Loading...
HomeMy WebLinkAbout2009 CON PTM General Engineering Services - Change Order #2 Safe Routes To School, FY 09-10coRYtiaArrip-,...._i CHANGE ORDER #2 December 23, 2009 Project: Safe Routes to School Specification #09-14 Contractor: PTM Engineering A Change Order is hereby recommended for the following work in the amount identified below: Description of Change in the Contract See Attachment "A". Justification for Change in Contract The original contract called for the supply and installation of traffic safety devices and equipment including solar -powered radar speed feedback sign units, solar -powered flashing beacon units, and pedestrian countdown modules. This City -initiated change order is necessary for the purchase and installation of padlocks on cabinets installed with the feed -back signs and beacon units. These padlocks are necessary to prevent vandalism of the components found within these cabinets that are essential for operations. The purchase and installation of padlocks was not contemplated by the original contract but is of the same type and character as the work performed in the original contract. PTM Engineering has experience with and is competent to perform the work contemplated in this change order. Cost Reconciliation See Attachment "A". Construction Contract Accounting Summary Original Contract Amount: 595,580.00 Net change by previously authorized Change Orders: 3,214.04 Line Item Adjustments: (5,425.12) Contract amount prior to this Change Order: 593,368.92 Amount of this change order: 1,167.25 New contract amount: $ 594,536.17 Original contract time (calendar days): 60 Previously approved additional working days: 0 Additional working days for this change order: 0 Total contract time (working days): (see Weekly Statement of Contract Time for completion date) Reviewed by: lr7 Principal Civil Engine Agreed to and Accepted by: 60 Recommended for approval by: i Da fe Projec Pro'ana er ' Cf q/'y an ager Date Contractor, Construction File, Project Manager, City Clerk Approved by. ty E g XWt� 1243 National City Boulevard National City, California 91950 Tel (619) 336-4380 Fax (619) 336-4397 CITY OF NATIONAL CITY Safe Routes to School Specification No. 09-14 ATTACHMENT "A" CO #2 Description: Contractor shall purchase and place padlocks on cabinets at the installed device locations found in the original contract. This change order is a lump sum price and the breakdown below is for reference purposes only. The total cost of this change order includes all material, manpower, equipment, overhead, profit and any and all other costs associated with this change in contract. There are no additional costs to the City. No. 1 Labor Foreman Description Hours/Quantity Rate 8 2 Equipment Ford F-250 Pick -Up 8 3 Material 60 Padlocks Total Price 34.70 277.60 Sub -total: 277.60 Surcharge Mark-up (11%): 30.54 Sub -total: Overhead/Profit Mark-up (20%): Total (Labor): 308.14 61.63 369.77 19.49 155.92 Sub -total: 155.92 Mark-up(15%): 23.39 179.31 1 537.54 537.54 Sub -total: 537.54 Mark-up(15%): GRAND TOTAL: 80.63 618.17 1,167.25 Cost Reconciliation: This change in the contract was reviewed and negotiated by and between City Representatives and the Contractor and represents the entire agreement for the work described herein and includes all costs associated with the work including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and there will be no other compensation. This Change Order hereby incorporates the original contract and all its referenced documents' terms, conditions, and plans for the work as provided by the City. OFFICE OF THE CITY CLERK 1243 National City Blvd. National City, California 91950 Michael R. Dalla, CMC - City Clerk 619-336-4228 phone • 619-336-4229 fax PTM GENERAL ENGINEERING SERVICES Change Order #2 Safe Routes to School, FY 09-10 Tess Corpuz (Engineering) Forwarded Copy of Change Order to Contractor