date: August 12, 2009 Accepted By: Signature: Name (print): Title: Company: Date: Total Price $1,706.06 (4 Tass,s Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CP04 Estimate Unit Prices By Division Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Relocate Entrance Gate CSI Description Quantity Unit Lab $/Unit Mat $/Unit Equ $/Unit Sub $/Unit Oth $/Unit Tot $/Unit Total Cost (none) Re -install existing fencing 1 If 109.67 5.00 0.00 0.00 0.00 114.665 114.67 Re -install gate posts 2 ea. 91.39 17.00 0.00 0.00 0.00 108.388 216.78 Weld post extions 2 ea. 73.11 8.50 6.00 0.00 0.00 87.610 175.22 Remove fencing at gate opening, grind and 2 If 54.83 0.00 0.00 0.00 0.00 54.833 109.67 paint Remove existing gate & posts 1 ea. 18.28 0.00 0.00 0.00 0.00 18.278 18.28 Core -drill post holes 4 ea. 18.28 0.00 22.00 0.00 0.00 40.278 161.11 Paint new fencing & gate 9 If 14.62 3.75 0.00 0.00 0.00 18.372 165.35 Install new fencing 5 If 36.56 65.00 0.00 0.00 0.00 101.555 507.77 Total 1,468.84 Grand Total 1,468.84 Monday, August 24, 2009 Page 1 of 2 Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CP04 Estimate Unit Prices By Division Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Relocate Entrance Gate CSI Description Quantity Unit Lab $/Unit Mat $/Unit Equ $/Unit Sub $/Unit Oth $/Unit Tot $/Unit Total Cost Net Costs Subtotal 1,468.84 O & P 220.33 Subtotal 1,689.16 Subcontractor 0.00 Bond 16.89 Total Estimate 1,706.05 Monday, August 24, 2009 Page 2 of 2 GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS CRAFT: # IRON WORKER DETERMINATION: C-20-X-1-2008-2 ISSUE DATE: August 22, 2008 EXPIRATION DATE OF DETERMINATION: June 30, 2009** The rate to be paid for work performed after this date has been determined. If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Division of Labor Statistics and Research for specific rates at (415) 703-4774. LOCALITY: All localities within the State of California CLASSIFICATION (Journeyperson) Iron Worker -7 Reinforcing, Structtu 7 $31.83 7.58 6.81 Employer Payments Straight -Time Overtime Hourly Rate Basic Health Pension Vacation/ Training Other Hours Total bDaily bSaturday Sunday/ Hourly and Holiday Payments Hourly Holiday Rate Welfare Rate 1 1/2X 1 1/2X Fence Erector a 3.68 0.87 3.79 70.475 70.475 86.39 $25.96 5.50 4.54 a2.38 0.46 1.35 8 40.19 53.17 53.17 66.15 # Indicates an apprenticeable craft. Effective as of July 1, 2008, the issuance and publication of the prevailing wage apprentice schedules/apprentice wage rates have been reassigned by the Department of Industrial Relations from the Division of Labor Statistics and Research to the Division of Apprenticeship Standards. To obtain any apprentice schedules/apprentice wage rates, please contact the Division of Apprenticeship Standards or refer to the Division of Apprenticeship Standards' website at http://www.dir.ca.gov/das/das.html. a Includes supplemental dues. b Rate applies to the first 2 daily overtime hours and the first 8 hours on Saturday. All other overtime is at the Sunday/Holiday rate. RECOGNIZED HOLIDAYS: Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Internet at http://www.dir.ca.gov/DLSRiPWD. Holiday provisions for current or superseded determinations may be obtained by contacting the Prevailing Wage Unit at (415) 703- 4774. TRAVEL AND/OR SUBSISTENCE PAYMENT: In accordance with Labor Code Sections, 1773.1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Internet at http://www.dir.ca.gov/DLSR/PWD: Travel and/or subsistence requirements for current or superseded determinations may be obtained by contacting the Prevailing Wage .Unit at (415) 703-4774. 2 08/24/2009 08:13 FAX 7602948606 G.A. DOMINGUEZ Zo01 TRANSMISSION OK TX/RX NO RECIPIENT ADDRESS DESTINATION ID ST. TIME TIME USE PAGES SENT RESULT ******************** *** TX REPORT *** **** ***************** 0194 16193364397 08/24 08:11 01'59 4 OK G.A. Dominguez 533 Old Via Rancho Drive Escondido, CA 92029 Phone: 760-294-4116 * Fax: 760-294-8606 Email: admin@gadominguez.com Website: http://www.gadominguez.com Date: 08/20/2009 Submitted To: City of National City Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Attn: Adam Landa Project Description: Relocate the Entry Gate Proposal Expires On: 09/19/2009 Vic . fau Cp1 q 5 4.- 43' -1 We propose hereby to furnish all materials, labor, and equipment for the completion of the following job: Relocate the existing wrought iron gate and add wrought iron fencing to match exiting per ADA requirments. Offered By: Signature: I I Name (print): Ge ,r• Dominguez Title: Owner Company: G. A. Dominguez Date: August 12, 2009 Accepted By: Signature: Name (print): Title: Company: Date: Total Price $1,706.06 08/24/2009 17:13 Fla 7602948606 G.A. D©MINGUEZ G.A. Dominguez 533 Old Via Rancho Drive Escondido, CA 92029 Phone: 760-294-4116 * Fax: 760-294-8606 Email: admin@gadominguez.com Website: httpJlwww.gadominguez.com Date: 08/24/2009 Submitted To: Proposal Expires On: City of National City 09/2312009 Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Vet‘ 6t d III? 3 q 3 Attn: Adam Lartda 4TnRooti i2vPMtz e t46u. lkotkc Project Description: We propose hereby to furnish all materials, labor, and equipment for the completion of the following job: Remove and replace 1 damaged tub and tiles including new hot and cold water valves. Total Price $5,883.96 ()tiered By: Signature: Naas (print): G Title: Owner Company: G. A. Dominguez Date: August 24, 2009 Accepted Bv: Signature: Name (print): Title: Company: Date: CC. Ruses erer44v1) DONfNGUEZ 7602948606 08/2*/200e 17:15 FAX 06666A1 EXEVAILIWG WAGE DETEREINATION MAIM DT THE DIEECTOR. OF 12016616/AL AELA7tONS A.71116AHT TO CALIEORN1A 1.63011 CODE 1%17 1, &Pit1, wAxicLE 2. 66671ows 1716, 1773 AND 1113.1 rag 601060161$,L 31111,61170, 1116HW/if. HEAVY COMSTROCYEON AND D1E067116 PADJEcTS LOCALITY: SAN DIEGO COUNTY DETER E NATION: SDI-2000.1 PUNSTER TENDER 8/22/'2008 08/04/2009** 29.200 4.250 EIPLOYER 4.650 PAYMENTS AP3.990 0.810 0.550 STRAIGHTAME 8.0 43.450 OVERTIME 5&050 HOURLY RATE 0 72.650 , 4 ...-......----------- PLASTEFI OLEAN-UP LAOOREA 822t2008 08/04/2009** 08/30/2009** v 26.650 • ..- 33.290 4.250 5.020 4.650 Ar 3.9110 0.810 0-550 j 8.0 i 40.900 64220 A0 54.220 1 87 0 PLUMBER: 2122/2009 1 PLUMBTR, INOUsTRIAL A115 GENERAL PiPEEITIER Ak 9,920 Ad 2280 1,070 ILI 0.450 1 8.0 I 52.730 AK 70.570 AK 70.670 i 88.920 SEWER AND STOW DRAIN PIP0LAyER 2/22/2009 08/30/2009- v 22.540 5.020 I AN 9.020 Al 2.080 0.800 0.450 .....,. ILO 39.910 5 .930 w 1 51.900 1 62.900 SEWER AND STORM DRAIN PIPE TKADWILBB.... 8/22/2008 08/30/2009" v 13.830 6.020 0.310 - 0230 J. 0.300 11.0 1 20.690 27.310 w 27.310 1 33.930 ........ SERVICE 8 REPAIR (PLuMaERA4vAC-FaTER) 2/22/2009 06/30/2009** v 32.190 5.020 Ak 9,510 Al 2.960 0,400 4 0.450 8.0 ; 50.850 87.940 AM ---, 67.940 I AN 83.740 ,-T 4 4, 1 LANDSCAPEARFIGAT)N FITTER 8/22/2008 /2 ., AO 26.030 6.020 At+ 6.530 RP - 0.460 0.250 W 8.01-39290 52.310 -_____i. 52.310 64.100 14" iAll .... tANDSCAPBERRIGATION ASSISTANT ,,-„ JOURNEYMAN 8/2=000 4 8/22/2008 1 2/22/2009 ,_ 8/2212007 8/22/2007 2/22/2009 06/30/2009" 08/3012009" 03/31/2009" 07/31/2008* 07/311200B* -3- OE/30/2009" AO AO AT AT A 24.750 11.750 33.500 21.70o •--4--- 23.200 ---T 32.770 1 Au &OM 2,000 - 8.200 4.860 4.860 - -1 6.620 AN 4.540 AR 0.810 AP - . AW 0.480 0.100 0200 0.100 0.100 0.680 AX 0.250 w i 8.01 36.120 AY 48.490 I ats.4ao 59.780 • -1- 20.78o t 28.860 ---1 1 85300 i 82.560 -4- .- 39-790 I 50.300 LANOSCAPORRIGATION TRADESMAN FIRE SPRINKLER FrTTEF1 (PROTECTION ANO DoNTROL SvarEms, OVERHEAD AND uNDERGRotiNo) .,,. ..... ROOM 0250 0.250 0200 0200 0.460 W W w w 8.0 I 14,910 -;i-- 8.0 i 49.050 8.0 29280 ,.._, 8.0 1 30.780 20.780 65.800 36.790 „.i., 42.040 84.850 AY Aa 6.800 1.520 1.620 AV 7.930 - 1.000 1.000 - _.._ __-____. PITCH mall( SHEET USETAL WORKER CRVAC) r, 42.040 1 53.300 64.850 1 AY 81.230 8.0 1 46.460 1 aA - , , SHEET NETAL TFONNIGINJ ... ,..._ 2/22/2009 2/22J2009 8/22/2000 B/22t2000 C6130/2009* A 24.300 8.000 AU AU - 3,420 3.420 6.860 6.200r----- Av 1.250 - 3.150 3.150AP AP - - - - Avv AW 1 Dan 0.460 1 AX AX 0.410 0.410 --t BA , 36,010 i Av BJ3 12280 '} Ar 42.160 16280 Ay AY - 42.160 ' AY 54.310 16260 i AV 20.280 i. Mint WORKER , 0600/2009" ---..-.. TERRAZZO WORKER • ------ ----- .----- TERRAZZO FINISHER 08/30/2009* R R 33.630 ----4 26.590 0.670 0.360 0.120 0.120 W w 6.0 1 44330 9,0 3, ,. I ea 81.1 49.720 sc Bo -4--- 81.450 I SO 77.960 49.720 13D 83.010 08/30/2009* [sj 111LE FINISHER 8/22/2008 05/31/2009" v 21,070 6,200 1.450 - 0.230 6,320 w 4 29270 x 39.810 Y 39.810 : 50.340 - TILE LAYER 8/22/2008 05/31/2009* v 32,050 8.860 4.900 L._ - 0,230 0.480 W 8.0 0 x 80.540 Y so.say , 78.570 _„..._„_....,_„__ _,. i r- 1 .- - --- --- '+- 1 08/24/2009 17:14 FAX 7602948606 G.A. DOKINGUEZ Z 00fi!006 DETERMINATION: SD-23-102- -2008-1 FOR BUILDING CONSTRUCTION GROUP Boring Machine; Helper (Outside) Cleaning and Handling of Panel forms Concrete Screeding for Rough Strike -off Concrete, Water Curing Demolition Laborer, the cleaning of brick if perfomtid by an Employee performing any other phase of demolition work, and the cleaning of lumber Fire Watcher, timbers Brush Loaders, Pilers and Debris Handlers Flagman Laborer, General or Consi action Laborer, General Cleanup Laborer, Jetting Laborer, Temporary Water and Air Liras Material iiosensan (walls, slabs, floors and dirks) Plugging; filling of shoe -roll holes; Dry parking of concrete Rigging and Signaling Slip Form Raiser Filling of Cracks on any surface Tool Crib or Tool House Laborer Traffic Control by any method Water Pipeline Laborer Window Cleaner Wire Mesh Pulling - all concrete pouring operations GROUP Aaphalt Shoveler Ceiisem Dumper (on I yard or lamer mixer and handling bulk cement) Cesspool Dger and Installer Chuektender Chute Man, pouting concrete, the handling ate chute from readytnix trucks, such as walls, stake decks. floors, foundations: footings curbs, gutters and sidewalks Cutting Torch Operator (Demolition) Fine Grader, Concrete or Asphalt Paving Pot Tender and Form man Guinea Chair Headerboard Man -Asphalt Laborer, Packing Rod Steel and Pam Membrane Vapor Barrier it miller Power Broom Sweepers (small) Roto Scraper and Tiller Saedblaster (Pot Tender) Septic Tack Digger and Installer (Leadman) Tank Scaler and Cleaner Tree Climber, Faller, Chain Saw Operator, P'utsb erg Chipper and similar type brush shredders GROUP3 Buggy/while Man Compactor (all types including Tamper, Berko and Wacker Concrete Curer -- Impervious Membrane and Form Oiler Concrete Cutting Torch Concrete Pile Cutter Driller, Jaekbam„ er, 2 Y. ft. drill suet or longer Dri Pak-ft Maxidnt Impact Wrench, Multi -Plate Kettlerr e , Patmen and men applying asphalt, hay-kold, creosote, lime caustic and similar type materials ("applying" means applying, dipping, brushing or handling of such materials For pipe wrapping and waterproofing) (*Man of Pneumatic, Gas, Electric tools, Vibrating Machines, Pavement Breakers, Air Blasting, Conic-Alongs, and similar mechanical tools not separately classified herein Pipelayets Backup Man, coating, grouting, making of jo+nta, sealing, cprdking, diapering and including rubber taker joints, painting and any and all other services Rotary Scarifier or Multiple Head Concrete Chipping Scarifier Seel Headerboard than and Guideline Setter Treraleing Machine, Hand Propelled GROUP 4 Asphalt Raker, Luteman, Ironer, Asphalt Dumpman, and Asphalt Spreader Boxes (all tYPes) Cooctete Core Cutter, (walls, floors or ceilings) Grinder or Sander Concrete Saw Man, Cutting Walls or Flat work, Scoring old or new concrete Cribber, Shorer, Lagging, Sheeting and Trench Bracing, Hand -Guided Lagging Yammer Laser Beats in cormectitm with Laborer's work Oversize Concrete Vibrator Operator, 70 pounds and over Pipelayer Sandblaster (Nozzleman), Porta Shot -Blast, Water Blasting iiROI IP 5 Blasters Powderman- All work of loading holes, placing and blasting of all powder and explosive of whatever type, regardless of method used for such loading and placing Duller: All power drills, excluding Jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical brills without regard to the form of motive power Toxic Waste Removal Welding in connection with Laborer's work SPECIALTY GROUP: GUNITE Rebounds ui Group 1 Gttnrren Group 2 Nozzleman, Rodman Group 3 TUNNEL GROUP 2 Bull Gang, Mockers, Trackmen Chucktennder, Cabletender Concrete Crew (includes Rodders and Spreaders) Dumprnan Grout Crew Helper for Steel Form Raisers and Setters Muckers - Tunnel (hand or machine) Nipper Swamper (Brakeman, Switchman on Tunnel work) Vibrator men. Jackhammer, Pneumatic Tools (except driller), Multiplate Impact Wrench GROUP 3 Blasters, Driller, Powderman Cherry Pick nnan Grout Glnnnan Kemper and other Pneumatic Concrete Plater Operator mines in short dry tunnels under streets, highways and similar places Miners -Tunnels (hand or machine) Powde.ro,arr (tunnel wosk) Steel Form Raisers and Setters Timberauan, Retimberman - wood or steel Watchman GROUP 4 Powderman - Primer House (licensed) on tunnel week Shaft and Raise Miner GROUPS Blaster (licensed) all work of loading hoios, placing and blasting all powder and explosives of whatever type regardless of method used for such loading and placing. Shifters 29A 08/24/2009 17:13 FAX 7602948606 G.A. D0RI1NG1JEZ 4004/006 -"Ili Group 1 Group 2 Group 3 Group 4 Group 5 GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER I, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING, HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS CRAFT: # LABORER AND RELATED CLASSIFICATIONS DETERMINATION SD-23-102-4-2008-1 ISSUE DATE: August 22, 2008 EXPIRATION DATE OF DETERMINATION: June 27, 20091 Effective until superseded by a new determination issued by the Director of Industrial Relations. Contact the Division of Labor Statistics and Research at (41 5) 703-4774 for new rates after 10 days from the expiration date, if no subsequent determination is issued. LOCALITY: Ali totalities within San Diego County. Employer Payments Straight -Time Overtime Hourly Rate CLASSIFICATION` Basic Health Pension Vacation Training Other Hours Total Daily Saturday' Sunday (JOURNEYPERSON) Hourly and and Payments Hourly and Rate Welfare Holiday Rate 11/2X 1 1/2X Holiday LABORER: BUILDING CONSTRUCTION $24.97 4.26 3.85 3.75s .64 .30 8 L.3Z2Z/ 50.255 50.255 62.74 25.65 4.26 3.85 3.75b .64 .30 8 38.45 51.275 51.275 64.10 2636 4.26 3.85 3.75s .64 .30 8 39.16 5234 5234 65.52 27.16 4.26 3.85 3.75e _64 .30 8 39.96 53.54 53.54 67.12 27.59 4.26 3.85 3.751' .64 .30 8 40.39 54.185 54.185 67.98 # indicates an appreniiceable craft. Effective as of July 1, 2008, the issuance and publication of the prevailing wage apprentice schedules/apprentice wage rates have been reassigned by the Department of Industrial Relations from the Division of Labor Statistics and Research to the Division of Apprenticeship Standards. To obtain any apprentice schedules/apprentice wage rates, please contact the Division of Apprenticeship Standards or refer to the Division of Apprenticeship Standards' webaitc at http://wwtiy,dir.ca.gov/das/das.html. ' Saturdays in the same workweek may be worked at straight -time rate for the first 8 hours, if the employee was unable to complete the 40 hours during the normal workweele b Includes an amount per hour worked for supplemental dues. c For classifications within each group, see page 29A. RECOGNIZED HOLIiDAYS: Holidays upon which the general prevailing hourly wage rate for Holiday work shall be paid, shall be all holidays in the collective bargaining agreement, applicable to the particular craft, classification, or type of worker employed on the project, which is on file with the Director of Industrial Relations. If the prevailing rate is not based on a collectively bargained rate, the holidays upon which the prevailing rate shall be paid shall be as provided in Section 6700 of the Government Code. You may obtain the holiday provisions for the current determinations on the Internet at http://www.dir.ca.gov/DLSR/PWD. Holiday provisions for current or superseded determinations may be obtained by contacting the Prevailing Wage Unit at (415) 703-4774. TRAVEL AND/OR SUBSISI`FACEE PAYMENT: In accordance with Labor Code Sections 1773,1 and 1773.9, contractors shall make travel and/or subsistence payments to each worker to execute the work. You may obtain the travel and/or subsistence provisions for the current determinations on the Internet at http://www.dir,ca.agv/DLSRfPWD. Travel and/or subsistence requirements for current or superseded dueauinations may be obtained by contacting the Prevailing Wage Unit at (415) 703-4774. 29 Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CP06 CSI Description Estimate Unit Prices By Divisiori Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Replace one tub and associated tile work, Quantity Unit Lab StUnit Mat Sainit Equ &Unit Sub S/Unit Oth S/UnIt Tot 3/Unit Total Cost Net Costa Subtotal 5,207.83 0 & P 537.42 Subtotal 5,745.26 Subcontractor 8 1 .25 Bond 57.45 Total Estimate 5,883.96 Monday, August 24, 2009 Page 2 of 2 Z31-IDN1ROG 'V'D Customer ID: City of National City Project ID: GD-2009-03 Estimates ID: CP06 CSI Description Estimate Unit Prices EN Division Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Replace one tub and associated tile work. Quantity Unit Lab $!Unit Mat8/Unit Equ $/Unit Sub 8/Unit Oth $/Unit Tot 8/Unit Total Cost (none) Caulk corners and around tub Remove and replace the existing toilet Add new ceramic Ole Add new cement backer board Add new waste and overflow Add new Single Handle Moentrol Monticello tub/shower faucet 25 If 3.14 1.12 0.00 0.00 0.00 4.258 106.44 1 Each 50.61 18.00 0.00 0.00 0.00 68.610 68.61 713 sf 1.32 2.25 0.11 0.00 0.00 3.675 2,620.53 713 sf 0.17 0.25 0.00 0.00 0.00 0.415 295.91 1 Included 0.00 0.00 0.00 0.00 0.00 0.000 0.00 2 Included 0.00 0.00 0.00 0.00 0.00 0.000 0.00 Add new American Standard Amer -cast tub 1 Quote 0.00 0.00 0.00 1,825.00 0.00 1,625.000 1,625.00 Remove old plumbing 1 Included 0.00 0.00 0.00 0.00 0.00 0,000 0.00 Remove the cast iron