Loading...
HomeMy WebLinkAbout2009 CON Koch Armstrong - Notice of Completion - Street Resurfacing Project FY 08-09-PLEASE COMPLETE THIS INFORMATION RECORDING REQUESTED BY: CITY CLERK OF NATIONAL CITY 1243 National City Blvd. National City, CA 91950 AND WHEN RECORDED MAIL TO: CITY CLERK OF NATIONAL CITY 1243 National City Blvd. National City, CA 91950 DO # 2009-0b49 1 9 1 1 IIIIIIII 01111 IIIII IIIII �� 1 IIIII 101 � 111 �� 111� 1111 �111111 OCT 92, 2009 1:16 PM OFFICIAL RECORDS SAN DIEGO COUNTY RECORDER'S OFFICE DAVID L. BUTLER. COUNTY RECORDER FEES: 0.00 PAGES: 2 I IIIIII IIIII IIIII IIIII IIIII 11111 III 1IIIII IIIII ulII IIIII11II NIII IIIII IIII IIII NOTICE OF COMPLETION: National City Street Resurfacing Project, FY 08-09 (Phase 2) (Please fill in document title(s) on this line) THIS PAGE ADDED TO PROVIDE ADEQUATE SPACE FOR RECORDING INFORMATION (Additional recording fee applies) • RECORDING REQUESTED BY WHEN RECORDED MAIL TO: CITY OF NATIONAL CITY 1243 NATIONAL CITY BOULEVARD NATIONAL CITY, CA 91950-4301 NOTICE OF COMPLETION CALIFORNIA CIVIL CODE SECTION 3093 NOTICE IS HEREBY GIVEN of the completion on September 15, 2009, of National City Street Resurfacing Project, FY 08-09 (Phase 2), Specification No. 08-04 Work of improvement or portion of work of improvement under construction or alteration. Various street sections throughout National City, CA Street address City State 91950 Zip Code The undersigned owns the following interest or estate in said property: ow N aR tN F cE Nature of the interest or estate of owner (mortgagor, lessee, etc.) Said work of improvement was performed on the property pursuant to a contract with Koch -Armstrong General Engineering, Inc. Name of Original Contractor The following work and material were supplied: Laborer Groups, Bob Cat, Trucks, Temporary Pumps, Cement Masons, Operators, Paving Equipment, Traffic Control Equipment, Sweeper, Loaders, etc. General statement of kind of labor, services, equipment or materials The names and addresses of co -owners are: N/A 1 Joint tenants, tcnants in common, or othe owners Dated: September 15, 2009. Ron Morrison, Mayor City of National City, 1243 National City Blvd., National City, CA 91950-4301 I, the undersigned, say: I have read the foregoing Notice of Completion, and know the contents thereof; the same is true of my own knowledge. I declare under penalty of perjury that the forgoing is true and correct. Executed on Sept er 15, 2009, at National City, California. Signature: RON MORRISON, MAYOR NOC 08-04 FINAL CONTRACT BALANCE CHANGE ORDER DATE: September 15, 2009 PROJECT: National City Street Resurfacing Project, FY 08-09 (Phase 2). Specification No. 08-04 TO: Koch -Armstrong General Engineering, Inc Mr. Chris Armstrong / Mr. Monty Koch P.O. Box 1190 Lakeside. CA 92040 ORIGINAL CONTRACT AMOUNT: START DATE: COMPLETION DATE: ORIGINAL CONTRACT LENGTII: EXTEN"I'ION OF WORK DAYS: TOTAL CONTRACT TIME: DESCRIPTION OF CHANGE: S5,327,000.00 June 30, 2008 August 10, 2009 (includes downtime due to multiple change orders, cleanup, and inspection) 90 calendar days 0 calendar days 90 calendar days This change order is written to balance and finalize the amounts for said project. Original Contract Adjusted Contract No. Item Unit Bid Qty Unit Price Amount Qtv Unit Price Amount 1 Mobilization I,S 1 $33,506.31 S33,506.31 1.37 $33,506.31 S45,748.06 2 Traffic Control LS 1 $ 146,300.00 $146,300.00 1.35 S 146, 300.00 $197,955.65 3 Cold '.Milling $1 85,704 !WA 7 S40,280.88 71,576.00 $0.47 S33,640.72 4 '/a" reveling course Si 1,559,631 $0.59 $920,182.29 1,502,595.00 $0.59 S886,531.05 5 Asphalt Rubber & Aggregate Membrane (ARAM) SY 378.002 S6.18 $2.336,052.36 353,730.81 S6.18 $2,186,056.41 6 Asphalt Rubber Ilot Mix Gap Graded (ARHM) 51-, 312,381 $ I.04 $324,876.24 249,980.00 $ I_04 S259,979.20 7 Type II Slum SY 294,266 $1.72 $506,137.52 384,392.58 $1.72 8661,15524 8 R&R asphalt over 