Loading...
HomeMy WebLinkAbout2009 CON Crest Equipment - Change Order #1 Concrete Improvements, FY 09-10CALIFORNIA -of- NATIoNALI CI S CHANGE ORDER # 1 C tp 1120 1— CONCRETE IMPRROVEMENT AT VARIOUS LOC., Spec. #09-05 October 27, 2009 Contractor: CREST EQUIPMENT, INC. A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract Contractor shall remove the existing regulator, supply & install (1) 3/4" wilkins 600 pressure regulator, supply the pipe & fittings required to make installation, with work to be done during regular hours. See attached contract change request cost dated October 21, 2009. Cost Reconciliation This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. Justification for Change in Contract The original contract does not indicate any removal and relocation of the pressure regulator where new sidewalk is to be installed at E. 14th Street. Apparently, an existing pressure regulator valve was found and is required to be relocated in conjunction of the new sidewalk to be installed within the property line based on investigation of the City representative and the Contractor. Construction Contract Accounting Summary Original Contract Amount: 188,750.00 Net change by previously authorized Change Orders: Contract amount prior to this Change Order: 188,750.00 Amount of this change order: 650.00 New contract amount: $ 189,400.00 Original contract time (calendar days): 40 Previously approved additional working day 1 Additional working days for this change ordi 0 Total contract time (working days): 41 (see Weekly Statement of Contract Time for completion date) Recommended for approval by: t Manager Agreed to and Accepted by: D. -a9 Date el iO297f Reviewed by: rincipal Civil Engineer Date Approv rest Equipment, Inc. Date Ci gineer 'ate cc: Contractor, Construction File, Project Manager, City Clerk 1243 National City Blvd., National City, CA 91950 CREST EQUIPMENT INC 161 SCOTTFORD bRIVE EL CAJON ,CA 92021 619-444-5061 Phone 619-447-6540 Fax Lic# A-892791 DBE/WBE # 36251 Proposal Date Estimate # 10/21/2009 751 Customer Name Ship To National City 1243 National City National City, CA Blvd 91950-4301 2731 14St National City, CA Item Description Unit Est. Quanity Unit Price Total #09-05-1 l Relocating Pressure Regulator includes: Remove the existing regulator, supply & install (1) 3/4" wilkins 600 pressure regulator, supply the pipe & fittings required to make installation, and work to do done during regular hours ea 1 650.00 650.00 Invoices must be paid 30 days or a 5% fmace charge will be applied We appreciate this opportunity to bid this project and look forward to dnino Total $650.00 business with you. Upon Acceptance Please Sign & Return U L1 /o.Lg.cA Wendi Belio, President OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax CREST EQUIPMENT, INC. Change Order #1 Concrete Improvements, FY 09-10 Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor