CHANGE ORDER # 2
CONCRETE IMPRROVEMENTS
AT VARIOUS LOCATION, Spec.
December 9, 2009
(AT IONALJ CITy
a°,1
#09-05
INCORPORATED '--�
Contractor: CREST EQUIPMENT, INC.
A Change Order is hereby recommended for the following work in the amount identified below:
Description of Change in the Contract
Contractor shall install the following: 1) Two (2) pedestrian ramps per SDRSD G-31 with G-30 truncated dome; 2) 4
feet width (min.) walkway lines with 4" white digonals at 3'-0" centers; 3) ADA logo painted in blue color; 4) ADA
parking signage (R99[CA]) with post and 5) Ten (10) parking space tripes to be removed and re -painted. See attached.
Cost Reconciliation
This change was reviewed and negotiated by and between the City Representatives and the Contractor and
represents the entire agreement for the work described herein and includes all costs associated with the work
including but not limited to manpower, equipment, labor, fees, taxes, insurance, bonding, overhead, profit, etc. and
there will be no other compensation. This Change Order hereby incorporates the original contract and all its
referenced documents' terms, conditions, and plans for the work as provided by the City.
Justification for Change in Contract
The original contract does not indicate the installation of two (2) pedestrian ramps and walkway lines at 'A" Avenue.
A citizen's concern and approval of City Council prompted the installation of pedestrian ramps and walkway stripes
at 916'A' Avenue to comply with ADA requirements.
Construction Contract Accounting Summary
Original Contract Amount: 188,750.00
Net change by previously authorized Change Orders: 650.00
Contract amount prior to this Change Order: 189,400.00
Amount of this change order: 5,490.00
New contract amount: $ 194,890.00
Original contract time (calendar days):
Previously approved additional working day
Additional working days for this change ordh
Total contract time (working days):
40
0
5
45
(see Weekly Statement of Contract Time for completion date)
Recommended for approval by:
oject Manager Date
Agreed to and Accepted by:
Crest Equipment, Inc. Date
Reviewed by:
PriricipaTCivil Engineer to
City ' ngineer Date
C Z`TS/a?
Date
cc: Contractor, Construction File, Project Manager, City Clerk
1243 National City Blvd., National City, CA 91950
CREST EQUIPMENT INC
161 SCOTTFORb DRIVE
EL CAJON ,CA 92021
619-444-5061 Phone
619-447-6540 Fax
Lic# A-892791
DBE/WBE #
36251
Proposal
Date
Estimate #
I 1 / 16/2009
756
Customer Name
Ship To
National City
916 A Ave
1243 National City Blvd
National City, CA 91950-4301
National City, Ca
Item
Description
Unit
Est. Quanity
Unit Price
Total
H09-05-12
Curb Ramp G3I Type D ADA
EA
2
I,500.00
3,000-00
#09-05-13
Modified curb Exposed Aggregate
LF
24
35.00
840.00
Striping
Striping includes unit lump suns
LS
1
1,650.00
1,650.00
Striping
Parking lot stall removed and reinstalled
EA
10
Striping
ADA Sign and Post
EA
1
Striping
ADA logo painted blue
EA
1
Striping
4' walkway lines to be installed per detail
existing lines to be removed black out
(sand/seal, grinding or sandblasted excluded)
Invoices must be paid 30 days or a 5% tinace charge will be applied
Total $5,490.00
business with you.
Upon Acceptance Please Sign & Return
Wendi Belio, President
I I 1 I_--
I1lIlI�l
i
EXISTING XPOSED AGGREGATE 11 I
I I 1 1
d
1 111 111
■■����
EXISTING BOLLARD TO BE REMOVE
11111
_�/
AND DISPOSE
4" WHITE LINE BORDERS W
" -
��•1��
4" WHITE LINE DIAGONALS
> AT 3'-0" CENTERS ` * -
o
. --_,
_1
\ -
-
INSPECTOR:
DATE COYPtETED:
MME nil
• W -
GATE
EXISTING POLE LIGHT - . .Millerilli
EXIST.
