CHANGE ORDER # 1 C tp 1120 1—
CONCRETE IMPRROVEMENT
AT VARIOUS LOC., Spec. #09-05
October 27, 2009
Contractor: CREST EQUIPMENT, INC.
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
Contractor shall remove the existing regulator, supply & install (1) 3/4" wilkins 600 pressure regulator,
supply the pipe & fittings required to make installation, with work to be done during regular hours. See
attached contract change request cost dated October 21, 2009.
Cost Reconciliation
This change in the contract was reviewed and negotiated by and between the City Representatives and
the Contractor and represents the entire agreement for the work described herein and includes all
costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes,
insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order
hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans
for the work as provided by the City.
Justification for Change in Contract
The original contract does not indicate any removal and relocation of the pressure regulator where new
sidewalk is to be installed at E. 14th Street. Apparently, an existing pressure regulator valve was found
and is required to be relocated in conjunction of the new sidewalk to be installed within the property line
based on investigation of the City representative and the Contractor.
Construction Contract Accounting Summary
Original Contract Amount: 188,750.00
Net change by previously authorized Change Orders:
Contract amount prior to this Change Order: 188,750.00
Amount of this change order: 650.00
New contract amount: $ 189,400.00
Original contract time (calendar days): 40
Previously approved additional working day 1
Additional working days for this change ordi 0
Total contract time (working days): 41
(see Weekly Statement of Contract Time for completion date)
Recommended for approval by:
t Manager
Agreed to and Accepted by:
D. -a9
Date
el iO297f
Reviewed by:
rincipal Civil Engineer Date
Approv
rest Equipment, Inc. Date Ci gineer 'ate
cc: Contractor, Construction File, Project Manager, City Clerk
1243 National City Blvd., National City, CA 91950
CREST EQUIPMENT INC
161 SCOTTFORD bRIVE
EL CAJON ,CA 92021
619-444-5061 Phone
619-447-6540 Fax
Lic# A-892791
DBE/WBE #
36251
Proposal
Date
Estimate #
10/21/2009
751
Customer Name
Ship To
National City
1243 National City
National City, CA
Blvd
91950-4301
2731 14St
National City, CA
Item
Description
Unit
Est. Quanity
Unit Price
Total
#09-05-1 l
Relocating Pressure Regulator
includes: Remove the existing regulator, supply & install (1)
3/4" wilkins 600 pressure regulator, supply the pipe & fittings
required to make installation, and work to do done during
regular hours
ea
1
650.00
650.00
Invoices must be paid 30 days or a 5% fmace charge will be applied
We appreciate this opportunity to bid this project and look forward to dnino
Total
$650.00
business with you.
Upon Acceptance Please Sign & Return
U L1 /o.Lg.cA
Wendi Belio, President
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
CREST EQUIPMENT, INC.
Change Order #1
Concrete Improvements, FY 09-10
Judy Hernandez (Engineering) Forwarded
Copy of Change Order to Contractor