HomeMy WebLinkAbout2009 CON PTM General Engineering Services - Change Order #1 Safe Routes To School, FY 09-10CHANGE ORDER #1 October 28, 2009 Project: Safe Routes to School Specifiaction #09-14 Contractor: PTM Engineering A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A". Justification for Change in Contract The original contract called for the supply and installation of traffic safety devices and equipment including solar - powered radar speed feedback sign units, solar -powered flashing beacon units, and pedestrian countdown modules. This City -initiated change order is necessary because the removal and salvaging of poles/signs and the flushing of poles and anchor sleeves even with the pavement was not contemplated by the original contract but is of the same type and character as the work performed in the original contract. PTM Engineering has experience with and is competent to perform the work contemplated in this change order. Cost Reconciliation See Attachment "A". Construction Contract Accounting Summary Original Contract Amount: 595,580.00 Net change by previously authorized Change Orders: Contract amount prior to this Change Order: 595,580.00 Amount of this change order: 3,214.04 New contract amount: $ 598,794.04 Original contract time (calendar days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): 60 0 0 60 (see Weekly Statement of Contract Time for completion date) Reviewed by: Rec m ,�`' ' for6p�roval b Civil EnDate rit�ipal gt er Agreed to and Accepted by: Projec"nage Approve by: r/ (&i Dat ity n•`n- 'r / Date Appr ved by: cc: Contractor, Construction File, Project Manager, City Clerk City Monagcr Dote 1243 National City Boulevard National City, California 91950 Tel (619) 336-4380 Fax (619) 336-4397 CITY OF NATIONAL CITY Safe Routes to School Specification No. 09-14 ATTACHMENT "A" CO #1 DESCRIPTION: Contractor shall remove and salvage 2"-square and 2"-round-steel sign pole; salvage pole mounted signs; drive poles and anchor sleeves flush with pavement; grind down poles and anchor sleeves until flush with pavement; and patch holes with City -approved grout mix. This change order is a lump sum price. The lump sum price includes all removal, disposal and salvaging of signs and poles; all flushing of poles and anchor sleeves even with the pavement; and all patching of holes with approved grout mix. The breakdown below is for reference only and the total cost includes all material, manpower, equipment, overhead, profit and any and all other costs associated with this change in contract. There are no additional costs to the City. No. 1 Labor Foreman Laborer Laborer Description Hours/Quantity Rate Total Price 16 58.66 16 34.70 8 34.70 938.56 555.20 277.60 Sub -total: 1,771.36 Surcharge Mark-up (11%): Sub -total: Overhead/Profit Mark-up (20%): Total (Labor): 2 Equipment 2007 Ford F-550 16 32.30 Generator 16 1.90 Ford F-250 Pick -Up 8 19.49 3 Material Misc. Materials 1 40.00 194.85 1,966.21 393.24 2,359.45 516.80 30.40 155.92 Sub -total: 703.12 Mark-up(15%): 105.47 808.59 40.00 Sub -total. 40.00 Mark-up(15%): GRAND TOTAL: 6.00 46.00 3,214.04 DAILY EXTRA WORK REPORT National City Contractor Job. PTM914 -National City Safe Routes To School work Pertormed By: Freeway.. Electric Description of Work: Removal Of 16EA Signs And Posts, Labor Charges Craft ID Lot ELC SBE L02 LE3R Employee Name B Estrella A Briseno L03 LBR P Kobus Equipment Charges Equipment ID Description 1-01 101 2007 Ford F-550 Flatbed (PTM`18) E02 151 Generator RT Firs OT 1-Irs Subs Units RT Rate 16.00 58.660 34.700 34.700 RT Hrs - ; OT His RT Rate' 16.00 32.300 16.00 1.900 contract. 09-10 GL;ange Order Rifling Number Report Date Perform Date 991 1.0 10/26/2009 10/25/2009 Labor C Subs Rate Extended RT 938.56 sC 11.00% 555.20 I OT tabor 277.60 sc 11.00% -_^-_— _-- -: Subtotal Labor Oi Rate D&ay Factor Extended Subsistence 516.80 Other Expenses -- ------------ 30.40 Mu 20.00% 03 105 Ford F-250 Pick -Up (PTM28) Material/Specialist Work/Lump Sum or Unit Price Paymeri Invoice No. Invoice Date Vendor Name f Invoice Description.... 8.00 19.490 Units Unit Priee 155.92 Labor Total Fxtendert Equipment Charges 703.12 105.47 arnes 1,771.36 194.85 0.00 Mot VERBAL 10/25/2009 Home Depot! Misc. Material 1.000 L9 40.00 40.00 Subtotal MU 15.00% Equipment Total Subtotal MU Material Total Activity Total Work Total 1,966.21 0.00 000 393.24 2,359.45 808.59 Material Charges 40.00 15.00% 6.00 46.00 3,214.04 Bill Subtotal 3,214.04 3,214.04 Bin Total + Page 1 3,214.04 NTS Universal Bill Form 010704 ENT h - Ed'48i11s_com • Request for Change Order #1 To: Brian Mendoza, PTM General Engineering From: Steve Manganiello, City of National City Date: 10/22/09 Work: Pole/sign removals for Safe Routes to School Project, FY 09-10 (Spec. 09-14) Description: Work involves removing 2"-square and 2"-round steel sign poles and salvaging those still in useable condition. All signs mounted on the poles shall also be salvaged. For any remaining sections of poles and/or anchor sleeves that extend above ground 2-inches or less, drive into pavement until flush. For any remaining sections of poles and/or anchor sleeves that extend above ground greater than 2-inches, grind down to 2-inches or less then drive into pavement until flush. All holes shall be patched with City - approved grout mix. 1) EB Plaza between Euclid and School Xing - Remove and salvage Telspar pole and SR-4 2) WB Plaza between Harbison and School Xing - Remove and dispose of sign pole; salvage SR-4 3) WB 4th, east of U - Remove and dispose of sign pole and "crime watch" sign 4) NB Palm, north of 4th - Remove and salvage Telspar pole and SR-4 5) SB Granger, south of 20th - Remove and salvage Telspar pole and S1-1 6) NB Granger, adjacent to Granger Jr. High - Remove and salvage Telspar pole and S1-1 7) WB 24th, east of Lanoitan - Remove and salvage Telspar pole and SR-4 8) NB Lanoitan, north of 24th - Remove and salvage Telspar pole and SR-4 9) WB 18th, west of Grove - Remove and salvage Telspar pole and SR-4 10) EB 16th between E and F - Remove and dispose of sign pole; salvage SR-4 11) SB Highland between 24th and 28th - Remove and dispose of sign pole and SR-4 12) EB 24th, east of D - Remove and dispose of sign pole; salvage SR-4 13) WB 24th, west of Highland - Remove and dispose of sign pole; salvage SR-4 Page 1 of 1 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Della, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax November 12, 2009 Ms. Elizabeth Mendoza de McRae PTM General Engineering Services, Inc. 5942 Acorn Street Riverside, CA 92504 Dear Ms. Mendoza de McRae, On October 28th, 2009, Change Order #1 to Agreement was executed between the City of National City and PTM General Engineering Services, Inc. We are enclosing for your records a fully executed original Change Order. Sincerely, 0/ A Al Michael R. Da a CMC City Clerk Enclosure cc: Engineering Dept.