—I
OO ) AND BOLLARD - =1=MMIIIIIIIINIMIIIIIIMIII
\1�wMMIN11111111/41111111111♦1♦=111111111♦1♦1♦111111111=
1111111111111111•111/
NIMIIIIIIIIMIIIIMIIMIMIIIIIIIIIII
RIM
�������a���
����a��M�
1111111111111111111111111111
IIIII
■
`H
p
NEW ISLAN/
��������
T------------
IIMIWIRIMIIIIIIMIMMIENE
\
L.. k. \
A.
TRANSITIONAll____
���MO�
_.. �� ���������_
IIII;
G-2 TO
M�—��me
INIIINNIIIIIIIIIIMMINIMMIIIIIME==MMMI
MMI•���I
MMIIMMIllint=MMOS11111111111111111111111111111111111IMMrIIIIIIIIIIIMMINNI
c
ROLLED CURB
INSTALL NEW MODIFIED PED RAMP PER 0-31 1111111111RINIIIIIIIIIIMIIINI111111111111111111111•111•11111111111111111111=1==
pE1111111111111119
MINIIIMME�����M����
111111111111111=1111•111
WITH TRUNCATED DOME PER G-30 r--------1.11-----
v=MINt
.
M�� MI=������r�
IIIIIMIIMIIIIIIIIIIIII1'
����=
INSTALL NEW PED RAMP PER G-31 IMM�����lI�N������
WITH TRUNCATED DOME PER G-30
E
._ ���
_�=====_,�==��_���
MINIM
MIMI MN, EXPOSED AGGREGATE NMI
-__ ___ I
11111111111111
MIMI MIL
' min. atoll IMAM
d y. ADA LOGO TO BE PAINTED IN BLUE = 1•
1 T I
c
I
=M
III AO SIGN TO BE INSTALLED NI=
1 1 EXISTING BRICK PAVERS
MN 1 I
7
1 I
e
1 I I I PARKING SPACE
EXISTING LOT
6$
I I L E
1 1
i
c
REMOVE AND RESTRIPE 10 PARKING STALLS TO ACCOUNT
FOR NEW PED RAMP
INSTALLATION Of PEDESTRIAN RAMPS
916 'A" AVENUE, NATIONAL CITY
i
CITY OF NATIONAL CITY
—0.0
A.-0j
D
#1
#2
PO#
Vendor:
PO Amount
Adj POAmt
PO Balance
73236
Crest Equipment
8,750.01
194,890.00
96,829.64
Type of service
Account No...
Amount
Balance
Invoice Date
11/2/2009
301-409-500-598-6137
132,117.80
Acct Adjusted Amount
. 138,257.80
$
40,1.7. 4
Amount
98 060.36
Invoice Number
3655
Total
$
98,060.36
CIO No,
Amount
` Change Order Description;r
1
$
650.00
Relocating Pressure Regulator
2
$
5,490.00
Installation of Pedestrian Ramps & walkway lines at 916'A' Ave.
3
4
5
Total
$
6,140.00
Account No.
mount
301-409-507-598-6090
56,632.20
Adjusted Account PO; Balance
• 56,6 2. 0
Balance
Invoice Date
4, 48. 9
_ Amount,,,
Invoice Number
3648
9/19/2009
$ 52,283.31
Total
$ 52,283.31
C/O No.
Amount
Change Order Description
1
2
3
4
5
Total
$ -
ID
0
Task Name
Duration
Dec 13, '09
Dec 20, '09
Dec 27, '09
Jan 3, '10
T I F S
S
M [ T W T F S
S M j T W (T
F_ S_
S 1 M _T W T F S
S M T W T F
1
mark out & saw cut
rain no work
demo & pour
wash off for exposed finish
1 day
1 day
1 day
1 day
E
i
�L�4
--
r
2
3
Project A street ped ramps
Date: Mon 12/14/09
Task
Split
Progress
Milestone
^
Rolled Up Progress
External Tasks
Project Summary
i.
I Summary
.
Rolled Up Task
Rolled Up Split
Rolled Up Milestone
L, J
O
Page 1
OFFICE OF THE CITY CLERK
1243 National City Blvd.
National City, California 91950
Michael R. Dalla, CMC - City Clerk
619-336-4228 phone • 619-336-4229 fax
CREST EQUIPMENT, INC.
Change Order #2
Concrete Improvements, FY 09-10
Tess Corpuz (Engineering) Forwarded
Copy of Change Order to Contractor