8" Class 1I Base SF 85,335 $5.75 $490,676.25 120,620.38 $5.75 5693,567,16 9 R&R 3" Avipjtalt Only SF 27.507 S2.60 S71,518 20 17,398.00 $2.60 S45,234.80 10 Crack Filling 1 S I $05,600.00 S95.600.00 1.39 S95.000.00 5132,821.27 11 R&R G7 Sidewalk S1- 9.955 $7.60 $75,658.00 34,646.00 $7.60 S263,309.60 12 R&R GI Curb Only 1,1 246 842.50 $10.455.00 473.00 $42.50 S20,102.50 13 R&R G2 Curb and Gutter 705 $45.00 835,775.00 1,892.00 S45.00 S85,140.00 14 R& R driveway G14 SF 1,155 $11.55 S13,340.25 4,827.00 $11.55 S55,751.85 15 R&R alley apron G 17 SF 396 $12.5(1 $4,950.00 2,227.00 $12.50 S27,837.50 16 R&RCross gutter Gl2 SF 1,623 $17.90 $29,051.70 2,691.50 $17.90 S48,177.85 17 R&R curb and gutter LF 0 - - - 18 Ped Ramps G27-G31 EA 14 $2,065.00 $28,910.00 25.00 $2,065.00 S51,625.00 , Page 1 FINAL CONTRACT BALANCE CHANGE ORDER 19 Adj. Swr MU to Grade per SDRSD LA 155 $245.00 $37.975.00 133.00 $245.00 $32,585.00 20 Adj. Swr CO to Grade per SDRSD EA 11 $365.00 $4.015.00 7.00 $365.00 S2,555.00 21 Adj. Survey Mon. to Grade per SDRSD LA 16 $300.00 $4,800.00 17.00 $300.00 S5,100.00 22 23 Replace Traffic Loops LA 38 $370.00 $14.060.00 102.00 $370.00 $37,740.00 Restriping of Street including thermoplastic street markings, curb markings, and street traffic markers LS 1 $63,300.00 $63,300.00 2.08 $63,300.00 $131,427.24 24 ARHM-GG WARRANTY Line Item Removed 25 Signs (12 of NC 30"x30") EA 12 $435.00 $5,220.00 12.00 $435.00 $5.220.00 26 Signs (I2ofCIWML3 18"x24") EA 12 $380.00 $4,560.00 12.00 $380.00 $4,560.00 27 Asphalt Concrete TON 230 $122.00 $28,060.00 151.23 $122.00 $18,450.06 28 6" Asphalt Dike LF 145 $12.00 $1.740.00 33.50 $12.00 $402.00 St 131 OTAL (Before and 'er line item increases) S5,327,000 55,932,673.15 C01 ADD fencing Kimball Park Skate Park LS I $4,991.00 $4,991.00 CO2 ADD skate surtace Kimball Park Skate Park LS 1 S16,517.00 $1 6,517.00 CO3 Add line items and unit pricing for removal & dig outs of AC & hill street sections NO COST CHANGf ORDER C04 R&R 11-Curb at W 18`n' St and McKinley Ave. LS 1 $2,267.50 $2,267.50 CO5 ADD 7 4'x4' information signs LS 1 $12.040.00 $12.040.00 C06 increase nominal strength of concrete to 4000 psi NO COS CHANGE OR1)[R Col ADD application of pC herbicide LS I $4.615.00 $4,615.00 C08 ADD Supervisor services from American Ramp for Kimball Park Skate Park fixtures LS 1 S10.180.00 S10.180.00 C09 ADD nnisc. tools, crew truck & labor for Kimball Park Skate Park installation LS I S 11.782.43 S 11.782.43 C010 ADC) labor for installation of equip. for park furnishings at Kimball Park LS I S20.135.00 S20135.00 Page 2 FINAL CONTRACT BALANCE CHANCE ORDER C011 ADD F Ave. striping LS 1 $1.063.75 $1,063.75 C012 ADD Free Trimming Services 1_S 1 $3.849.00 $3,849.00 C013 ADD I ree I rumum!, Services LS I $3.849.00 53,849.00 C014 ADD traffic stencils per new traffic standards LS 1 $4,970A0 $4,970.00 C015 Valley Road Sidewalk Improvements LS 1 $ 184,065.75 $ 184,065.75 C016 R&R I Mil Cover system at Li „1' & 1 Ave I.S 1 $4.896,00 S4,896.00 C017 R&R 1 MI Cover system at F. 27H & 1) Avc LS 1 $4,896.00 S4,896.00 C018 ADD labor for removal and installation of park Furn at Kimball Park LS I $1,753.37 $1,753.3, C019 ADD Yield Pvmt markings at W Ili', St & Coolidge Ave LS 1 S1,016.00 $1,016,00 CO20 ADD Latex additive for NCB slurry. btwn 18'h & 33' St LS 1 52,779.22 S2,779.22 CO21 ADD Rubber I Ire Roller (R 1 R)for NCB Slurry LS 1 S3,240.29 S3,240 29 CO22 Install Bicycle Lanes on Hoover and Coolidge Aves btwn Civic Ctr Dr & \V 18'i' St LS 1 S4,955.00 S4.955.00 CO23 ADD I Ierbicide/Stumpp Remov-al I S I S72.1.00 5721.00 CO24 Sweetwater Road sidewalk and rel wall f"S I 7 s $_.b:�. Uo $27,835.00 Change Order subtotal 3i2, 117.31 GRAND TOTAL $6,265,090.46 Page 3 FINAL CONTRACT BALANCE CHANGE ORDER DISCUSSION: Added line items: Changes Order Numbers One through Twenty -Four were added for an aggregate total of $332,417.31. During the course of construction, field conditions were discovered, time -sensitive work, or Ctiy-initiated change orders were approved and added to the project with the following 24 change orders: 1) Addition of fencing for the Kimball Park Skate Park, 2) Addition of skate surface for the Kimball Park Skate Park, 3) Addition of line items and unit pricing for removal and replacement (dig outs) of AC and full street sections (No Cost), 4) Remove and replace "H" curb at W 18th St and McKinley Ave, 5) Addition of 7 4'x4' information signs, 6) Change strength of concrete to 4000 psi (No Cost), 7) Addition of application of herbicide, 8) Addition of supervisor services from American Ramp for Kimball Park Skate Park fixtures, 9) Addition of tools, crew truck, and labor for Kimball Park Skate Park installation, 10) Addition of labor for installation of equipment for park furnishings at Kimball Park, 11) Addition of F Ave striping, 12) Addition of tree trimming services, 13) Addition of tree trimming services, 14) Addition of traffic stencils per new traffic standards, 15) Valley Road Sidewalk Improvements, 16) Remove and replace 1 manhole cover system at E 27th St and A Ave, 17) Remove and replace 1 manhole cover system and E 27th St and D Ave, 18) Addition of labor services for removal and installation of park furnishings at Kimball Park, 19) Addition of yield pavement markings at W 11t" St and Coolidge Ave, 20) Addition of latex additive for National City Blvd Slurry Seal between 18th St 3rd and ��? St.. 21) Addition of Rubber Tire Roller equipment for National City Blvd Slurry Seal between 18`1' St and 33i1 St.. 22) Addition of bicycle lanes on Hoover Ave and Coolidge Ave between Civic Center Dr and W 18th St., 23) Add additional herbicide and stump removal at National City Blvd, and 24) Addition of missing sidewalk and retaining wall at Sweetwater Road east of Prospect Ave. Page 4 FINAL CONTRACT BALANCE CHANGE ORDER Therefore, the construction bid price of $5,327.000.00 was increased by $332,417.31 to $5,659,417.31. Furthermore. line item increases/deductions as shown in the final balance change order totaling $605,673.15 were added to the scope of work per the contract and specifications. This included the E 411' St and M Ave drainage improvements work performed in June of 2009 due to citizens' concerns and deteriorated conditions discovered while work was in progress and additional street sections. Therefore, the construction cost of $5,659,417.31 was increased to a final construction cost of $6,265,090.46. CONTRACT ADJUSTMENT: As a result of this change order, the contract price is adjusted as follows: 1. 2. The final contract price to date is adjusted to S6,265,090.46. As a result of the satisfactory completion of said project, a retention and final balance of S163,691.49 is set for invoice processing and payment upon the receipt of required signatures and City Council's ratification of this agreement and the Notice of Completion. This document and its purpose to balance payment shall be considered full compensation for furnishing and installing the materials, labor, tools and equipment, profit, overhead, and all incidentals for performing the work described above. Koch -Armstrong General Engineering, Inc. will not be entitled to damages or additional payment for delays as described in the 1997 edition of the Standard Specifications for Public Works Construction, Section 6-6.3, for performing the work as described above. Page 5 FINAL CONTRACT BALANCE CHANGE ORDER RECOMMENDED FOR APPROVAL BY: e Associates onager (Consultant) 9—g --(D.? DATE Kenneth Fernandez 0 DATE CIVIL ENGINEERING TECHNICIAN NATIONAL CITY PROJECT COORDINATOR REVIEWED BY: 111 aneshfar,P.E. PRINCIPAL CIVIL ENGINEER CITY ENGINEER ACCEPTED BY: 09 0 / DAT 41.(41(o1 DATE Koclimstrong General Engineering, Inc. DATE CONTRACTOR Ron Morrison MAYOR City of National City Resolution Number: h- 0 DATE Page 6 RESOLUTION NO. 2009 — 225 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF NATIONAL CITY ACCEPTING THE WORK PERFORMED BY KOCH-ARMSTRONG GENERAL ENGINEERING, INC. FOR THE TOTAL FINAL AMOUNT OF $6,265,090.46, AUTHORIZING THE MAYOR TO SIGN THE FINAL BALANCE CHANGE ORDER, AND AUTHORIZING THE FILING OF A NOTICE OF COMPLETION WITH THE COUNTY RECORDER FOR THE NATIONAL CITY STREET RESURFACING PROJECT, FY 08-09. BE IT RESOLVED by the City Council of the City of National City as follows: It appearing to the satisfaction of the Engineering Department that all work required to be done by Koch -Armstrong General Engineering, Inc., for the total final amount of $6,265,090.46, for the National City Street Resurfacing Project, FY 08-09, has been completed, the City Council of National City hereby accepts said work, authorizes the Mayor to sign the final balance change order, authorizes the filing of a Notice of Completion, and orders that payment for said work by made in accordance with said contract. PASSED and ADOPTED this 15th day of September, 2009. on Morrison Mayor ATTEST: hel R. Dalla ,ti Mic , City Clerk APPROVED AS TO FORM: u sec George H. Eiser, City Attorney Passed and adopted by the Council of the City of National City, California, on September 15, 2009 by the following vote, to -wit: Ayes: Councilmembers Morrison, Parra, Sotelo-Solis, Van Deventer. Nays: None. Absent: Councilmember Zarate. Abstain: None. AUTHENTICATED BY: RON MORRISON Mayor of the City of National City, California / jitliA14 City CI yof the City of ational City, California By: Deputy I HEREBY CERTIFY that the above and foregoing is a full, true and correct copy of RESOLUTION NO. 2009-225 of the City of National City, California, passed and adopted by the Council of said City on September 15, 2009. City Clerk of the City of National City, California By: Deputy c aooct,• City of National City, California COUNCIL AGENDA STATEMENT MEETING DATE September 15, 2009 AGENDA ITEM NO. 13 ITEM TITLE A Resolution of the City Council of the City of National City accepting the work performed by Koch -Armstrong General Engineering, Inc. with the final amount of $6,265,090.46, authorizing the Mayor to sign the final balance change order and authorizing the filing of the Notice of Completion with the County Recorder for the National City Street Resurfacing Project, FY 08-09. (Funded through Gas Tax, Traffic Congestion Relief, Proposition A and 1 B Funds and CIWMB Grants). PREPARED BY Kenneth Fernandez EXPLANATION Please see attached page with explanation. DEPARTMENT EXT. 4388 Development Services/ Engineering Environmental Review X N/A MIS Approval Financial Statement Approved By: Finance Director Project was funded by Account numbers: 109-409-500-598-6035 (Gas Tax), 307-409-500-598-6035 (Prop A), 345-409-500-598- 6035 (Traffic Congestion Relief), 346-409-500-598-6035 (Prop 1B), and 296-409-500-598-6035 (CIWMB Grant) per Resolution No. 2008-107. Retention will be paid via Traffic Control Relief then Prop A funds. Account No. STAFF RECOMMENDATION Adopt the Reso BOARD / COMMISSION RECOMMEND TION N/A ATTACHMENTS (Listed Below) 1. Resolution 2. Contract Final Balance 3. Notice of Completion Resolution No. °" ° 0 a A-200 (Rev. 7/03) SPEC 08-04 NOC City of National City Office of the City Clerk 1243 National City Boulevard, National City, CA 91950-4397 Michael R. Dalla, CMC - City Clerk (619) 336-4228 Fax: (619) 336-4229 September 23, 2009 David Butler Assessor / Recorder / County Clerk County of San Diego P.O. Box 121750 San Diego CA 92112-1750 Dear Mr. Butler: We are submitting the following documents in duplicate for recording: NOTICE OF COMPLETION: National City Street Resurfacing Project, FY 08-09 (Phase 2) Please note the recording information on the duplicate copy provided, and return it to the Office of the City Clerk. Sincerely, A Michael R. Dalla, CMC City Clerk Enclosure ® Recycled Paper