tub 1 Each 202.44 0.00 25.00 0.00 0.00 227.440 227.44 Remove tile to the studs 713 Sq. Ft. 0.30 0.00 0.07 0.00 0.00 0.370 263.90 Total 5,207.83 Grand Total 5.207.83 Monday, August 24, 2009 Page 1 of 2 7,33DNI1NOU 08/24/2009 08:16 FAT 7602948606 G.A. D©h[INGLJEZ Lj001/004 G.A. Dominguez 533 Old Via Rancho Drive Escondido, CA 92029 Phone: 760-294-4116 * Fax: M60-294-8606 Email: admin@gadominguez.com Website: http://www.gadominguez.com Date: 08/24/2009 Submitted To: Proposal Expires On: City of National City Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Attn: Adam Landa 09/23/2009 V & Cax.4 fP t 9--'33, - 3°n Project Description: Remove and Replace the Garage Stem Wall We propose hereby to furnish all materials, labor, and equipment for the completion of the following job: Remove and replace the cracked stem wall at the north side of the garage. Offered Sy: Signature: Name (print): Title: Dapany: Date: Owner G. A. Dominguez August 24, 2009 Accented BY: Signature: Name (print): Title: Company: Date: Total Price $1,792.57 Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CP05 CSt Description (none) Estirnaje Unit Pries By Division Customer Name: City of National City Protect Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description; Remove & Replace Garage Stem Wall Quantity Unit Lab 9/Unit Melt $/Unit Equ $fUnit Sub $/Unit Oth $/Unit Tot $!Unit Total Cost Finish and Strop concrete Place 3500psi concrete 60 Ib bags Form new stem wall Install #4 horizontal bar & Anchor Bolts Install #4 epoxy set dowels Remove concrete stem wall to top of tooting Brace the exiting load bearing wall 1 tot 12 ea. 10 Ft. 10 Ft. 8 Each 10 Ft, 10 Ft, 134.66 0.00 0.00 0.00 0.00 134.664 134.66 14.03 6.75 6.00 0.00 0.00 28,778 345.33 14,03 3.02 0.00 0.00 0.00 17.053 170.53 2.81 5.25 0.00 0.00 0.00 8,056 80.56 11,22 17.60 2.25 0.00 0.00 31.072 248.58 11.22 0.00 8.25 0,00 0.00 19,472 194.72 22,44 13,20 1.25 0.00 0.00 36,894 368.94 Total 1,543.31 Grand Total 1,543.31 Monday, August 24, 2009 Page 1 of 2 IJ1JN1ii©G Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CP05 OM Description Estimate Unit Prices Bv Division Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Rernove & Replace Garage Stern Wall quantity Unit Lab 111.1nIt Met SIUnit Ego SiUnit Sub SILIntt Oth Sailed Tat WWI Total Cost Net Costs Subtotal 1,543.31 0 & P 231.50 Subtotal 1,774.81 Subcontractor 0.00 Bond 17.75 Total Estimate 1,792.55 ZIf1NBOtJ Monday, August 24, 2009 Page 2 of 2 08l24/2009 08:17 F .I 7602948606 G.A. DOMLNGUEZ I 004/004 GENERAL PREVAILING WAGE DETERMINATION MADE BY THE DIRECTOR OF INDUSTRIAL RELATIONS PURSUANT TO CALIFORNIA LABOR CODE PART 7, CHAPTER 1, ARTICLE 2, SECTIONS 1770, 1773 AND 1773.1 FOR COMMERCIAL BUILDING. HIGHWAY, HEAVY CONSTRUCTION AND DREDGING PROJECTS CRAFT: # CARPENTER DETERMINATION: SD-23-31-4-200E-1 ISSUE DATE: August 22, 2008 EXPIRATION DATE OF DETERMINATION: June 30, 2009" The rate to be paid for work performed after this date has been determined, If work will extend past this date, the new rate must be paid and should be incorporated in contracts entered into now. Contact the Division of Labor Statistics and Research for specific rates al (415) 703-4744. IOCAUITV: All localities within Sun Diego County Employer Payments Straight -Tune Overtime Hourly Rase CLASSIFICATION Basic Heahh. Prr4ina Vacation/ Training Oder flour Total Daily' Saturday' Sunday & (JOURNEYPERSON) Hourly and Holiday Payment Hourly Holiday Rate Welfarc Rate I ii2X t 1/2X 2X ENGINEERING CONSTRUCTION Carpenter (Heavy and Highway Work) 337.15 3.95 1.91 3.30 .42 .31 8 47.04 65.615 65.615 84.19 Brine Carpenter (Highway Work) 37.28 3.95 1.91 3.30` .42 .31 8 47.17 65.81 65.81 84.45 Millwright 37.65 3,95 1.91 3,30' .42 .31 8 47.54 66.365 66.365 85.19 Pile Drive` 37.28 3.95 1.91 3.30 .42 .31 8 47,17 65.81 65,81 84.45 Diva, Wet (up to 50P,, depthr S2.