HomeMy WebLinkAbout2009 CON G.A. Dominguez - Change Order #3 Kimball House Museum.- CALIFORNIA CHANGE ORDER #3 KIMBALL HOUSE SPEC. #09-02 October 27, 2009 TiONAL Cirri ( a' I IC;ORPORAT1;U Contractor: G.A. DOMINGUEZ A Change Order is hereby recommended for the following work in the amount identified below: Description of Change to the Contract: This Contract Change Order is for improvements to the pad for the Wheelchair Lift. Cost Reconciliation: This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change: During the concrete pad excavation, the contractor encountered unsuitable material. The material has to be removed and replaced with suitable soils. This change is made at the direction of the City, therefore, the base needs to be redesigned for the wheelchair Lift . The Engineer of Work has reviewed and redesigned the new concrete pad with a thicker base. Contract Accounting Summary: Original Contract Amount (which includes $10,000 for asbestos): Net change by previously authorized Change Orders: 54,491.00 743.05 Contract amount prior to this Change Order: 55,234.05 Amount of this change order : New contract amount: Original contract time (working days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): Revered Date Project ngineer Date Agreed to and Accepted by: o>Arr�rctor Date cc.. Contractor, Construction File. Project Manager, City Clerk 1243 National City BI. National City CA. 91950 45 30 10 85 8,452.12 $ 63,686.17 Recomm;.,.ed fgt:,tpgrovelb Date Date 1 G.A. Dominguez 533 Old Via Rancho Drive Escondido, CA 92029 Phone: 760-294-4116 * Fax: 760-294-8606 Email: admin@gadominguez.com Website: http://www.gadominguez.com Date: 10/15/2009 Submitted To: Proposal Expires On: City of National City Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Attn: Adam Landa 11/14/2009 Project Description: Install new 24" class II aggregate base and Slab Mod. We propose hereby to furnish all materials, labor, and equipment for the completion of the following job: Remove and export the bad soils under the chair lift concrete slab to a depth of 24" and install a class II aggregate base pad compacted at 95% and change the slab detail all per Sketch S-2. Owner will supply spoils dump site with -in 5 miles. Time extension required: 30 working days. Offered By: Signature: /� Name (print): Ge. g Dominguez Title: Owner Company: G. A. Dominguez Date: October 15, 2009 Accepted By: Signature: Name (print): Title: Company: Date: Total Price $8,452.12 Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CP07-10-15 Estimate Unit Prices By Minor Section Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Install a 24" Deep Aggregate Pad. CSI Description Quantity Unit Lab $/Unit Mat $/Unit Equ $/Unit Sub $/Unit Oth $/Unit Tot $/Unit Total Cost (none) Owner Spoils Dump Site 1 lot 0.00 0.00 0.00 0.00 -258.29 -258.290 -258.29 Negotiated Discount for this Cost 1 0.00 0.00 0.00 0.00-1,000.00 -1,000.000 -1,000.00 Proposal Concrete 1.5 Yd. 12.65 105.00 0.00 0.00 0.00 117.653 176.48 #4 Rebar 160 Ft. 1.52 0.85 0.00 0.00 0.00 2.368 378.93 Excavate Footings 1.5 Yd. 270.76 0.00 0.00 0.00 0.00 270.763 406.15 Install Aggregate Base 19 Yd. 145.50 32.60 25.00 0.00 0.00 203.109 3,859.07 Remove Soils 19 Yd. 145.50 0.00 0.00 0.00 50.00 195.504 3,714.57 Total 7,276.90 Grand Total 7,276.90 Thursday, October 15, 2009 Page 1 of 2 Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CP07-10-15 Estimate Unit Prices By Minor Section Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Install a 24" Deep Aggregate Pad. CSI Description Quantity Unit Lab $/Unit Mat $/Unit Equ $!Unit Sub $!Unit Oth $/Unit Tot $/Unit Total Cost Net Costs Subtotal 7,276.90 O & P 1,091.53 Subtotal 8,368.43 Subcontractor 0.00 Bond 83.68 Total Estimate 8,452.12 Thursday, October 15, 2009 Page 2 of 2 coPESS I 4, 4!5) S A. 446 qC r` 9j 42 c (. NO EXP. *''' LIMITS OF EXCAVATION CONCRETE SLAB -ON -GRADE I FT. CONTRACTOR SHALL REMOVE EXPANSIVE SQL MATERIAL TO A MINIMUM DEPTH OF 2 FT. BELOW PROPCSED SLAB AND CURB ELEVATION, CONTRACTOR SHALL IMPORT GRANULAR FILL MATERIAL, PLACE AT S THICK LAYERS AND COMPACTED TO A MIN. 95% R.C. CONC. FIATWORK PER ARC-O. 1.-O. CONCRETE SLAB PER PLAN 4 (2) 9 4 TOP & BCr. CONT. FOOTING DETAIL (2) 94 BARS TOP & BOT. CONT. FOOTING DETAIL (E) FOOTING CONCRETE SLAB RECOMMENDA 77ONS WHEELCHAIR LIFT PAD: USE MINIMUM 6' THICK CONCRETE SLAB ON GRADE YATH A4 EARS 0 (8' 0/C CENTERED. PLACE 4' CLEAN WASHED BEDDING SAND W/ 10 MIL 'ASOUEEN VAPOR BARRIER PLACED AT MID -DEPTH OF SAND. ONCRETE SLAB PER PLAN PLANS PREP. D BY: DATE. 9/23/09 PLANS CHECKED BY: DATE' P CF. No. 65416 LUIS A. IABRADA, P.E. GORDON DAY, BUILDING PROJECT MANAGER NATO City ueeAton.* Engineering Department DRAWING NO. S-2 PLANS FOR THE IMPROVEMENT OF FRANK KIMBALL HOUSE ADA ACCESIBLE BATHROOM AND WHEELCHAIR LIFT ELEVATOR ADDITION CITY OF NATIONAL CITY KIMBALL HOUSE BATHROOM AND WHEELCHAIR LIFT PROJECT 09-02 PO# Vendor: PO Amount Adj PO Arnt' PO Balance 72969 GA DOMMINGUEZ 54,491.00 26,392.91 KIMBALL HOUSE CONSTRUCTION (TOTAL AMOUNT FOR PROJ $80,000) Account No. ; Amount 511-409-500-598- 085 54,491.00 Acct Adjusted Amount '. 63,6:..17 Balance invoice Date 7/31/2009 $ Amount 6, '."2.91 , 6,265.80 Invoice Number #1 8/31/2009 $ 9,406.26 #2 9/12/2009 $ 12,189.60 #3 10/15/2009 $ 9,431.60 #4 Total i 37,293,26 C/O No. Amount Change Order Description 1 490.00 WATER HEATER INSTALLATION 2 $ 253.05 FOUNDATION REPAIR, BATHROOM REPAIR, LIGHT POLE, RELOC. GATE-- actual C/O was $10,253.05 but there was $10,000 already encumbered on P.O. 3 $ 8,452.12 Repl. And Removal of soil and new foundation for wheel lift 4 5 Total $ 9,195.17 OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax G. A. DOMINGUEZ Change Order #3 Kimball House Museum Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor