HomeMy WebLinkAbout2009 CON MJC Construction - Change Order #2 Park Facilities Project Furnishings,r CITY OF NATIONAL CITY National City Parks Rehabilitation Furnishings Project Specification No. 07-06-B CHANGE ORDER #2 September 25, 2009 Contractor: MJC CONSTRUCTION A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A". Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. Justification for Change in Contract The surface of the basketball court at Kimball Park is in need of IMMEDIATE repair. The base contract is primarily for work in Kimball Park and other parks and, therefore is substantially related to the base contract scope of work and will present a substantial cost savings to expedite this work through the change order process. Construction Contract Accounting Summary Original Contract Amount: 84,722.00 Net change by previously authorized Change Orders: 15,600.00 Contract amount prior to this Change Order: 100,322.00 Amount of this change order: 4,930.00 New contract amount: $ 105,252.00 Original contract time (calendar days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): 25 29 5 59 (see Weekly Statement of Contract Time for completion date) Reviewed by: Principal Civil Engineer Agreed to and Accepted by: cc: Contractor, Construction File, Project Manager, City Clerk Recommended for appr val by: nager Date CITY OF NATIONAL CITY National City Parks Rehabilitation Furnishings Project Specification No. 07-06-B Change Order #2, Attachment "A" Change In Contract: Repair and resurface the basketball court at Kimball Park. Contractor shall: 1. Waterblast the existing surface using a 3500 to 5000 psi hydroblaster to remove dirt and loose surface material. 2. Remove any bubbling or peeling of surfaces. 3.Patch all visible pop -outs and spalls using court patch grinder, grind or sand flush with existing slab. 4. Fill all cracks wide enough to accept court patch binder, grind or sand flush with slab. 5. Surface playing area with " Latex-ite Acrylic System" for true ball bounce: a. Clean and prepare surface. b. Apply one coat of acrylic resurfacer, producing a smooth, even, uniform finish. c. Apply one coat of sand filled acrylic color for court speed medium. d. Seal surface with one coat of unsanded acrylic color (to match existing color scheme). e. Stripe the court as per current USTA specifications in pure white acrylic. 6. Work for this change order will commence Friday October 3rd and be completed no later than Tuesday October 7th. Lump Sum Price: $4,930.00 l ' ritconi,dniasv OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax MJC CONSTRUCTION Change Order #2 Park Facilities Project Furnishings Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor