HomeMy WebLinkAbout2009 CON G.A. Dominguez - Change Order #4 Kimball House MuseumCALIFORNIA CHANGE ORDER #4 KIMBALL HOUSE SPEC. #09-02 December 2, 2009 NTI.)N L_ t- . INCORPORATED Contractor: G.A. DOMINGUEZ A Change Order is hereby recommended for the following work in the amount identified below: Description of Change to the Contract: This Contract Change Order is for the contractor to re- mobilize for compaction test, and finish the wheelchair lift pad installation at Kimball House. The contractor was directed to wait for the city's soil tester to perform the compaction test. The cost is for the Bobcat rental, dumpster, and the men that were there at the site. Cost Reconciliation: This change in the contract was reviewed and negotiated by and between the City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms and conditions. Justification for Change: During the concrete pad excavation, the contractor encountered unsuitable material. The City required the contractor to meet the contract specification at minimum 95% compaction by removing the existing soils and replacing with class II base Material. The contactor was directed to wait for a soil tester to perform compaction test which took some time. Therefore, a re -mobilizing cost needs to be considered for the contractor to come back with the equipment and his crew to complete the work. Contract Accounting Summary: Original Contract Amount (which includes $10,000 for asbestos): Net change by previously authorized Change Orders: Contract amount prior to this Change Order: Amount of this change order : New contract amount: Original contract time (working days): Previously approved additional working days: Additional working days for this change order: Total contract time (working days): Reviewed by: /Z rincipal Civil Engineer Date Agreed to and Accepted by: Con actor 54,491.00 9,195.17 63,686.17 1,840.65 45 40 85 Recom 65,526.82 fo, appr rdect Man✓.er Da e Appro a Ci ngine- Date cc: Contractor, Construction File, Pri243,1fialitoadlCity Blvd. National City, CA 91950 G.A. Dominguez 533 Old Via Rancho Drive Escondido, CA 92029 Phone: 760-294-4116 * Fax: 760-294-8606 Email: admin@gadominguez.com Website: http://www.gadominguez.com Date: 12/03/09 Submitted To: Proposal Expires On: City of National City 01/02/2010 Engineering Department 1243 National City Boulevard National City, CA 91950-4301 Attn: Adam Landa Project Description: Re -Mobilize (Revised 12-03-2009) We propose hereby to furnish all materials, labor, and equipment for the completion of the following job: Re - Mobilize for Class II Base instllation. Offered Bv: Signature: Name (print): Title: Company: Date: George Dominguez Owner G. A. Dominguez December 03, 2009 Accepted Bv: Signature: Name (print): Title: Company: Date: Total Price $1,840.65 Customer ID: City of National City Project ID: GD-2009-03 Estimate ID: CPO9R Estimate Unit Prices By Division Customer Name: City of National City Project Description: Kimball House Restroom Wheelchair Lift and Repair Project Estimate Description: Re -Mobilize CSI Description Quantity Unit Lab $/Unit Mat $/Unit Equ $/Unit Sub $/Unit Oth $/Unit Tot $/Unit Total Cost 02000 Sitework Edco Dumpster Daily Inactivity Charge 27 Days 0.00 0.00 10.00 0.00 0.00 10.000 270.00 (11/10/09 - 12/6/09) Wednesday 11-4-09 Not able to work. no 2 Men 202.44 0.00 0.00 0.00 0.00 202.440 404.88 soils engineer Skidsteer, 463 Bobcat 36" wi Trailer 2 Days 75.92 0.00 329.00 0.00 50.00 454.915 909.83 Sltework Total 1,584.71 Grand Total 1,584.71 Net Costs Subtotal 1;584.71 O & P 237.71 Subtotal 1,822.42 Subcontractor 0.00 Bond 18.22 Total Estimate 1,840.64 Thursday, December 03, 2009 Page 1 of 1 KIMBALL HOUSE BATHROOM AND WHEELCHAIR LIFT PROJECT 09-02 ,P0# Vendor: PO Amount Adj PO Amt PO Balance 72969 GA DOMMINGUEZ 54,491.00 28,233.56 KIMBALL HOUSE CONSTRUCTION (TOTAL AMOUNT FOR PROJ'$80,000) Account No. 511-409-500-598-3005 Amount ' 54,491.00 Acct Adjusted Amount '. 65,526.82; Balance '; 2 ®,2 3.56 Invoice Date Amount Invoice Number #1 7/31/2009 $ 6,265.80 8/31/2009 $ 9,406.26 #2 9/12/2009 $ 12,189.60 #3 10/15/2009 $ 9,431.60 #4 Total CIO No. 1 $ u.37,2•.26 Amount 490.00 Change Order Description WATER HEATER INSTALLATION 2 $ 253.05 FOUNDATION REPAIR, BATHROOM REPAIR, LIGHT POLE, RELOC. GATE-- actual C/O was $10,253.05 but there was $10,000 already encumbered on P.O. 3 $ 8,452.12 Change Order #3, Replace and removal of soil and new foundation for wheel lift 4 $ 1,840.65 re -mobilize 5 Total $ 11,035.82 Marina Gateway Streetscape FY 09-10 KIMBALL HOUSE MUSEUM PROJECT Project Coordinator: Adam Landa Specification Number: 09--02 Engineers Construction Cost Estimate: 54,491 Budget - Funding Source(s): Amount Account Balance tax increment funds tax increment funds INVOICE Total Budget Construction $ 70,000.00 511-409-500-598-3005 $ 70,000.00 $ 10,000.00 511-409-500-598-3005 $ 10,000.00 80,000.00 Advertisement Date: 2/27/2009 Requested Contingency Amount $ 25,509.00 Bid Opening Date: MAR 24,2009 Notice to Proceed Date: 17-Jun-09 Prime Contractor: GA DOMINGUE2 Purchase Order Date: 6/17/2009 Council Agenda Date: 5-May-09 Purchase Order Number: 72969 Resolution Number: 2009-89 Purchase Order Balance: $ 54,491.00 Engineering/Design Project Management RFP or Advertisement Date: 2/27/2009 RFP or Advertisement Date: 2/27/2009 Bid Opening or Agreement Date: Project Management Firm: Adam Landa Engineering/Design Firm: Agreement Date: Council Agenda Date: Council Agenda Date: 5-May-09 Resolution Number or CM signature date: Resolution Number or CM signature date: 2009-89 Purchase Order Date: 6/17/2009 Purchase Order Date: Purchase Order Number: 72969 Purchase Order Number: Purchase Order Balance: $ 54,491.00 Purchase Order Balance: Inspections Materials Testing RFP or Advertisement Date: 2/27/2009 RFP or Advertisement Date: Inspection Firm: Materials Testing Firm: Agreement Date: Agreement Date: Council Agenda Date: Council Agenda Date: Resolution Number or CM signature date: Resolution Number or CM signature date: Purchase Order Date: Purchase Order Date: _ Purchase Order Number: Purchase Order Number: Purchase Order Balance: Purchase Order Balance: Other Other RFP or Advertisement Date: RFP or Advertisement Date: Other: Other: Agreement Date: Agreement Date: Council Agenda Date: Council Agenda Date: Resolution Number or CM signature date: Resolution Number or CM signature date: Purchase Order Date: Purchase Order Date: Purchase Order Number: Purchase Order Number: Purchase Order Balance: Purchase Order Balance: OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax G. A. DOMINGUEZ Change Order #4 Kimball House Museum Judy Hernandez (Engineering) Forwarded Copy of Change Order to Contractor