% 3.95 T.91 3.30' .42 .29 8 92.83 134.31 134.31 175.79 Diver, Standby 41.48' 3,95 1.91 3.30' .42 ,29 8 51.35 72.09 72.09 92.83 Diver's Tender 40.48' 3.95 1.91 330° .42 29 8 5035 70.59 7059 90.83 Assistant Tender 37.48* 3.95 1.91 3.3r1° .42 .29 8 47.35 66.09 66.09 84.83 DETERMINATION: SD-23-31-4-2008-2A ISSUE DATE: August 22, 2008 EXPIRATION DATE OF DE ItRM1NATION June 30, 2009' The rate to be paid for work performed after this date hm been determined. If work will extend past this date, tie new ram must be pad and should be incorporated in contracts entered into now. C ertact the Division of Labor Statistics and Research for specific rats at (415) 7034744. LOCALITY: All localities within San Diego BUILDING CONSTRUCTION ...Alp Carpenter S32.30 3.95 1.91 3.30' A2 Light Commercial 25.84 3.95 1.91 3.30' 42 58.03, 58.030 74,18 48.34, 48.348 61.26 DETERMINATION: SD-31-741-1-2008-1 ISSUE DATE: August 22, 2008 EXPIRATiO31 DATE -OF DETERMINATION: May 31, 2009* Effretiv'c &ai6l supsaedce by a new dowmination issued by the Dits nor of andtimiel Relations. Coronet the Division of Labor Statistics and Research at (415) 703-4774 for the new rates after 10 days from the expiration data, if no subsequent detrnainatioa is issued. LOCALITY: All localities within San Diego Employer Pay Its Sua3R19-Time Orertenc Newly Rate CLASSIFICATION Baltic Health Pension Vacation, Training Oder Hours Total Daily Satardaylr Sunday (JOURNEYPERSON) Hourly Aad Holiday Payment Hourly Sunday Rate Welfaa Rate 1 U2X 1 112X 2X Terra= Metal/a S34.10 3,95 1.91 3.15' 0.02 8 43.13 60.18 60.18 77.23 Terratao Finiabrx 27.66 3 95 191 3. 11° 0 02 8 36.63 50.43 50.43 64.23 8 Indicates at appeal/zombie aaft Effusive as of July 1, 2068; the issuance mad pubiekanion of the prevailing wage spprettioe schedulesiappreutice wage rates have been reassigned by the Department of industrial Relations from the Division of Labor Statistics and Research to the Division of Appraniooship Standards. To obtain any apprentice schedules/apprentice aces{ rules, please contact the Division of Apprenticeship Standards or rider to the Division of Apprenticeship Standards website at kitge//www.dircattovi'dasidasluirtl. ' Rate only amplioa to the first 4 daily overtime hours said the first 12 hats on Sattwday, ail other tlmte is paid at the Snaday;Nanday more. Saturday ' in the same workweek may be worked al atraiybt-tune talc for the Sit 8 Marrs if the employee was unable to complete the 40 hum during the normal workweek far reasons beyond the control of the Employer, such as inclement weather. in addition, for Building Construction only, rmsatn can be dee to major a elvenseral brrskddwn or leek of materials beyond the control of the Employer or berru tfhe aarpioyee voluntarily drosses to mass a scheduled weekday, he may velu m:61y work ea Saturdays at straight tiara rate, b Includes supplemental due& 'An additional 50.50 per hour when handing or working with new pressure-treeared cremate piling or ember, or hiving of tad pressure -treated creosote piliig. ° 55.1T remise a osiaimatm of 8 hears pay for say day rt pest thereof 'For specific cues over 50 it depth, contact the Division of Lebo -Statistics and Research. Rates for Technicians, Mnmfold Operamrs, Presstaimd Submersible Operators, s, Remote Control Vehicle Operators, and Remote Operated Vehicle Operators, as well ea rates for Pressurized Bell Diving sod Saturation Diving are available upon request. r Saturdays in the sass work week may be worked at weight -time rates if a job is shut down ding the oomhsl work week due to inclement weather, mater mechanical breakdown or lack of materials beyond the conned of the Employer. Work on Sunday, if it is the 14' aesseeutive workday, shall be paid at doable (2x) the straight -time rate. ' Rate only applies to the first 4 daily overtime hours and the first 12 hours en Saturday; all other time is paid at the Sunday/Holiday Tale. Saturday in Mr swne workweek rosy be worked et straight -time ram for the first 8 bass if the employee was usable to complee e the 40 hour, daring the normal workweek due to inclement weather, major mechanical breakdown or lack of meteriels beyond the crud of the Employer or because -the employee voluntarily chooses to miss a scheduled workday, he may voluntarily weak on 9untrdays st straight time rate. DESCRIPTION: Eneinermc¢ Coartruetioa Refers to construction which requires a (lass A license end includes bridges, highways, dam and also power plaids and otter Emmy industrial type projects The light commercial wage in shall trot sppty to institutional type taildings such u public er private schools, beep als, ldaariea, yes, or pact offices as other croaks tttvctusea. RECOGNIZED HOLIDAYS: Holidays upon which the general prevailing hourly wage tete for Holiday work shell be paid, shall be all holidays in the collective bargaining t en:nt, applicable to the putt:alm mefl, eleltsif cabs, or type of waekes misplayed on the preiwat. which is are tile with the firecuir of Industrial Relations. If tha parading take is net broad an a cnitaxively bargained cats, the holidays upon which the preeai1ing rue Mall be paid shall be es provided ui Section 6700 tithe Government Code. You may obtain the holiday provisions for die curtest dntennenahons on the I.der„ct at hoop:f1www.ttir.ca.sov/DLSII1PWD. Holiday provisions for ument or superseded determinations niay be obtained by contacting the Preceding Wage Unit at (415) 7034774. - TRAVEL AND/OR SUBSISTENCE PAYMENT: In a:cordsnce with Labor Code Sections 1773.1 and 1773.9, connecters shell mike travel andVot subsistence payments to each wotker to execute the work. You may obtain the travel and/or subsistence previsions for the current determinations on the Internet at Tlwarw4ir.cr .gov/DLSRNWU. Travel and/or subsistence raguirtmeats far currant or superseded determinations may be obtained by rms.-slog the Prevailing Wage unit et (415) 703=4774- 22 08/25/2009 15:35 FAX_ 7602948606 G.A. DOMINGI1EZ 14001/001 G.A. Dominguez 533 Old Via Rancho Drive Phone: 760-294-4116 Escondido, CA 92029 Fax: 760-294-8606 08f25i2009 No. 2 City of National City Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Phone:619-336-4394 Fax:619-3364397 Attn: Adam Landa Project: GD-2009-03 Kimball House Restroem Wheelchair Lift and Repair Project Dear Mr. Landa: ContractiPO #: 09-02 This letter is a request for a contract extension of 15 working days. The extension is necessary to perform the work under Cost Proposals 5 (garage stem wall repair) & 6 (bathroom tub replacement). Sincerely, City of National City KIMBALL HOUSE PROJECT Specification #09-02 LIGHT POLE BATHROOM GATE RELOCATION GARAGE FOUNDATION RE SUSTOTAt To744 WATER HEATER TOTAL 870.46 5883.96 1706.06 1792.57 10253.05 --497'43.0 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk INCORPORATE619-336-4228 phone • 619-336-4229 fax G. A. DOMINGUEZ Change Order #2 Kimball House Museum Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor